Joint Public Hearing

Town of Knightdale · Joint Public Hearing
Thursday, October 15, 2026 at 7:00 pm · 950 Steeple Square Court, Knightdale, North Carolina 27545

Public hearing Land conversion and large developmentPolice and public safetyPublic facilitiesRezoningState legislative agendaSubdivision and site plansZoning text amendment

What was decided

  1. Received 3.aZMA-4-26 Knightdale Gateway Phase 3 Hearing closed; referred to the Land Use Review Board
  2. Received 3.bZTA-2-26 Legislative & Quarterly Updates Hearing closed; referred to the November Land Use Review Board meeting

Read from the agenda's recorded outcomes. Where the board published minutes, those are the record — this is a pointer to them.

What's on this agenda

Beacon Partners asks to rezone land for a third phase of Knightdale Gateway, the industrial park it built along Farmwell Road. The request, ZMA-4-26, is a planned unit development on a manufacturing and industrial base, with a master plan, viewshed drawings, a trip generation memo and a stream and wetland report attached.

The second hearing is ZTA-2-26, a staff text amendment that brings the town's development ordinance into line with recent state laws, alongside quarterly updates. The Town Council and the Land Use Review Board hear both cases together, as they do each month.

Summarized from the published agenda. Read the agenda itself before acting on it.

Meeting recap

What happened, drawn from the records published after the meeting. Recording

The council and the Land Use Review Board closed both hearings and sent each case to the board for a recommendation, by voice vote. Nobody from the public spoke on either. This account comes from the meeting recording's automatic captions, because the staff reports would not open from this machine.

On Knightdale Gateway Phase 3, staff described a single industrial building for uses such as light manufacturing, research, warehousing, breweries and labs, with every other industrial use barred. Staff asked for a bus stop and shelter, extra landscaping at Farmwell Road and Milburnie Lake Drive, a payment toward town wayfinding signs, and a further look at River District crosswalks. Council members backed those conditions. They asked about tall retaining walls, keeping the pines along Farmwell, rooftop solar and more bike parking. Mark Frederick of Parker Poe, for Beacon Partners, and the developer's team said they would build the bus stop pad and pay the signage fee. They said solar had not worked for their industrial tenants so far. On ZTA-2-26, staff walked through changes that state law now requires. They include longer vesting periods for approved plans, no permits for home businesses that have no outside impact, lower window requirements on some facades, and no minimum parking counts. Staff also proposed taking jails out of the public safety facility definition and counting ATMs as drive-through service. Staff said the amendment would come back to the council in November.

How the votes went

Agenda adopted by voice vote. ZMA-4-26: hearing closed and the case referred to the Land Use Review Board, by voice vote. ZTA-2-26: hearing closed and referred to the board's November meeting, by voice vote. The recording does not record a roll call or any dissent.

Who spoke

No members of the public spoke.

Read from the recording's automatic captions, which misrender names and numbers — "Kildaire" comes through as "kill dare". Treat a name or a figure here as a pointer to the video, not as the record. Members of the public are private residents and are not named or indexed.

Full transcript

Automatic captions from the recording, "Knightdale Joint Public Hearing - October 15, 2026". Runs 55 min. These are machine transcriptions, not a court record. They misrender names and figures — "Kildaire" comes through as "kill dare", and case numbers arrive as noise. Each timestamp opens the video at that moment, which is how a passage here gets checked against what was said.

Read the transcript (25 passages)
[0:05:25]

All right. We are going to go ahead and get started. Welcome to our um joint public hearing. Thank you all for joining us. Thank you to our board members for joining us as well. And we are going to start with the adoption of the agenda. Any changes to tonight's agenda, questions, comments, or motion to adopt as is?

Motion to adopt.

Second. All in favor?

I.

Any opposed? Majority approves. Motion carries. We will move to our first item on the joint public hearings, ZMA-4-26, Knightdale Gateway phase three.

Good evening, Mayor, Council, alert members. I hope everyone's doing well tonight. The first item on the agenda, as the Mayor stated, is going to be ZMA-4-26, which is Knightdale Gateway phase three, also known as Adams Assemblage, and this is a planned unit development within MI. So, a little bit about the property. It is currently zoned as in my PUD as well as rural transition. The current lot, or the proposed lot, is approximately nine acres, and the current land uses are going to be vacant as well as manufacturing industrial and single-family residential. A little bit about the surrounding land uses. The predominant zoning classification is going to be RT, with that being rural transition to the northeast and south. To the west, we have commercial and industrial, with that always being phases one and two of Knightdale Gateway. So, here is the proposed master plan. I'll go into more specifics later on within the presentation. That being said, the proposed zoning classification is in my PUD, and throughout my presentation, I'll be going over development allowances, conditions, as well as site aspects and comprehensive plan consistency. Again, so a little bit more detail. The

[0:07:25]

proposed site is about 100,000 square feet of industrial with 95 parking spaces, and the applicant is Beacon Partners. She was both the applicant for phases one and two of Knightdale Gateway. So, this is the project timeline. I won't go into any really specifics here, but the main things to point out is this all started back on May 13th and then they were able to have their neighborhood meeting on June 30th with the DRC review and approval on September 10th. As far as public notifications are concerned, all aspects have been met with signs and letters been placed and mailed on September 29th as well as the legal ad posted in the Awake Weekly on October 2nd and 9th. So a little bit about the history of the parcel. Phase 1 was approved back in 2022 which contained over 500,000 square feet of industrial as well as that project has now since completed. Actually one of the parcels that are contained within tonight's rezoning is a out parcel as a result of phase 1 and then with phase 2 with a ZMA 6-23 was approved back in 2024 which contained over 34,000 square feet of retail office and split a flex space. So again, I mentioned this a little bit ago, but they did have their neighborhood meeting back on June 30th through virtually on Zoom and only two people attended that meeting with the comments more or less going over rezoning process and permitting processes. As far as the DRC, like I said, they reviewed and approved this on September 10th and voted unanimously to forward the ZMA and master plan to town council to tonight's meeting. Again, this is just another image of the master plan itself. Some other notes of the plan is that they are going to have some river district theme crosswalks since it is located within our river district district area plan as well as having identical architectural standards

[0:09:26]

as both of our phases one and two. So to go into a little bit more about the permitted uses that the applicant will have on site um, going to be light manufacturing, research and development, storage, warehouse, and indoor storage, uh, wholesaling and distribution, uh, brewery, winery, and distilleries, as well as laboratory uses. Uh, an important note here is since this is is a PUD rezoning that all other uses permitted within the MI district will now be prohibited. Um, so only these uses will be able to be allowed on site. Uh, in addition, um, all of the uses will be required to adhere to their additional standards within chapter five of our UDO. Um, so before I get into landscaping, I do just want to point out that there are some severe topography changes on site. Um, so how the site will look if it is approved and developed, um, is from Farmville Road, um, the site will actually sit lower than Farmville Road, and then as you go back, the site elevates. Um, so uh, on the front of the Farmville Road, we'll have a retaining wall that drops, and then as you get back on Milburnie Lake Drive, um, then it'll be picked up. Um, but, um, those retaining walls are exempted by our ordinance as far as height requirements, but the applicant has stated willingness, um, to avoid tall monotonous walls to break those up and tier them in appropriate locations, um, where it's feasible. Um, so going into the buffers, um, since there are some residential zone districts around it, um, the it it will be a type D buffer, which is 50 ft, uh, which will also feature a 6 to 8 ft masonry wall, as well as vegetation. And it is in compliance with our UDO on their site plan. Uh, furthermore, uh, parking lot landscaping generally meets our requirements. Um, they will also be having enhanced landscaping, um, on the front of Farmville, right before the retaining wall drops, um, as well as a Milburnie Lake Drive, right at that corner, as soon as you go into the, um, Milburnie Lake. Um, one thing to point out though is that the applicant is requesting a minor modification, um, in

[0:11:27]

front of the parking area that is going to be retaining wall on Milburnie Lake Drive, um, just because of some easements there as well as the retaining wall, um, prohibits them from being able to meet the full requirements. And I'll go into that a little bit more, uh, in a minute. As far as parking is concerned, they have 95 parking spaces on site as I mentioned. Um, this is below our maximum four parking requirement, uh, and also includes two EV spaces and 10 bicycle parking or 10 bike racks. As far as public gathering spaces, uh, the applicant has, uh, produced more than enough, uh, with 14 1400 square feet, uh, with two separate locations being offered. Um, one will be located adjacent to Millburny Lake Drive, uh, and the second being in the middle of the site. Both of the areas will contain, uh, picnic tables, canopy trees, benches, etc. Um, as far as the water allocation policy is concerned, the applicant has met all of the required points. Um, they do do achieve their 50 points, um, through, uh, bio-retention and underground stormwater catch capture system, um, exclusive use of native plants that are true North Carolina, as well as installation of town wayfinding signage and enhanced roadside landscaping. Um, going back to what I mentioned a little bit earlier, um, they are proposing some River District green crosswalks within their site. There is three proposed, uh, one going across Millburny Lake Drive and the other two, um, across their driveways. Um, that being said, we are still working on some details to make sure that everything can be done safely, um, to ensure that the crosswalks will still be serving their purpose for pedestrian safety. As far as the TIA or transportation analysis goes, um, there is none required at this site since this producing a fewer uh, trips and then is required of our TIA, TIA. Um, therefore, no transportation improvements are required or, uh, recommended. Um, going a little bit more into detail, um, they do propose a the Millburny Lake Drive extension onto the edge of the property line, uh, and the alignment is

[0:13:28]

generally consistent within RCTP or street network map. Additionally, it will provide for future connectivity to Legacy Oaks Drives and Old Milburnie Road. That being said, they are requesting identical the identical modified Avenue cross-section within what was approved within phase one of this development. So, continuing the same type of street cross-section. As far as the bus stop that was approved within phase two of the development, um the applicant has stated willingness to go ahead and develop this if this project if ZMA 4-26 develops first. In addition, they will have pedestrian access to the site, but staff also recommends the addition of a bus shelter in order to make this a true um premium bus stop which is identified within our comprehensive plan as it's along our BRT corridor. Um so, a little bit about the planned unit development rezoning process itself. As I mentioned, the proposed base district is manufacturing and industrial with all the district standards being met and

[clears throat]

and then as far as conditions are concerned, Council, we can request but not require additional conditions. Um so, start going into some of the site development allowances. There are a handful. So, with the first being is instead of a 100-ft setback from any current residential property, um the applicant is requesting a 50-ft setback which is more or less the landscaping buffer yard. So, that is more more or less be their setback. Um the second one being like I mentioned earlier to use that same cross-section for Milburnie Lake Drive that was approved within phase one of the development. Um the third is what I mentioned before that shrubs or that shrubs be allowed to fulfill the parking buffering requirement adjacent to Mill Burney Lake Drive towards where the area is a

[0:15:28]

retaining wall is and staff is also requesting that additional shrubs be placed at the bottom of that retaining wall to provide adequate vegetation. As far as cross accesses go, we are requesting or the developer is requesting a relief from this. The reason because the reason being is because of the environmental integrity of the site. Unfortunately, there's not really a good area to have a proper cross access unless it's at the very back of the site, which is where their loading area is. Additionally, if the cross access was there, then we would have to break up that type D buffer and then therefore the back of the loading area could be visible from the neighboring properties. As far as the architectural standards are concerned, like I said, these are identical identical identical architectural standards that were approved within phases one and two. So, all of the buildings should have a similar appearance and facades. And here goes some renderings of those developments. As you can see, it's very similar to what was approved within phase one almost to the T as far as a building design and layout. Here goes some images of the site. So, this is what it'll look like from well, from view one and view three. This is what it'll look like from the edge of the property line. So, looking at that buffer wall and looking into the property. As you can see, you can see the masonry wall and then on the left on the right image, you can see the Let me see if I can the um retaining walls there as well with the type D buffer wall. And then the middle image is just an aerial shot of what the site would look like at the end. So, going back, like I said, these will be the permitted uses, like manufacturing, research and development, um storage and indoor uh storage, wholesaling and distribution, brewery, winery, and distilleries, and laboratory uses. Uh and lastly I mentioned staff does

[0:17:29]

have a handful of recommendations or commitments and conditions um that the applicant uh should be uh thinking about to add. Um the bus stop identified within ZMA 6-23 be constructed a part of uh ZMA 4-26 um and as long as 4-26 develops first. Uh in addition that a bus shall bus shelter be added. Um the enhanced landscaping shall be provided along the corner of Farm Well and Milburnie Lake Drive. Uh a fee in lieu payment shall be required for the town wayfinding signage. Um so uh town staff as well as public uh the public works department um can figure out where the best place for a new town wayfinding sign would be. Uh and then finally investigate the feasibility of installing the River District crosswalks um to ensure um that

[clears throat]

uh all safety concerns are able to be met. Uh in addition to the applicant has stated um that they would be willing to handle the ongoing maintenance of said crosswalks. Um so going into the comprehensive plan, uh we are required to adopt any uh uh a comprehensive plan statement regarding conformity to our land use plan or nonconformity to our land use plan um as explaining the public of why it's in their interest. Um going further into details itself um within um the intentional growth areas map, this area is located within the target growth area, uh which means that uh this is a this site is ready to be developed. Um it has uh available water and sewer nearby um and this is the areas of town that we would want to see developed first. Going into our urban small town framework map, this kind of sets our transportation uh as well as our activity centers within uh the town of Knightdale. And so, predominantly within our transit-oriented BRT corridor and transit-oriented development activity center. Um, so, meaning that uh site should be uh focusing on increasing ridership. So, so, um more additional public transportation

[0:19:29]

can be offered within the town of Knightdale and really focusing on increasing that ridership. Um, and then the mixed-use activity center really speaks on the economic growth of the town in the future as well as mixed-use developments in general. Um, as far as our future place type map, um this site sits kind of at the cusp of an innovation center and a mixed-use center. Um, with innovation centers uh emphasizing technology, creativity, innovation, uh and supporting a wide range of uses such as manufacturing, light industrial, um as well as additional uses. Um, while our mixed-use center uh serves a broader economic needs of the town of Knightdale um as well as entertainment and housing needs. Um, so, within our place type description, um this is uh located within an activity center. So, typically, these are our most dense areas of town. Um, according to our side passing greenways map, um there are no identified um side paths or greenways required to be built out by this project. Uh, road roadway network map, uh Milburnie Lake Drive extension does allow for the future connection um to Legacy Oaks and Milburnie Road. Um, so, out of our comprehensive plan our guiding principles, um staff has found four uh to be applicable to this development uh with the first being planned and orderly growth, town-wide placemaking, economic vitality, as well as multimodal transportation. Uh, within our river district, uh staff has found that uh the site is compliant with our river district plan by offering a green storm water mechanisms as well as architectural standards that are in line with our with our river District plan, uh in addition to offering River District themed crosswalks throughout the site, which is identified within our River District land use plan. Um out of our strategic plan, there are two um areas that were identified uh with the first being connected and inclusive, and the second being sustainable. Uh and with that being said, I would love to answer any questions uh that may be for staff.

[0:21:33]

Thank you so much.

Thank you.

Bringing it to the council, are there any questions?

So, So, um on the I was sort of curious about the walls being exempted. Is that something um that you're saying that they're they're uh complying with or or you know, sort of modifying the walls, but is there something within our our UDO text that we can change to make sure we don't get these or proposed tall walls in the future, I guess is really where I'm going with that question.

I That would be I feel like a discussion that we would probably need to bring back at another time. Um there is some legislation within the General Assembly that may prevent us from changing that ordinance, um but currently they are exempted by our UDO.

And then the other thing is along that frontage of Farmwell, uh you know, one thing that's pretty noticeable and it's I think it's sort of a gateway or the really tall pines and just tall vegetation. Will any of that be able to to be preserved or will it have to be taken out and sort of replanted?

Got you. Um so, they will be retaining all of the vegetation that is contained within the buffer area. Um as far as the vegetation that they are going to keep on site, um that will if it is approved, we'll learn more about it within the CD phase. Um hopefully we can preserve as much trees as we can, um so then that way that'll also provide some relief to the applicant um to to prevent planting as much trees as I'm to find a replacement.

And then lastly, I support the staff's recommendations that you put up there on the screen.

Thank you.

Yeah, absolutely echo that support for the staff recommendations. I'll be honest, I had to dig deep to like come up with pieces of feedback here. Um, the existing development I think is you know, visually appealing. It's a you know, great asset to the town and you know, it's it's something that you know, I look at every day. It's nice to look at. Um, the kind of two things uh, and

[0:23:35]

this is kind of a question for staff, too. Um, the first thing is on the residential side of the ledger, we've had a lot of success with um, you know, pre-wiring homes uh, for solar. Uh, you know, and I don't know on this side of the ledger, I'm not as familiar with like what the different options are. I know the end user typically have some specific things they want out of the building construction, but if there's some kind of equivalent to making that an easy choice if they're incorporating solar or something like that, pre-wiring the building uh, for that. Um, I'd love to see something like that uh, happen here. We've seen some of the really cool like microgrid stuff uh, in neighboring Wendell. Love to see something like that in Knightdale. Um, the other one is the bike parking. Um, there's 10 spots and I know we probably don't envision too much bike, you know, customer traffic here cuz I kind of envision this is they're buying bigger things from these places, but the employees um, you know, could very easily be biking to work. I mean, this is neighboring residential areas and so bike parking isn't something that costs very much. Uh, 10 spaces feels like maybe it's 10 spaces on one corner. If we had more spaces kind of spread throughout with you know, that in mind, could be the employees biking to work.

Um, I'll add my two cents and echo what uh Council Morgan and Council McDonald also said about the staff recommendations. We definitely support those. Um our staff knows kind of what we're looking for when we're looking at these applications and so taking those recommendations seriously is going to be your best friend. Um and uh I would say uh I saw the crosswalk. Um Please work with staff on the design of the crosswalk. Um as somebody with OCD, I was looking at that like, "Nope, I'm not walking across that." So just work with staff, but everything else was appreciated.

[0:25:36]

Thank you. And to uh your point um as far as the solar panels go, um the applicant we did discuss that um and the applicant may be able to shed some additional light on that one for you.

Any questions from our alert members? All right. If not,

Thank you.

thank you so much.

All right, and then I believe the

Mhm. At this time, we'll turn it over to the applicant.

Good evening, Mayor and members of Council. I'm Mark Frederick with Parker Poe, Adams and Bernstein. I'm here on behalf of the applicant, Beacon Partners. I'm joined tonight by Josh McCartel and Gray Harrell with Beacon Partners. Um and as Dylan mentioned, uh this this request does um this request would allow the future the next phase of the Knightdale Gateway Business Park. Uh I'll I'll hand it over to Josh shortly, but first I'd like to thank all these town staff members who have worked on this project. Um they have made this an efficient and collaborative process, which is greatly appreciated given the uh constraints and demands of a project like this. Beacon Partners' continued investment into this project is a reflection of the strength of the Knightdale employment market. This particular area continues to be attractive to employers given its proximity to major transportation corridors. This project, this next phase of the project, aims to continue the momentum of growth or the the continued momentum of growth and do so in a high-quality class A campus setting. So, with that, I'll hand it over to Josh with Beacon Partners. Awesome.

Good evening, Mayor, Council members, clerk. Uh appreciate the time that you all have spent um thinking through our project and

[0:27:37]

listening to our comments here today. Dylan, very thorough presentation. After reading the report, I knew it would be, so I think you're going to address a lot of things that I have in here, um but happy to discuss the comments that that you all just had. Um obviously, this is Knightdale Gateway phase three. Uh phase one uh is one of our We don't have favorites, so one of our our proudest projects that we've done in the market. We are local, community-driven uh investors and developers, so office in Charlotte, office in Raleigh. Our whole team has worked on this project to date lives in the triangle. Uh I drove past this twice today, uh not intentional, um but every time hap- happy to look at it. I'll say the design and architecture, we're so glad that it was received so well or uh by all of y'all with the 2024 community award. Uh Hopefully, the the community members think the same thing when they drive by it. I'd say this was uh a moment for us to elevate our design standards that we've had at Beacon for the last five or 10 years. Um and ever since we did it at Knightdale Gateway, we've done it in all of our parks, and we've challenged our architects to beat it. They haven't beat it. We've stuck with this design, um tried to modify it so it's not copying it, but we stick with this design. So, we're very happy that this new phase, it's, you know, carbon copy, print and repeat, um, 100,000 sq ft, so a smaller footprint, but really targeted to do the same thing that the first phase did. Make the community happy to drive by it while they're looking at it, but also the thesis was the better you make your buildings, also functionally, but aesthetically, you would attract better tenants. And I think that was proven out here. Um, the lease up was really quick, really successful. Um, Siemens was kind of the marquee lease that came, um, to market. I know it was really great. I know, I think most council members were there when we did kind of the ribbon cutting, and most of staff, um, which was great to kind of get to see that. But they've invested a a ton of money into that space above and beyond what we have. Um, they're very proud of

[0:29:38]

the facility, love being in Knightdale. Their HQ's in Wendell, um, but their EV charging and research and development hub was moved here. They wish they took more space. I think if this building was here today, I'm sure that their name would be up on the side of it. Um, so we we do aim to attract those similar sort of jobs, um, and similar sort of tenants to come to Knightdale. And so that's research and development, engineering, advanced manufacturing, really diverse employment hub that we've been really proud to to create. Um, Dylan did a great job walking through most of these, so uh, I'll be quick and hopefully touch on some of the points that y'all just brought up. Um, from a green infrastructure standpoint, I'm proud to add the bio-retention, native plantings, roof water cisterns. Our tree cover does exceed, um, the minimum, um, that we are supposed to have on site, um, for the river district crosswalks, totally understand the feedback of making sure we're we're collaborating and making sure that everyone is happy with how they look. Uh, it is unique, um, but I think it will be a cool feature, and we will 100% collaborate with staff and ensure uh, that it meets everyone's expectations. To Dylan's point, very happy to enhance landscaping and add hardscape at the hard corner of Farm Road and Laverty Lake just to continue to create that sense of arrival and sense of place that we have at Night Tail Gateway so far. Got two public gathering spaces planned here. I know Siemens and everyone in the first phase uses what's out there to date. It's a beautiful spot to get outside and just enjoy the environment. From a transit standpoint, happy to commit to building the bus stop pad and and full crosswalk with this first phase. Obviously, subject to approval with NCDOT and coordination and happy to commit to the fee in lieu for town on the on the wayfinding to allow y'all to kind of control the process of implementing that on y'all's time and and y'all's design. I'll answer the solar question too while

[0:31:38]

we're here. Um, yeah, we've built 10 plus million square feet across North Carolina. I think as of the last 3 years we have, you know, started to have conversations with more and more tenants and you think of Siemens the conversation, you know, came up and it's like, "Hey, do you guys want to do this?" You'd think if anyone Siemens kind of tenant would want to do it. The issue with industrial that hasn't necessarily been solved to date is there tenants are in full control of maintenance costs of the building once they occupy it and the penetrations into the roof membrane tenants just aren't comfortable with to date and the savings that they they garner from the solar has not offset it to date. So, there's a lot of hesitation even from the very kind of forward-thinking tenants to install it on the roof. So, we have we haven't done it on any of our projects. Um, we just had one in Apex where a group thought they were going to do it, did a bunch of research and then hadn't done it. So, Um, we are going to put increased um uh conduit just to support future EV stalls. So, if a tenant does want more, um we will have that in place to easily be able to do that. Um but have yet to be able to, you know, find a home for solar to date, although I think in theory that's a great idea. Um, this is just highlighting where some of those features I just talked about are um from the retaining wall standpoint, obviously we are kind of forced to do that just because of how challenging the to- topography is. I think you know, obviously in tandem with the 50-ft buffer, which does have, fairly dense foliage in place today, it's great that we we don't want to touch it, don't have to touch it, won't touch it. Um but the retaining walls do do pair with that and Dylan and staff, great recommendations, um but we are planning to tier the retaining walls, so it's not a monotonous flat wall, allows us to implement plantings on the top and on the bottom, so it will look good and it will sit kind of behind um all of the tree and existing foliage, which which

[0:33:40]

is rather dense. Um this is what's a little This is on the front corner, so if you're just starting in Charbonneau Circle, looking kind of northwest. Um and then this is from the back and the back of Charbonneau Circle looking down. But as you can see, the the building is um is not very visible at all. That's everything I prepared, happy to answer um any other questions, comments that anyone may have, when appropriate.

Thank you. And good.

Just a follow-up question on the solar.

Yeah.

Um So, you know, we kind of kind of dealt with that same hesitation on the residential side, where you know, builder doesn't want to commit to I don't want to install solar panels on everybody's house. Not everybody wants solar panels. Got you. Is there, you know, you talked about additional conduit for the EVs, is there something similar that would make it easier should a tenant want to do that rooftop solar? Because I mean, it's a huge canvas for it.

Yeah, I I am not familiar with it. I don't know if if you are, Greg. We're happy to do some research around that. Um but I'm not familiar with that. We've We've not done that to date, but we're happy to look into it.

You could be the first.

So, as far as tenants, it I you know, really love the tenants that you have at the other building. Do you anticipate um you know, several or you know, just one or two? You know, one thing we sort of talk about here is is also providing space for sort of startups and that type of thing, but uh is it is it going to be more sort of who comes in first and can can fill that space and it works for them or sort of what what's your thought about the actual tenants?

Yeah, I think this is a a a theme that we do on all of the buildings that we build. Um pride ourselves on flexibility, uh which you should do. Everyone should do that. Um so, the reason the building looks more elevated is cuz we have, you know, storefronts in the middle of the

[0:35:40]

buildings purposefully. So, yes, if a great single tenant came in immediately when they found out we were building this and wanted the full building, we would absolutely consider that. Um but the building is set up in a way that it can receive, you know, four or five smaller tenants as well. 10,000 to 20,000 square foot tenants um with storefronts set up for them. And we have knockouts in the front of the building that you can, you know, turn them into more storefronts. So, it's highly flexible. I wish I could tell you which how it would be leased up, but we don't have that answer. Um but I you know, it could go either way, but it is set up to do a wide range of things.

Mhm. Any from LURB? Any applicant? Thank you so much for sharing.

I appreciate it. Have a great night.

Uh we'll now open the floor. This is a public hearing item, so we will open the floor for public comment. And I will bring it back to council. Any last questions or comments? All right. Or motion to close.

Uh with nothing else being said, I will make a motion to close the joint public hearing and refer ZMA-4-26 to the Land Use Review Board for recommendation and advisory statement.

Second.

All in favor?

I.

Any opposed? Majority approves. Motion carries. We'll move to ZMA-2-26, legislative and quarterly updates.

Good evening, Mayor, uh Town Council, members of the Land Use Review Board. Uh tonight I have for you a text amendment.

[0:37:41]

Uh this is wrong buttons. I apologize. Um this is uh ZTA 226. Uh this mainly came about because there were three uh major bills that were passed recently, had quite an impact on land development standards. Um so, while this is a staff-initiated text amendment, it is something that um kind of is necessary to become compliant with uh recent changes to the uh general statutes. So, this uh these topics and uh different parts of the text amendment were uh discussed at the September work session. Tonight, we're at the joint public hearing, and all required notifications have been met. And uh then this will be, uh uh, hopefully referred to the November LURB meeting, and then I'm sorry. I don't know how to use this clicker. Um, and then, uh, it will come back to the town council for final decision at your November meeting. So, as you can see here, uh, this is quite a broad, uh, text amendment. It affects a lot of chapters, almost half of them, um, in our UDO. Um, and so, my presentation tonight is, uh, it goes through each chapter, uh, starting with the with chapter one. So, I've kind of organized it that way. So, first up is chapter one, which is our purpose and applicability chapter. Um, so, the first item, uh, has to do with development agreements. This will just align the UDO with the wording that is in, uh, 160D. Um, so, anytime the ordinance currently references utility allocation agreements, also known as UAAs, we would just change, uh, swap out that wording for development agreement. It doesn't change any type of process or requirements of these development development agreements. It's just simply swapping out wording. Um, just so you have a little bit of background, uh, in previous years, the general statute used to say that development agreements had to be a certain size, and so, the town had, um, kind of introduced this idea of utility allocation agreements so they

[0:39:41]

could be applicable to smaller developments. The general statute no longer has that size requirement, so, there's really no reason to differentiate between the two. So, we'll just say call them all development agreements. Also in chapter one is, uh, vested rights. So, Senate Bill 445, uh, was passed recently. Um, this will require changes to both chapter one and chapter 12, which are administrative standards. And, um, so, our current language says that a site-specific plan has a vesting period, an initial vesting period of two years. And then, if someone needs to ask for an extension from the town council, the maximum extension is currently listed at 5 years. However, because of Senate Bill 445, the initial period has increased to 5 years, and the extension time limit has increased to or the maximum extension time limit has increased to 8 years. I do want to point out that in a development agreement, it can assign or specify a longer period. This is just the initial vesting period and also the extension period. That brings us next to chapter 5. This is our no-impact home-based occupations. This would align the UDO language with HB 372, which is in effect now. I believe it went into effect in July of this year. And it states that a municipality cannot prohibit no-impact home-based businesses, nor can we require a permit for them to operate. So, in addition to changing some of the language in chapter 5, which are use-specific standards, we also have to make changes to chapter 12, which is where the permit requirement comes in. So, in order to implement these changes, it's important to understand what a no-impact home-based occupation is. So, this uh HB 372 defines it as the following. Hate

[0:41:43]

to read it to you, but I think it is important to kind of understand what this what what this includes. So, the first qualification is that the total number of onsite employees and clients do not exceed the city's occupancy limit for the residential property, and then all business activities are limited to the sale of lawful goods and services. Does not generate on-street parking or a substantial increase in traffic through the residential area. The activities incur occur inside or in the yard of the residential dwelling. The activities and goods are not visible from the street. And lastly, they do not store merchandise, equipment, products, supplies, or materials outside the premises. So, currently, um our UDO does require a zoning compliance permit for home occupations. So, we would have to remove that requirement. And then some of the additional um use specific standards that are in chapter five would have to be revised um just to comply with the language of the general statutes. Um I do want to point out that the town is still able to regulate that the home occupation use is still compatible to the surrounding residential use. It's also secondary to the residential use of the property and complies with state and federal laws. So, can't have illegal activities going on um and you can we can still ensure that public safety issues are being addressed. And one more item is that um this does not the state statute does not override any type of private restrictions or covenants that are in place. So, if an HOA if a home uh is in a HOA neighborhood and they do not allow home-based businesses, they are allowed to enforce and implement that. It's just something that the town can no longer um prohibit or require permit for. Next up is chapter six, which are building type standards. So, this particular change has to do with glazing and transparency requirements um under

[0:43:44]

SB 445, which is in effect now. Um and this specifically applies to ground floor and non-storefront facades of commercial and mixed-use buildings. So, this uh new legislation does introduce some terminology that's not currently in our UDO. So, I did want to review that and uh implementing these definitions will be part of the text amendment. So, just in case um anyone is not familiar with glazing, it is kind of a broad category, but it it includes things like windows, doors, storefront glass, um any type of transparency requirements, faux windows, or some type of similar um architectural treatment. Um and then for the ground floor facade area, that's specifically designed as um an exterior wall of the building from grade to 10 ft above grade. Um that are not reasonably treated as a storefront facade. And then the legislation also includes uh these non-storefront uses um and provides some specific examples of what those could be included in, but things like medical exam rooms where you wouldn't want windows to begin with, um any type of religious assembly or sanctuary space. Um so, there are some uh differentiating of different facade areas, and that is where um when we um are updating the UDO, uh we'll have to incorporate those different facade types. So, right now our current language says that there is a minimum 40% transparency requirement on primary facades and also on internal facades that have a pedestrian entrance. And this applies to the mixed-use commercial um building types. But, due to these changes, we would uh include these different categories, the ground floor facade, the non-storefront, the storefront, and we would have to decrease the minimum requirement on the

[0:45:44]

ground floor to 35% and decrease the minimum requirement on non-storefront from 40 to 20%. That brings us to chapter seven, which is our development standards. Uh this change has to do with parking minimums. Um HB 162 goes into effect January 1st of 2027. So, we wanted to do this text amendment now and get ahead of it before it goes into effect. Um but it states that a municipality can no longer require off-street parking lot to meet a minimum number of parking spaces per development or structure regardless of the occupancy or the use. So, this is a pretty big change in our ordinance. Um and also this change applies to existing minimum parking requirements. So, anything that is already on the ground, if a new use came in, we no longer uh need to calculate minimum parking. Um and then also it is applicable to any new proposals moving forward. So, site plans that are coming in for review uh would not be uh required to provide a minimum amount of parking spaces. Um so, what we can still regulate though is on-street parking. Uh many of our street cross-sections have on-street parking requirements, so we can still have those. We can also still regulate parking lot design, so the location of the parking lot behind a building's front facade, uh the landscaping, the screening, any type of access, cross-access in between parking lots, drive-thru stacking, things like that we can still regulate. It's just can't say you have to have a minimum number of spaces. Um so, in order to change our ordinance to be in compliance with this new uh statute, we are proposing to remove the minimum requirements and then reduce the table to show broad use categories rather than individual use.

[0:47:45]

My next slide will have an example of this. And then we'll capture bike parking in the table as well. And then since uh there are other chapters of the UDO and other sections that talk about parking. So, um the cluster box mailbox units in neighborhoods, uh ADUs, accessory dwelling units, cross access, there are different various sections that also will need to be adjusted uh because of these uh changes to minimum parking. So, right now um on the screen that is just a clip from our current ordinance. You'll see highlighted in red is a minimum column and you'll see that, for example, the residential category um is broken down into single family, duplex, and it assigns a different uh requirement for each different type of residential use. Um what we're proposing to do is remove the minimum and then under the maximum or um and add the bike parking that you can see on the right-hand side of the screen. And um you'll see the residential is just one category instead of listing each different type of residential use. So, kind of condensing the table, broad categories rather than individual uses. That brings us to chapter 12, which is administrative standards. Um this affects our board of adjustment terms. Uh right now the 160-D-302 has a different requirement for minimum term limits than what is uh listed in our UDO. Currently, we say 2-year terms with a limit of three consecutive terms in a row. But, in order to be in compliance with 160-D, we'll change the term length to 3 years and then decrease the consecutive years to two terms. Um but, it all comes out to 6 years that people can serve without needing to take a break from the board before being reappointed. Uh also in chapter 12 is the resubmittal waiting period. Um so, this specifically

[0:49:47]

applies to zoning map amendments, text amendments, development applications, or request for development approvals, it is not applicable to any quasi-judicial process or permits, especially use permits, variances, uh still can have a um requirement for resubmittal. Um but right now our ordinance does say that uh a similar application cannot be filed for a period of 1 year after denial. So, in order to comply, we'll just remove that language and uh there will no longer be any type of cooling off or resubmittal period required. Last chapter in the UDO is chapter 15, which is our definitions. Um so, we are proposing to um change a couple of specific definitions. First up is manufactured housing. So, Senate Bill 445 um manufacture how change the definition of manufactured housing in order to match the definition that was um included in the recently adopted 21st Century Road to Housing Act by the federal government. So, in order to just match federal definitions, state definitions, we're proposing just to swap out our um our definition in our UDO with what is provided. It does not change any type of requirements or um uh where manufactured housing is permitted or not permitted. It's just how it's defined. Uh the second definition is public safety facilities. Um right now, public safety facilities are permitted by right in almost every single zoning district except three of them. Um and the definition uh includes uh fire prevention, sheriff substations and headquarters, and also includes incarceration facilities. So, the focus here would be better aligning compatible land uses

[0:51:48]

um, in a wide range of zoning districts. Um, and so we feel that jails or incarceration facilities are completely different scope, um, and scale than the other uses uh that are listed. So, our proposal would be to just remove, um, those last three words from the definition. Um, and then our last definition to be edited is drive-thru service. Um, right now it uh defines what a drive-thru service is, but it specifically says that automated teller machines or ATMs are not included in this definition. Um, our proposed changes to actually include the ATMs in this definition. Um, as you can see here, drive-thru services are a required conditional district in uh four or so zoning districts. Um, our previous UDO version uh listed ATMs as a separate use, but then in the 2021 version that use was removed, but still defined. So, it's created some confusion on where standalone ATMs are allowed. So, we feel that uh including rather than excluding them from the drive-thru service just gives a clearer path of um where these types of uses could be allowed. This is just an example of one in town that we kind of ran into, um, kind of realized our UDO was unclear, um, so prompted this change. So, this is our typical public hearing process. I'm happy to answer any questions that you might have before opening the public uh hearing.

Thank you for the review and bringing it to council for any questions or comments. All right. Blur? Any questions or comments? Thank you so much.

And then our recommendation tonight after holding

[0:53:49]

the public hearing and receiving any public comment would be to close the public hearing and refer it to the land use review board at their next meeting for their recommendation and advisory statement. Thank you.

Thank you. I don't believe we have anyone, but I will open the floor. This is a public hearing item, so anyone who wishes to speak on this item may come forward. All right. And if not, final comments or motion?

Okay, I'll make a motion to close the public hearing and refer ETA-2-26 to the November 9, 2026 land use review board meeting for recommendation and advisory statement.

I will second.

Third.

All in favor?

Aye.

Any opposed? Majority approves, motion carries. That is the last item on the agenda this evening. So at this time may I have a motion to adjourn?

So moved.

Second.

All in favor?

Aye.

Any opposed? Majority approves, motion carries. We stand adjourned. Thank you for joining us.

Speaking at this meeting

Town of Knightdale's own rules for public comment — check them before you rely on anything here.

Agenda items (5)

Procedural · 3Public hearing · 2
  1. 1 Welcome
    Procedural
  2. 2 Adoption of Agenda
    Procedural
    Adopted by voice vote
  3. 3.a ZMA-4-26 Knightdale Gateway Phase 3
    Beacon Partners seeks a planned unit development rezoning for a third phase of the Knightdale Gateway industrial park off Farmwell Road and Milburnie Lake Drive. Staff recommended conditions including a bus stop and shelter, extra landscaping, a wayfinding fee and River District crosswalks. Nobody from the public spoke.
    Hearing closed; referred to the Land Use Review Board
  4. 3.b ZTA-2-26 Legislative & Quarterly Updates
    A staff text amendment to match recent state laws: longer vesting for site plans, no permits for no-impact home businesses, lower facade window minimums, no parking minimums and new Board of Adjustment terms. It would also take jails out of the public safety facility definition and treat ATMs as drive-through service. Nobody from the public spoke.
    Hearing closed; referred to the November Land Use Review Board meeting
  5. 4 Adjournment
    Procedural

Agenda changes