Stormwater and flooding items in Town of Garner
4 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
-
Amends the FY27 Position Classification Plan, including moving the Stormwater Supervisor position up a pay grade.Consent agenda Stormwater and flooding
-
Adds $179,000 to continue the town's stormwater utility rate study, via ordinances (2026) 5340L and 5341D.
-
Discussion of a stormwater utility and fee structure for FY28.
-
Lynne Gregorio, on behalf of Madison Womble LLC, requests rezoning of about 0.74 acres from Residential-40 Watershed (Wake County) to conditional Residential 4.