Historic District Commission Regular Meeting
Town of Hillsborough ·
Historic District Commission
Wednesday, September 2, 2026 at 6:30 pm
Agenda document Full packet Minutes Meeting page Watch Meeting recap
What was decided
- Approved 6.ACOA: 113 W. King St. – Mural on Alley Wall and Entrance Sign Approved as submitted, 4-0
- Approved 6.BCOA: 324 W. Margaret Ln. – Replace Wood Windows with Fiberglass Approved with conditions, 3-1 (wood, white, same-size windows on the street-facing side)
- Approved 6.CCOA: 200 S. Cameron St. – Deconstruction and Rebuild of Link Building for New Sheriff's Office Approved as submitted, 4-0
Read from the agenda's recorded outcomes. Where the board published minutes, those are the record — this is a pointer to them.
What's on this agenda
The Hillsborough Historic District Commission will review three Certificate of Appropriateness (COA) applications for work inside the historic district. The smaller requests are a mural on a previously painted alley wall and a new entrance sign at 113 W. King St., and a swap of wood windows for fiberglass windows at 324 W. Margaret Ln. The larger item is a request to extensively deconstruct the existing Link Building at 200 S. Cameron St. down to its structure and rebuild a new sheriff's office on the same footprint.
The rest of the agenda is routine: approving minutes and written decisions from the August 5 meeting and a general updates item before adjournment.
Summarized from the published agenda. Read the agenda itself before acting on it.
Meeting recap
What happened, drawn from the records published after the meeting. Minutes
The commission approved all three applications, including the rebuild of the Link Building at 200 S. Cameron St. as the new headquarters for the Orange County Sheriff's Office. Architects from O'Brien Atkins Associates said the 1992 building has been vacant since 2019 because of mold, and the whole exterior must be re-bricked. Two South Cameron Street neighbors spoke: Michael Reeves raised tree removal, noise and lighting, and Rich Shaw asked for solar panels. The architects said lights would be dimmed at night and pointed down.
The window replacement at 324 W. Margaret Lane split the board 3-1. Owner Wendy Marion said the 1950s windows were broken and termite-damaged. Members found the windows less character-defining than the rafter tails and German siding, and approved replacement on condition that the street-facing windows be wood, white and the same size. Chair Will Senner voted no; he said the windows do contribute to the house's character. A mural and a backlit 2-by-2-foot sign at 113 W. King St. passed 4-0.
How the votes went
Four members voted; Sara Riek was absent. 113 W. King St. mural and sign: approved as submitted, 4-0. 324 W. Margaret Lane windows: approved with conditions, 3-1, Senner voting no on both the findings and the approval. 200 S. Cameron St. Link Building: approved as submitted, 4-0. The Aug. 5 minutes (with a correction) and written decisions were approved 4-0.
From the published minutes.
Speaking at this meeting
Town of Hillsborough's own rules for public comment — check them before you rely on anything here.
Agenda items (3)
-
6.A COA: 113 W. King St. – Mural on Alley Wall and Entrance SignApplicant requests a Certificate of Appropriateness to install a mural on a previously painted alley wall and a sign at the front entrance.Approved as submitted, 4-0
- 113 W King St · no matching parcel on file
- Pin 9874064264 · no matching parcel on file
-
6.B COA: 324 W. Margaret Ln. – Replace Wood Windows with FiberglassPublic hearing Historic preservationApplicant requests a Certificate of Appropriateness to replace existing wood windows with fiberglass windows.Approved with conditions, 3-1 (wood, white, same-size windows on the street-facing side)
- 324 W Margaret Ln · no matching parcel on file
- Pin 9864861048 · Endeavorman LLC · assessed $226,400
-
6.C COA: 200 S. Cameron St. – Deconstruction and Rebuild of Link Building for New Sheriff's OfficeApplicant requests a Certificate of Appropriateness for extensive deconstruction of the existing Link Building down to its structure and construction of a new sheriff's office using the existing footprint.Approved as submitted, 4-0
- 200 S Cameron St · no matching parcel on file
- Pin 9874153612 · Orange County · assessed $3,808,100
Agenda changes
What moved between published versions of this agenda. Item numbers shift constantly as things are inserted, so only genuine additions and removals are listed.
-
21 days ago
- Added: 6.A COA: 113 W. King St. – Mural on Alley Wall and Entrance Sign
- Added: 6.B COA: 324 W. Margaret Ln. – Replace Wood Windows with Fiberglass
- Added: 6.C COA: 200 S. Cameron St. – Deconstruction and Rebuild of Link Building for New Sheriff's Office
Other recent meetings of this board
-
Wed, Nov 46:30 pm
-
Wed, Aug 56:30 pm
-
Wed, Jun 246:30 pm
-
Wed, May 66:30 pm
-
Wed, Mar 46:30 pm