Contracts and procurement items in Town of Garner, between 28 Aug 2025 and 28 Aug 2026
8 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
-
The council was asked to award the 2026 Street Resurfacing Project bid and authorize the town manager to sign a contract with Daniels, Inc. for $629,393.
-
An emergency repair authorization for a sewer lift pump serving the Garner Police Department and Fire Administration buildings.
-
Awarded the Bryan Road Improvements Project construction contract to Fred Smith Construction for $1,049,100, with a $242,271 budget amendment.
-
Awarded the FY2025-26 audit contract to Mauldin & Jenkins, covering the basic audit, a required federal Single Audit, and financial statement preparation.
-
Adopts a resolution setting the criteria used to determine whether a design-build delivery method is appropriate for the Meadowbrook Park Pond Area Trail project.
-
E.2 Surplus PropertyDeclares a 2004 dump truck, replaced under the town's vehicle replacement program, as surplus for disposal via Resolution (2026) 2689.Resolution Contracts and procurement
-
Award of a $395,570 construction contract to Lanier Construction Company to add 39 angled parking spaces on Main Street between Purvis and Montague Streets, with a related budget amendment.
-
E.2 Surplus PropertyResolution to dispose of two surplus vehicles -- one cycled out per the town's replacement schedule, one totaled in an accident.Consent agenda Contracts and procurement