Solid waste and recycling items in Durham County, between 27 Nov 2025 and 27 Nov 2026
7 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
What these items are about
The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.
Show these numbers as a table
| Subject | Items |
|---|---|
| Solid waste and recycling | 7 |
| Contracts and procurement | 4 |
| Intergovernmental agreements | 2 |
| Public facilities | 2 |
| Environment and sustainability | 1 |
| Water and sewer | 1 |
-
Lets the manager amend the county's contract with the City of Durham to take trash and yard waste from county convenience sites at the city transfer station, up to $220,000 in FY 2027.Approved on consent
-
Pays $1,861.78 in dues to Central Pines Regional Council for planning and technical help to the Triangle Region Solid Waste Consortium.
-
26-0506 Consent of Access for NCDEQ and the U.S. Army Corps of Engineers to the 3847 Redwood Road SiteLets state environmental regulators, the Army Corps of Engineers and their contractors onto 3847 Redwood Road to investigate an old unregulated landfill and, if needed, clean it up, and consents to land-use restrictions. Staff say the Sheriff's training facility on the property is not being built on the landfill.
- 3847 Redwood Rd · 90 acres · County of Durham
-
Contract with McGill Environmental Systems for $569,660 to transport and dispose of about 7,000 wet tons per year of Triangle Wastewater Treatment Plant residuals.
-
A one-year extension (through June 2027) of the county's curbside recycling contract with GFL Environmental for unincorporated Durham County, not to exceed $513,874.36, with a cost increase tied to the contract's CPI cap.
-
A $5,304.07 change order to Wilson & Cofield Electric for the generator at the Northern Convenience Site, needed after site conditions moved the concrete pad, plus a $39,541.36 contingency. The project total becomes $440,259.07.
-
Improvements to the Redwood convenience centre, the solid waste and recycling drop-off serving the unincorporated eastern part of the county.Staff or committee report Solid waste and recycling
Download these items as CSV Where else this comes up
Follow this
These links carry the filters above. Put one in a feed reader or a calendar and it keeps answering the same question as new meetings are collected — no account, and nothing about you is stored.