Town Council
Town of Morrisville ·
Town Council
Tuesday, October 27, 2026 at 6:00 pm
Agenda document Full packet Watch Meeting recap
What was decided
- Approved 6.aApproval of September Council Minutes Approved on consent, 7-0
- Approved 6.bFall Advisory Committee Appointments Approved on consent, 7-0
- Approved 6.cPlat Review Officer Appointments Approved on consent, 7-0
- Continued 13.bFinance & Personnel Policy Review Postponed to January
Another 3 items passed on the consent agenda, which is a single motion covering routine business. See the list.
Read from the agenda's recorded outcomes. Where the board published minutes, those are the record — this is a pointer to them.
What's on this agenda
Morrisville's council takes up a $4 million construction contract to rebuild the Church Street Park cricket field, $1 million over the project's budget. Blum Construction would add an underdrain so the field stops flooding and expand it from four pitches to six, aiming at the summer 2027 season. A $2 million Wake County hotel and visitors tax grant covers part of the work; the extra $1 million would come from the Parks Capital Reserve Fund.
The council put off this decision on October 13 and asked for more information. Staff now make no recommendation. The memo lays out three choices: approve, defer a year while still meeting the grant deadline, or drop the project. A letter summarizing talks with the International Cricket Council says it wants to bring international matches to Morrisville from 2027 if the field is ready, but made no binding commitment. Also on the agenda: five advisory committee appointments, a $20 registration fee for the Stormwater Runoff 5K, the sale of a 2006 fire truck, a staff review of financial controls prompted by State Auditor findings in other Wake towns, and a closed session on a personnel matter.
Summarized from the published agenda. Read the agenda itself before acting on it.
Meeting recap
What happened, drawn from the records published after the meeting. Recording
The council approved the $4 million Church Street Park cricket field rebuild, the option staff had listed first of three. Staff told the council that International Cricket Council officials want the field ready for summer 2027 to host Olympic warm-up matches, and that American Cricket Enterprises put Major League Cricket's return in 2027 at 50/50 even with the work done. Waiting a year, staff estimated, would add about $200,000. The council also agreed by consensus that staff should start researching locker room options for the field, though members differed on whether that work should run alongside the rebuild.
In the Town Center briefing, staff said a contractor wants 11 concrete pours outside normal hours, some starting at 1 or 3 a.m., before the end of the year; members raised the noise but none objected, and staff will keep evaluating. Staff have sent back a request to close a section of Town Hall Drive for four months and asked for a shorter plan. Members backed a veterans and first responders memorial at roughly $40,000 to $50,000, likely from parks reserves. Most found a town-run co-working space for its 4,000 square feet of retail premature and asked for other options. The finance and personnel policy review moved to January, and the council added an attorney-client matter to its closed session.
How the votes went
Agenda adopted with an added attorney-client closed session, unanimous. Consent agenda (minutes, advisory committee appointments, plat review officers, 5K fee, fire truck surplus, 2027 meeting schedule) adopted 7-0. Resolution authorizing phase two of the design-build contract for the Church Street Park field reconstruction, unanimous; the parks capital project ordinance amendment, unanimous. Motion to move the governance and finance policy review to January, 7-0. Motion to enter closed session on a personnel matter and attorney-client privilege, unanimous.
Who spoke
2 members of the public spoke.
- A resident raised unsafe e-bike riding on sidewalks and through stop signs, asked what town rules apply, and urged rules on sidewalk use, speed, helmets and passengers, without a ban. 0:20:41
- A resident described being run off a sidewalk by an e-bike and asked for mandatory safety training, stronger police enforcement and parental accountability for minors riding e-bikes and e-scooters. 0:22:41
Both speakers at Morrisville Speaks asked the council to act on unsafe e-bike riding by minors. No online comments were received.
Read from the recording's automatic captions, which misrender names and numbers — "Kildaire" comes through as "kill dare". Treat a name or a figure here as a pointer to the video, not as the record. Members of the public are private residents and are not named or indexed.
Full transcript
Automatic captions from the recording, "Town Council Regular Session October 27, 2026". Runs 3 hr 34 min. These are machine transcriptions, not a court record. They misrender names and figures — "Kildaire" comes through as "kill dare", and case numbers arrive as noise. Each timestamp opens the video at that moment, which is how a passage here gets checked against what was said.
Read the transcript (91 passages)
October 2. There it is. Good evening. I call this October 27th, 2026 meeting of the Morrisville Council to order. We [clears throat] ask those in attendance tonight to please silence your cell phones. Make sure mine is Yep. Mine's silent. Thank you to those here in person with us tonight, those watching via live stream, and those who are watching the recording of this meeting. Our town mission statement, which guides our decisions tonight and into the future, is connecting our diverse community to an enhanced quality of life through innovative programs and services. Detective Cody Lee is our sergeant-at-arms for this evening's meeting. We thank you for your attendance, sir. This evening, I will be leading our invocation. As we begin tonight's meeting, let us take a moment to reflect on the responsibility and opportunity that come with serving our community. Communities are rarely shaped by a single decision or a single moment. They are built through thousands of choices, acts of sacrifice, and commitments made day after day. The lesson found is that small actions consistently repeated create extraordinary results over time. In local government, that means every conversation, every vote, every investment, and every effort to serve residents contributes to the future of Morrisville. Progress is not always dramatic. More often, it comes from steady improvement, strong relationships, and a shared commitment to making things a little better each day. Tonight, let us remember the importance of focusing on what matters most. Listening to our residents, measuring our progress, honesty, celebrating successes, and learning from challenges. Let us continue building a culture of collaboration, accountability, and continuous improvement. [snorts] My nose is running a little bit. I had some spicy food earlier. We also celebrate the moments that bring our community together. We are grateful for the success of this year's the Wallally celebration, which showcased the diversity, spirit, and unity that
make Morrisville such a special place. Events like these remind us that our differences are a source of strength and that community is built through connection and shared experiences. As we look ahead to Boo Bash this Thursday at Morrisville Community Park from 6:00 till 8:00 p.m., we look forward to another opportunity for families, neighbors, and friends to gather, create memories, and strengthen the bonds that unite us all. As Morrisville continues to earn recognition for excellence in governance and civic engagement, may we remain focused not only on any single achievement, but on the habits, relationships, and values that make those achievements possible. May our discussions tonight be thoughtful, our decisions forward-looking, and our service worthy of the trust placed in us by the people of Morrisville. At this time, all who are able, please stand as we recite the pledge of allegiance. To the flag of the United States of America and to the republic for which it stands. One nation under God, indivisible, with liy and justice for all. Before we adopt tonight's agenda, I would like to recognize our attorney at this time for a possible adjustment to the agenda. Thank you, mayor. Um, a matter has come up in the last 24 hours or so that makes me want to confer with the council in close session and so I would appreciate uh you adding an attorney client uh confidential close session matter to the end of the agenda.
Okay. Thank you very much. Town council policy is to review and ensure there are no conflicts of interest or appearance of conflict of interest with any items on the agenda. Does anyone have anything they want to share at this time?
Okay, seeing none, is there a motion and second to adopt this evening's regular agenda with the addition of that second
closed session to discuss attorney climate privilege.
I'll make that motion.
I'll second.
Motion from Mayor Pat, a second from council member Johnson. All those in favor, please say I.
I. Any opposed? Hearing none, that carries unanimously. Have a close additional close session in there. Uh there are four items on this evening's consent agenda. Approval of September council minutes, fall advisory committee appointments, plat review officer appointments, stormwater runoff 5K fee schedule amendment, resolution authorizing the surplus of a 20,06 KME predator fire truck, and resolution adopting the 2027 town council meeting schedule. Would any member of council wish to push any of these items for discuss pull any of these items for discussion? Okay. Is there a motion and a second to adopt this evening's consent agenda, please?
I'll make that motion.
Second. [clears throat] I have a motion from Mayor Petraati, a second council member Kesling. All those in favor, please say I. I. Any opposed? Hearing none, that also carries unanimously. Unanimously 70. Next on the agenda is Morrisville speaks which is our public comment. Do we have any signed up this evening? Town clerk Bley.
We have two individuals signed up this evening.
Okay. Excellent. Um those who have signed up to speak, please approach the microphone after Miss Bertling called your name and begin by stating your name and your residential address and direct your comments to the council. Each speaker will be allotted three minutes to ensure everyone has a fair opportunity to share their thoughts. A timer will start after you state your name and address and a buzzer will sound when your time is up. We appreciate your cooperation in helping us manage time fairly for all participants. Uh Tunkler Bling, can you please call the first?
First is Katie Long.
Good evening, mayor and members of the town council. My name is Katie Long and I live at 131 China Court, Morrisville. I'm here tonight to raise a public safety concern regarding ebikes on Morrisfield's roads and sidewalks. I want to be clear that I'm not asking the town to ban ebikes. My concern is unsafe operation and rather our current rules, education and enforcement are keeping pace with how these ebikes are being used. I have personally seen ebike riders traveling on sidewalks in ways that cause pedestrians to step off the sidewalk to avoid them. Pedestrians should not have to move into the grass, onto private property, or closer to the roadway because of an ebike rider will not slow down or yield. I'm also concerned about young riders zipping through stop signs, disregarding traffic signs, riding without helmets, transporting passengers. When these behaviors are com combined with speed ebikes can reach, the consequences of one bad decision can be serious. A young rider entering an intersection without stopping may give a driver very little time to react. And when that rider is carrying a passenger, another young person may may also be placed at risk. Parents have a responsibility as well. If parents allow their children to operate ebikes, they should make sure their children understand traffic laws, use appropriate safety equipment, and understand the responsibility that comes with riding around vehicles and pedestrians. I also ask the town to consider what responsibility parents should have when minors repeatedly operate ebikes recklessly or unsafeely. I also would like the town to clarify what ordinances, if any, currently apply specifically to ebikes in Morrisville. If regulations already exist, are riders and parents aware of them and are they being adequately enforced? If Morrisville does not have specific ebike regulations, I ask the council to consider whether whether they are now
needed. I respectfully ask the council to consider clear rules regarding sidewalk use, appropriate speeds, [clears throat] helmets, and passenger safety, education for young riders and parents, and enforcement of unsafe riding. Again, this is not about banning ebikes. It is about responsibility and public safety. Pedestrians should not be run off sidewalks. Stop signs should not be ignored. Traffic laws should not be optional. And parents should understand the responsibility that comes with allowing a child to operate an ebike. We should address this now rather than waiting until a child, pedestrian, passenger, or motorist is seriously injured. Thank you for your time and consideration.
Next is Robin Wilson. Mayor, council members, and neighbors, good evening. My name is Robin Wilson, and I live in the Breen Ridge community at 305 Mannington Drive. I'm here tonight because our town is facing a growing and dangerous problem, the same that Katie mentioned, the rapid rise of unsafe ebike and ecooter use by minors. This is no longer a nuisance. It's become a safety issue. Over the past year, reckless riding has escalated to the level that puts children, pedestrians, and drivers and families at risk. These are not rare occurrences. They mirror what residents are posting constantly on our neighborhood Facebook page. I personally, myself, have been run off the sidewalk by an ebike while walking. Kids regularly fly down Mannington Drive at extremely high speeds, two per bike sometimes. In the courtyard behind my house, children often performed high-speed stunts without helmets. And just recently, five ebikes blew through a stop sign, nearly causing a collision, and then laughed as they sped by. These incidents are happening in broad daylight in our neighborhood. And the data shows this is part of a much larger national emergency. According to the US Consumer
Product Safety Commission, from 2017 to 2024, there were 535 ER visits related to ebikes and e- scooters and 517 reported deaths. Experts agree this is only a fraction of what's actually happening because most incidents go unreported. [clears throat] We are in a child safety crisis. Pediatric ERS nationwide are seeing a surge of injuries involving minors, kids 16 and under, riding 20 to 28 miles per hour without helmets, without training, and without any understanding of traffic laws. Here in North Carolina, Wake Med has treated 600 ecooter related injuries since 2021. According to NC Health, law enforcement is clear. These injuries stem from high-speed devices being ridden recklessly by minors who disregard traffic laws and do not wear helmets. So what is being done? Morsville and Carrie and Apex police departments have begun citing underage and uns underage riders and unsafe behavior and our towns have implemented greenway safety management policies. Is this enough to protect us against a trag tragedy? State law already gives municipalities the authority to regulate ebike and e- scooter use on sidewalks, multi-purpose paths, greenways, and parks. Other communities are acting decisively. Garner and Wake Forest have stopped have capped ebike speeds at 10 miles per hour. Several NC jurisdictions have banned sidewalk usage entirely and Pender County has banned ebikes from parks, greenways, and athletics fields. We have strong models and a responsibility to act before someone gets seriously hurt. So what is the solution? I respectfully urge the council to consider mandatory safety training for all ebike and escooter users, especially minors. Stronger monitoring and enforcement by Morrisville police and accountability for parents. In Orange County, California, 12 parents were just criminally charged with reck reckless endangerment. We have a choice to be
proactive rather than reactive. Thank you.
That is the end of our signed up speakers and there are no online comments.
Just let me know everything I need. That's perfect. Thank you to everyone who has spoken. If anyone in the audience who did not sign up and would like to address the council, please come forward to the microphone stand at this time. Okay, seeing none, thank you very much. As a reminder, we encourage the submission of written comments as they offer another valuable way for community members to share their feedback. To submit a written comment, please email public input at morrisvillec.gov. We have one administrative report this evening. This report is for information only unless there are specific questions. And I would like to um Does any member have any questions about this report at this time? I'd like to recognize Morati. U Thank you, mayor. I would like to pull the uh council expenditures on training from the administrative reports.
Okay. Miss Bling, you are the uh administrator of this item at this time. Um do you have any questions for her?
Hi, Kayla. Um I don't know if we can Oh, I see it's already there. Thank you. Um, I just want I just think that for transparency, especially in this time of increased scrutiny of council expenditures, that we should not just leave this on administrative reports. I think that we should um that we should look at it, show it to the public, and if anyone has any comments on it, um I think we should make them.
Thank you. I'll go through the report now. Thank you. So, rule 36, which was adopted last year, ensures transparency and equity equity in the distribution of
council expenditures, particularly looking at training and travel spending by council, and we also track apparel and other supplies. Um, so this is available on our agenda tonight for the public. We also began posting these on our website, um, so the public's able to see this at any time. Um this is a snapshot of how much the council members have spent individually this fiscal year. So that's from July 1 of 2026. Um as you can see we have a total spend by council member oops a total spend by council member uh total apparel and then total training. And you might see a difference between these total funds um because in that rule 36 it outlined some things that would not count. Um so a good example for Mayor Collie is most of the um North Carolina Mayor's Association events those do not count towards his individual training because he's going um on behalf of council for the mayor's association. Um, and then on the second page, we have a detailed breakdown of every transaction for council under this rule. And that includes all things that would be counted towards this full total. So, I'm happy to answer any questions and I can also show where the public can find this on the website.
Um, would you mind adding the link to this report on the website into the into this report so that it's
Yeah, just so that it's easy to find that. Okay,
thank you. We appreciate the work that goes into keeping all this transparent and for everybody to see. Seeing no other questions, we'll move on. We're at number 10, action items. We have one action item tonight. We now invite Brandon Zuda, town manager, and Mark Spanoli, town engineer, to the podium.
Good evening, Mayor and Council. Uh, so we're here tonight following up on a discussion that started at the uh, prior council meeting in regards to uh, improvements that were scheduled to be made at Church Street Park. Uh for the audience and for those at home, [clears throat] this is a five was intended to be a $5 million project to do improvements uh to bring the Cricut facility at Church Street Park up to international play standards. That included approximately $2 million for lighting upgrades that was completed earlier this spring and those are functional now. The second component of that was to be a $3 million project to improve the drainage on the field and to also add two pitches to expand from four to six pitches on the field. Uh so as we went through this process, um we put this out, we had an initial cost estimate of $3 million for this work. Uh when it actually went out for bid, uh the bid from the qualified bidder came back at approximately $4 million. Well, actually higher than that, but Mark and his staff have done some negotiation to bring it down to $4 million. So, we shared that with you at the last meeting explained how that occurred and and uh again, we've since that time and prior to that had had conversations and when we talked to other Cricut professionals, they all agreed that the group that's involved here, which is LNT that actually does the work, is the people that you want doing this kind of work. They've done cricket fields across the country. Um, and we've talked to three, four, five different entities that all speak highly of them and indicate that, you know, they're they're very informed, they're very knowledgeable, and they do it well. So, that left us with a uh a revised price tag of $4 million. uh staff shared with you that the additional $1 million could be funded from the parks reserve and that we could tell you that it doesn't impact a project today, but that it certainly could impact by not having that million dollars available in the future for other projects. Um particularly in the context of what we
might see coming out of the parks and recck master plan and also uh the capital improvement plan that you're having discussions with staff on right now. We're scheduled to come back I think uh on November 24th to to continue that conversation. So again this is the highlights of uh the information I just shared with you. Again the the project includes the improves the drainage system. There really is not a formal drainage system there. Now the challenge we have with that is that if it rains we could lose days instead of hours while the field drains and dries out. And that's prohibitive not only from general use of the field, but it's also been prohibited towards uh bringing back major league cricket and some of the other larger scale cricket events uh because if they're here for a three or four day tournament and we get a good rain, they could lose the majority of that time and not be able to complete their tournament. So that's where this all initiated from. Um again, at the the last meeting, we did talk about both parks master plan and the capital projects. Uh we had some costbenefit analysis discussion. Uh we talked again about the agreement terms with American Cricut Enterprises or ACE. Uh we talked about the project cost and what it would be now, how it might change if it was deferred for a year. Um as a reminder, we do have a $2 million grant from the Wake County Hospitality Tax Grant uh that was awarded to us. That's about well, it's exactly 40% of the project. Uh, and so we we will not hinder that by waiting a year if you choose to. Um, but if you were to choose not to complete this project, we would have to go back to the county and I'll share some information with you on that in a few minutes. And then we talked briefly about sponsorship potential. Uh, and the short answer there right now was that we have some folks that our consultant is talking to, but no one so far has expressed specific interest in sponsoring the park itself. uh they're more interested in partnering with us on a variety of items and we'll again have
that coming to you um shortly in a close session. Just a reminder on the ACE agreement again it gives them exclusive weekends and priority weekdays uh rent free as a part of our agreement and they have 10 weekends that they can reserve uh as an example they use three in this most recent season. Those were all for minor league cricket. Uh this does to some extent limit some of our ability to host other cricket events um as we wait for them to get scheduled uh and talk with them about that. Uh the agreement the minimum match threshold is to host 15 matches annually. In 2026 they hosted 14. Uh again they're required to submit a schedule to town staff no later than March 31st so that they can get sort of their first choice of the field and then we schedule other entities after that. Uh, ACE also has the right to select the venue trade name and naming rights purchaser that came from the original agreement. And then ACE must also agree to town the town hosting other Cricut events that might be deemed competing cricketing events as defined in our agreement as well. So, since we last spoke with you, um, we've undertaken several things to be able to bring you back some additional information. Uh, one of those was a meeting with the town attorney, Gray, uh, to again discuss the agreement that we have with ACE and to prep for a call that we were going to have with them. Uh, we did speak with ACE last Tuesday, I believe. Uh, we gave them an update on the renovation project and some of the challenges we were facing. Uh, we asked for their intent on the 2027 schedule. Uh, they did share that they are trying to schedule major league cricket and have that done in the next 30 days by the end of November. Um, again trying I don't know if that will occur or not. That would not necessarily include any scheduling for minor league that would be required to come by that March 31st deadline. Uh, they did share with us that basically there's with the field improvements being completed. Um, we still only have a 50/50 chance of getting major league cricket back in 27.
Uh, there's a stadium being constructed outside of Washington DC and Maryland. uh and that would be their preferred uh facility on the east coast if it's ready in time. If it weren't to be ready in time, we could see some matches. I believe they're also trying to finish up some renovations at the Oakland Stadium that they've acquired or leasing. Uh and there's a chance that there might be some need for matches from there. Um again, I during that call with them, I I shared some of our frustration of feeling that, you know, you need our field, you build more fields, you don't need our field, you have more teams, you need our field. and and being on that sort of roller coaster. Um, and so we shared that with them as best I could. Uh, and then the other thing I would mention is that, you know, they're very supportive of course of seeing these renovations made to the field. Um, but they're also clear that in order for them to come back uh continually in the future, they are still interested in the completion of locker rooms, a coach's space, a first aid space, those sort of amenities that we don't currently have at the facility. and those have to be brought in anytime there's a major league match. And again, that's what uh is primarily the cause for us not seeing any revenue um from this agreement is the cost of new bringing all that equipment in to host a tournament. Also, since we last met last met, excuse me, um we had a chance to speak with Farra Gorsy, who is the head of IC Americas. Uh had a very nice conversation with her last Thursday. Um she shared that IC is interested in bringing Olympic warm-up matches to Morrisville. Uh that could begin actually in 2027. Um they've already for example heard from Sri Lanka that they're interested in coming and getting some play here in country ahead of 2028. Uh you recall they also came here and did some warm-up prior to the World Cup um previously. Uh and again the and then they would certainly have matches in 2028. Uh these would be revenue generating opportunities for the town. They would be leasing out um the field
from us and then we would be working on them with how the other amenities they would have to bring in similar to major league because although these are quote unquote warm-up matches they would be fenced off ticketed big events even though they're just a warm-up event because of who the teams would be and the interest they would draw. Uh they were very clear, however, that the field would need to be ready with the renovations for summer 2027. A they'd like to host some teams in 27. And more importantly, they don't they're I think wary, which I understand, of our quote unquote new field opening in June of 28 and needing to be ready for play in August of 28. You know, there there's some breakin of the field. There's some other things that need to happen. Um, we've got lots of staff here that can speak more eloquently than I can on that if you'd like to hear any of that. Um, but again, they're also interested in longerterm partnership for hosting some caps and some matches. They're interested in community engagement and and investment uh over the longer term uh either way. So, that was our conversation with ICC Americas. Um, also spoke with Wake County staff regarding the hospitality tax grant. Um, the response I got was that we could certainly circle back to them if you elected not to move forward with the renovations and we could ask them to consider just funding 40% of the lighting, which would be $800,000 rather than the $2 million we were awarded. Certainly no guarantees that that would happen. They might just pull the the grant back. Um, the person I spoke to wasn't ultimately the decision maker on that, but more the process person. Uh, we also followed up with Superlative, who is our sponsorship consultant. As I mentioned earlier, they did confirm that they're working um on what I would define as some meaningful or significant um sponsorships, but they are not currently interested in sponsorship of just Church Street Park. Uh, and again, the ACE agreement right now is a bit of a factor in that. And then, uh, staff also reviewed
potential revenue apart from ACE use, and I'll I'll share some information with you on that as well. So right now uh the revenue projections uh that our staff in parks has put together. So this does assume um that there's no ace play. This is just if we were able to open up the facility to anyone that was interested in using it. Um there's theoretically 48 weekend use days and 75 weekday use days um that we could be used. So that would be um 25 hours a week or 615 hours. Again, what that allows for is more local leagues, more permitted events, programming, open play, um, and again, perhaps less maintenance because of the drainage being better and other things and not necessarily needing all everything that we do for a major league event, although I think Matt would tell you and his team is it's pretty close. It it it doesn't change dramatically because you're still maintaining the field. Um, but there is an opportunity there um to do that. And then the other thing I would say with this and this goes back to you know the ability to improve the field is it also increases community use. So you know first of all just by adding pitches you can play more cricket there because you don't have to rest as often. Um improving the drainage certainly allows for more opportunities for cricket play but it also makes the field more available for other things. You could be talking about flag football. You could be talking about just the folks that are there. most every morning when I drive by, they're coming to work, whether they're kicking a soccer ball or throwing things around or just walking, whatever that might be. Um, but those improvements that you're considering would certainly enhance the ability for this to serve as more of a community asset. You know, we have a lot of conversation about this being a Cricut facility that's in a public park. And so, you know, staff is certainly committed to trying to balance that with you as best we can uh going forward. But back to the revenue, um, if you assume for a minute that all those rentals were resident rentals, it would be $38,000 annually. Uh, if it was non-residents,
it would be $57,000 annually. And that's just to lease the field. You know, there would certainly be other things that would likely be charged. That would be pitch prep, use of the lights, time for staff, um, shelters, other things that would be incorporated into that. So, the revenue you see there is really just the leasing of the field. So those numbers would increase with the other things that would go with um depending on whether it's just a simple match or a tournament or what's happening there. So again a little bit of you know who is interested in this facility um from a variety of standpoints. So certainly from a cricket standpoint you know we work with ACE for major league and minor league. We also have the CDA and core those are both more local leagues. Uh we have the junior cricket league, national cricket league, national league cricket, those are two separate entities. Uh it could be used as an Olympic training hub, triangle cricket league is certainly been our longest and and strongest partner. And then of course USA cricket, USA cricket as an NC hub uh as well as IC um bringing matches as well. So there's really a wide variety of who is interested in using this field um from a cricket standpoint and that really goes from sort of the the lowest level of of youth training up to ICC major league cricket, you know, Olympic warm-up matches, things like that. But there are additional athletic opportunities. I mentioned one of them. I didn't hit the whole list. Uh flag football is certainly a possibility. You know, without the tackling that reduces the wear and tear on the field. uh developmental soccer clinics, youth cricket performance clinics, so other things that we could offer in the community from an organized standpoint. And then of course there's still unorganized activity that is going on out there all the time. Drive by there almost any time and you're going to see that field in use in some way or another. Uh again, we also have some opportunities for special events. It really does depend on what those are and what the impact on the field would be.
Uh particularly if you make this additional investment. Again, we want to balance it with community use, but if you make this investment, that's a significant investment and we want to make sure we're protecting that investment. So, balancing that against availability for community use, particularly special events. And then, of course, we could do some of our own special events there uh in the future as well, depending on how that evolves and how we use spaces such as the New Town Green when that opens and then some of our other parks. So you had asked questions about the parks and recck master plan. So just to give you a little overview of that. Um this is preliminary. This has not gone through any final approval. But this is the data you will um initially see when it's presented. Um these are the top six things that are on the park's master plan priorities as far as capital investment or planning for capital investment. Um and you will see there there's not really any other um significant construction yet on this list. So you see, you know, a feasibility study around a recreation center. We've had a number of conversations of is that a town investment in a future phase of town center or does it go somewhere else, but a rec center's been on that list going back to the old master plan for quite some time. Uh as a reminder, there is money in the five-year CIP currently to start looking at that from a design standpoint. Uh the second is organizational and funding frameworks. That's really more about how the department operates. Um how we do cost recovery, capital reserve, things like that. Um so that's really just some staff and consulting costs. Uh Markham the park out there. Again, this is uh that's more [clears throat] of a a design and try to determine what's there. As you know, we own some of those properties. We do not yet own all of those properties. Uh we're in regular contact with the family. Um, we believe that when they decide to sell that we'll be able to make an arrangement with them, but I can't tell you if that's tomorrow or if that's five years from now. So, you know, we've made good investment out there. I still think that's been wise. We own enough property
there that I think we we generally have the ability to control out of that. Uh, and we have a good relationship with the family. It's just that they're not ready to sell. So, I think we have opportunity there for probably your next significant park. Uh, Pew House has always been on the list. So that appears on there for potential renovation and how it might play into a cultural campus of sorts. Uh greenway and trail master planning and initial connections. So opportunities to expand our greenway system and really further connect western Wake County. Um you know we already do that to an extent with Kerry and there's lots of other opportunities to do that. So again that's really the planning side of it versus any construction. And then finally uh recreation center site development. If you were to reach that point, that would be the start of some construction there. Uh we'll share with you that there were 32 facilities and amenities considered as a part of this study. Uh and Cricut scored number 32 on that list for transparency. Um now again, I think there's a couple ways to look at that. One could be a lack of interest, but the other side of that could be we have a cricket field and people think it's a great field and and it is. Um, so they may not have acknowledged that as a priority because we have one and you see that with other facilities and amenities as well. Uh, the draft marks, excuse me, the draft parks master plan again is currently being reviewed. Um, that'll be presented to council at a future meeting. Um, and so the priority column really reflects the consultants opinions and does not necessarily indicate where that will end after there's feedback from parks and wreck advisory and again from of course from council. So that is the the parks and back master plan information that we have for you today. Again spoke a little bit about the hospitality tax impact. Uh we received the $2 million grant. That's a reimbursement grant. So we have not yet applied for or received any money from that. We will not do that until the project is substantially complete. Uh it does require construction contracts signed by July of next summer. Uh so
that could comply with a schedule to if you were to elect to delay a year um they would probably be working on it in advance of that. Um we saw that this time where we had to go back out a second time. So we would certainly uh be a little ahead of that to make sure that there was a contract in place if you elected to delay a year. Uh and we're okay with the agreement because it doesn't require substantial completion until July 7th of 29. So, if you delay a year, we're still well within that window and would be reimbursed upon completion. And as I mentioned, if you only do the lighting, we could go back to them and ask them to reconsider the request. So, maintenance and operations considerations. Um, a little more detail from what I alluded to earlier. Um, really the day-to-day maintenance requirements don't change significantly with the renovation. It just makes it so it'll dry out a little bit quicker. you know, there's two more pitches, but again, our staff is really, really good. Lance is here, Kevin is here. Um, in terms of maintaining that, you know, curating that, they do an excellent job with that. If you're ever out there and see that, you know, we get a lot of positive remarks on that from players and teams. Um, again, the primary savings here is the rain event recovery. Um, so the improved drainage reduces the staff time that's needed to prepare the fields because they're not having to do as much with either blowers or trying to get the field squeegeeed off or cleaned off or whatever that may look like. You know, right now rain recovery can require four to six staff and and they have to work 8 to 12 hours. I mean, that's a full day of the entire team plus uh trying to do that. Uh, again, that can be as much as $2,800 a day in staff time to make that happen. And again, if it's heavy rain, it may have to sit a day before they can realistically even attempt to dry that field off. So, before we get away from that, also want to share um got this information after the presentation was completed, and Matt, please correct me when I'm wrong. Um we looked at tarps to potentially cover this field as an alternative to necessarily having the drainage installed. Um I think the short
answer is that it's not practical for us. um we would probably have to purchase multiple tarps um because we don't have the capacity to do one big tarp like they do in Major League. You know, first of all, we wouldn't have the staff to necessarily manage it and more importantly, we don't have anywhere to store it. Um if we did try to do this, it would be a series of smaller tarps. They would probably cost over $100,000 upfront and then of course you'd have to replace those over time. Um, but it could be very very work intensive because of the number of tarps you would need and you know we can add some staff on some occasions but generally speaking it's a small team that manages this for us. So without stopping all other public works work to bring everybody out there and even then it's it's I'm not sure it would be enough people to do it in an efficient manner necessarily. So with that and with the number of tarps and the inability to store those um our our opinion staff's opinion is that the tarps are unfortunately not a practical option for us as the field is structured at least today. I get everything. Okay. Uh so again I I just need to say I'm really appreciative. There's been a lot a lot of people that helped do all this work the last two weeks to get this information together. You so appreciative. I won't read you the list, but many of them are in this room and I appreciate their continued support of this. So I I think when this all boils down, you have three options that you can consider. I think option number one is approve the resolution in the CPOA for phase 2 construction. Um and that would mean the additional $1 million investment. So you would be approving a $4 million um construction project. uh that does increase but does not guarantee the likelihood of major league play in 27. Um it does offer the opportunity for Olympic warm-up matches in 27 and 28 and with that comes some revenue. Uh it certainly enhances the long-term playability of the field including rest time and I think again
really important it allows additional community use of the field. So it this is not just a Cricut project. It is really an improve our park project. uh so that there's additional community use, additional access to that field, and it's a little better protected because you can imagine when that thing gets wet and stays wet, it's really tough to have people tromping on it and and do damage to it. So, the quicker it dries, the easier it is to protect. Uh again, it does require a million dollars commitment from parks reserves. Uh and you would be making this decision without having completed your discussion of the CIP uh or the parks master plan. So, that would be option one. Option two, uh, don't approve it now, um, but defer implementation for one year. Um, Mark has indicated that design could wrap up on that and then we would pause, uh, the project to potentially um, make a decision in the spring. Um, that could be going back out to seek, you know, other bids, although again, we don't know that that's going to change dramatically because everybody that we talked to says we have the right people that are bidding on this to do that work. Um, this would allow for you to consider the CIP and the parks master plan review as a component of your discussion and really your decision. Um, it reduces the likelihood of major league cricket play in 2027. It also eliminates the opportunity for Olympic warm-up matches in 27 and 28. Uh, and we do anticipate um, I think conservatively a cost increase of 5% or $200,000 if you wait to start this project in the fall of 27. Option three is do not approve the resolution and do not approve this project. Basically, put it on the shelf and continue to operate the field as it sits today. Uh we will certainly still continue to deal with field conditions. Um we don't enhance the playability of the field and whether that is playability for cricket or additional community use, it would stay in its current state. um does reduce the
likelihood of major league cricket play over the remainder of the last six years of that agreement. We've just completed four years of that 10-year agreement. Uh eliminates the opportunity for Olympic matches and probably any ICC matches in the future. Uh it does return a million dollars to the parks reserve. Again, this is a was intended to be a $5 million project. Um and you've got that $2 million that was going to fund a portion of it. The other million of the three would go back into the parks reserve. So, there would be some money going back. Um, but again, we'd have to return the Wake County grant funds and we would make an effort to certainly try to get the $800,000 to do the 40% towards the lighting. Happy to answer questions and uh certainly have a team behind me that will help with the questions I can't answer.
Okay, questions, comments, and discussion. We'll start with Mayor Patabody followed by Council Member Scragg and Johnson.
I don't actually know. I'm not actually sure that this has an answer, but first of course I'd like to thank the team. I know that they really went above and beyond in the preparation of this report. You know, it's only what 15 slides, but I know that tons of work goes into every slide. Um, so when the I'm trying to understand the if there's a long-term effect on the field when it gets rained on, stays wet, gets cleaned off, or gets rained on for six days in a row, and then, you know, because I I'm concerned that the condition of the field will degrade over time, that being the case, if we leave it the way it is. And then then my concern would be that it'll cost $10 million to fix it down the road. So I'd be interested in any info we have on that.
So I'm going to let public works come up and and speak to that. Again, I am not
the guy um to tell you about a maintenance of a field. Um I would tell you I don't think it's $10 million in the future, but I think you know it could be a a recovery project in the future. But I'll let the more knowledgeable folks help you with that question as best they can. And I think you're right, there may not be a perfect answer to that.
Yeah. So, we we spend time uh throughout the year maintaining the field. So, um degrading when we do get heavy rains, that's when we do come back in and do our annual uh or more than annual top dressing throughout the field and that helps replenish what's washed off um from the from the field. So, we are working towards maintaining what we have right now, but obviously improving the drainage is going to help that water um help the uh the water get through and and reduce the amount of runoff and and top dressing that we're going to have to do um more frequently.
No, that's that's really it. Um the top dressing is helping. It's it's we're adding a sand layer, but then it's still getting to the natural clay that we have. So it's kind of still just sitting in there. So initially, yes, we get some quick drainage through the sand, but then we have the sponge effect underneath and the field will continue to degrade that soil. We can only decompact so much to try to open it up, get air in there. So it is going to continue to great. I hope not up to $10 million in the future, but more than likely it will go up. Okay, I I am so torn about this because I I feel like we've already spent quite a bit of money on this that I was not anticipating spending. But the thing is that I feel like every year we delay, the price goes up and the quality of the field goes down. I know you guys are
working super hard. That's not to say that, you know, you're not doing a great job. You are, but the price goes up, the quality of the field goes down, and I just I don't know. I feel like we we just might have to bite the bullet on this one.
Thank you.
Thank you, Council Member Spogney Johnson, followed by Council Member Johnson.
Thank you. Thank you for these um thoughtful points because I think it's important that we lay out the story as clearly as we can with the knowledge that we do. Um and of course I came up with something that wasn't included in the presentation for a question. Um, we talk about the improvements of the drainage and adding more community activities and allowing for um, you know, more reliable field conditions for tournaments and so forth like that. Do we know how many canled events that we've had to have because of the condition of the field? Do we know how many events that are public like um walks or or um celebration events we've turned away because of concern about impact on the field that that's important to kind of quantify if we
Sure. I I think there's two questions there and I may ask for a little help again. Um, but in terms of the the cancellation of events, I I think it's respectfully it's not just the events that are cancelled, but it's the events that don't come because they fear having to cancel once they're here because of the rain. Um, Brian, I think, could certainly provide us with any events, cricket events that have been cancelled because of rain over the last, you know, several years while we've really been actively using the field. I think it's relatively minimal, but again, that's because some of the events just don't
come because of concern over the field. So, I think that's a piece of that puzzle. And then in terms of turning away any events, I don't believe we've turned away any events um because of trying to protect the field. And in any event that we have, we've generally helped them to find another location in town, often that Cedarport District Park, occasionally Morrisville Community Park, where we can help them hold their event where it just may not be practical in the park. But again, I want to commend staff again because they were able to get Batu Kama uh back in the park just a couple weekends ago. um and that was able to work and you know there were some protections put down on the field and then some other things that we'll we have a good afteraction report we'll continue to have conversation with them um but we were able to accommodate that with the protection of the field um any other thoughts Brian on special events that's okay
great um my other comment is about the missed opportunities of events because of reliability of the conditions. Um, in my understanding, it is not just the field and the lights that are needed in order to have a largecale event. Um, we need dressing rooms. We need um like a a press booth. We need um specialty kind of amenities brought in in order to facilitate those events. And so I fear that the goalpost will continue to move and the amount of money and investment that we have will continue to move without us getting a profit of the large scale events. And that's really it's both direct and indirect. The indirect is the hotel rooms and the economic balance if you will when we have a large
scale events for the region and also for the recovering the cost of hosting the event is very um really hasn't uh panned out yet. So, as we continue to invest, it's not just the field that needs some um you know, refurbishment. It's also we need facilities. We do have practice pitches now, but the dressing rooms are something I feel like is a barrier to um league play and some of the other things where those opportunities because the players don't have really good reliable um facilities in order to practice andor um be present in those conditions. So I know we're we are just evaluating the field but that's my thinking is like what's the next you know uh assumption what's the next spend? It's not once and done in the field and then we're good and then everybody comes and everybody plays. There's another shoe that's going to drop. And so, um, I'm a little hesitant about how much more is this going to be before we really do get the momentum that we want from this field. And I really do want our local teams, our local players, the public that has special events to enjoy the field. So, I think the drainage makes sense, but it's not the cost of just the four million to make this usable. it is higher than that and that's where I have great pause. Thank you.
So I think you're you're not wrong at all. Um and again you saw some of that in the BDP study that we commissioned. Now again I think that that you know gave you sort of a part one and then a part two which really really changes
that park to the good. I mean it creates a lot of amenities. It creates a lot of community assets. Um but I I think I mentioned earlier if I didn't I apologize. Yeah, there is still a desire for particularly locker rooms. I think that's the biggest ask. Um there are some options that we could consider for that that would not be overly expensive. They make some portable units. Council member Garamela has shared some of that previously. Um it's it becomes a question where do you put them and what do you potentially displace at the park? How does that work? Um, so there is opportunities for that. And then again there, you know, we we certainly could do some smaller spaces for a medical room, an officials room, a media room, things like that. So it doesn't necessarily mean that the larger events won't come. It does more impact the revenue stream when those large events come if you have to spend all that money to bring in the temporary facilities. So that is certainly something that can be discussed in the future. I think that the the field condition is is the key right now to making it more available to everyone and to increasing our ability to host events. We can still bring in those temporary amenities as needed. And yeah, I think that is a conversation down the road that I don't think I can certainly comfortably tell you if you spend this $4 million, we're done. I I don't think that's the case, but that's part of the ongoing conversation of what else do you want to have happen? what level of cricket play do you want to have? How much do you want to invest to see some revenue back? um because that would make a difference in your revenue investment in locker rooms and the less that they have to temporarily bring in with tractor trailers and space like that certainly that enhances the likelihood of revenue whether that's through our agreement with ACE primarily major league you know minor league is great they're just not necessarily bringing the crowds that generate that need but major league cricket and then certainly ICC international cricket council events and if we were to see
some of the USA cricket events those would also be where they would want generally those amenities and it's a question of do you at some point in the future build them or do you you know just continue to bring them in. I think that is also another opportunity to discuss some sponsorship um or a partnership to do some of that. We we touched on that lightly when we talked about the BDP study that if you look at the high end of that BDP study that would have to have partners probably plural to be able to do that level of investment by the town. Um I don't know that we could ever individually do the high end of that or even you know which was over hund00 million or even the first I think we were between 20 and $25 million. You know that's a significant investment that may call for partners and others that would be willing to support that.
Thank you
council member Johnson followed by council member Garamela please. So, I I am really pleased that I get to follow um Mayor Pro Timraati and Council Member Scraven Johnson because I could echo the same um thoughts and questions and struggles and um and how torn I am over this and I kind of spoke to that at our last meeting. Yep.
How um not happy to be here. Um, but of the three options we have ahead of us, um, the option to delay a year is just off the table for me. Um, if we're going to delay a year, we might as well do it now. Delaying a year is not going to make it any less expensive. So, that that is not an option for me. Um, the last time we talked I I brought up the fact that the there was a third option to do nothing and kind of cut our losses and move on. And so I have thought about that a lot and I've struggled with this a lot. And I appreciate um that everyone is here quite frankly and able to answer
questions and I appreciate all the thought that went into the presentation tonight. Um and I really appreciate uh Mayor Pardraati's comment about the future cost to the field if we do nothing. Um and there is a cost to that and um there is also a cost to the public if they if we have a field that does not drain properly and is not usable to the public. And so um that that is something that I would like to rectify and I would like to make sure that um the field does drain properly that it is use used for as many events as we can going forward. I'm pleased I was at the bot lakama um event recently out there and all look well to me but you will have to tell me how the field was after. But I appreciate that you accommodated them. Um I I um I I do want to echo Council Member Scraven Johnson's comments about kind of the moving of the goalpost and kind of where does this end because that concerns me too. So I think um I'm landing uh tonight on we need to move forward with this. Um not happy about it. I'm sure you're all not happy about it either, but we need to move forward with this. And then we need to have a um as we move forward discussion about this goalpost, where does it go? Um and how do we make it permanent in a spot so that it this doesn't continue um especially um if there's going to be, you know, limited use um with major league cricket. That that's very concerning and that's a topic that we can talk about at at another time and about that agreement. But um um but thank you again for all of you for being here. Um Brandon, thank you for the update and information you brought us uh
tonight and um you know I'm I'm ready to move on this project tonight. And I will mayor if I could real quickly I apologize mention I don't want to get into it right now but Frank and I are discussing and with with staff's input uh we're going to make a request to ace for an a third amendment to that agreement uh that would give us more flexibility in a number of areas in terms of how we can use it when we can use it. Um so we're working on that now. I expect we'll have that for them in the next couple of weeks and then we'll we'll certainly follow up with you after we get that under motion. Thank you. Council member Garamela, please.
Excellent presentation and and you got all the information that we were looking for. U especially from Ace. Um, I'll be honest that I don't have much faith that we will get major league here because just from your words you're saying if the Washington stadium is not ready then they will think about it. It will be not ready this but by next year it will be. So, and and I don't blame them because uh you don't like for Carolina Hurricanes, you don't want to go and play somewhere else when your home crowd is here. So, and we don't have a home team. So, my assumption is pretty bleak. Uh even though they have given me 50/50, I would say like if not might be 50/50 but in the future I don't have much faith on it. Um but I do have a lot of faith on the USA cricket um about the Olympics and because they need fields and there are a lot of teams that will be competing and cricket will be used first
time uh in in Los Angeles Olympics. So uh we need to fix it. Yes, the costs are higher, but I want to include the locker rooms as part of this because it can't be after there's major constructions that's going on right now. If you try to basically do after there was so much damage to the field, you know, pulling all these things here and think about like you need locker rooms and I'm more worried about women cricket. They have to go like almost I would say 200 yard like 100 yards this way or the other way to go to get a restroom and that's not right even for them to change or to do anything. And uh it is not good for any of the teams because they need a shower, they need to prep themsel in. They have individual locker rooms and you have excellent $5 million, $7 million um ground, but no place to do it. So the reason I bring this up is I'm not interested on the phase two all those nice fancy pictures that we were shown that will cost millions and millions of dollars but at the basic you know we should have the two locker rooms um and plumbed and you know because my fear is math will come back saying okay we need to plum we need to basically rip off some of the things you're pretty much right Now you're ripping off the entire stadium ground and redoing everything. This is the best time if any pipes need to be going there. And uh otherwise it's expensive for us even if we host it and if we had to pull those
uh temporary toilets and locker rooms all the money is going towards that. So um I've seen random u pictures of some locker rooms like a container locker rooms. You just put them on two places plumbed and you know water that will suffice for a long long long time even before we go to phase two. Uh and that is needed to be done now than later because I know everyone wants it. We don't want to be at a position, oh you have beautiful grounds, no locker rooms. Sorry. And and after the locker rooms, I think from what I know that that is it. I I'll be honest because we have practice pitches. No one can beat us on that. We have excellent field trained and we have good maintenance staff. We have locker rooms. We have the people to watch cricket. And I think uh we I'm I'm very very I would say you know it is needed. That's it. You know there's no other way. Do it now or never. Uh because and and after after we have the phase two you can take these locker rooms and put it in shadow park. It's a plug and play you know use it there afterwards. But those ones I think need to go as part of this. It doesn't need to be part of the I understand quantity is locked in with what we are doing that we have nothing to do with that but this can be added from account point of view to what needs to be added. So both are two different entities but going in the same time will help to you know ensure we don't have reconstructions again. That's that's my two cents.
Thank you.
Thank you. Um, I would say that I'm supportive of option one at this time.
Um, I'd like to get that taken care of tonight and I'd like to have future discussions about whether or not we can piggyback a little bit and getting some kind of modulars going forward. But I for option one, I'm in favor of that. I'm in favor of generally looking into having some kind of portable locker rooms in the future sooner rather than later for the reasons mentioned. I think that's a good idea, but where is the question for me. So, I'd need staff to sort of bring forward something on that, but um I'm in favor of going forward with option one at this time. Um we have two council members who we haven't heard from. I think staff would appreciate that one. Uh council member Patel followed by council member Kesler.
Uh she already went, so we're going to have everyone go once and then it'll be Mayor Pat and then council member Johnson for a second round.
All right. So thank you grand first of all for the additional information that you brought us in front of student. So now I recognize the importance of the drainage improvements that that is the reason why council have previously approved this right uh the question before us today is whether we want to commit additional million dollars right that that's the question really not whether um drainage is important or not I think we all agree that it is important um so what I want to understand is now you have said that it uh we have enough funds in the reserves to uh uh to continue with this. How does it affect us in the future? Uh how does it impact the future budgets? So from an operating standpoint, it doesn't I would say that the field improvements don't impact future operational budgets. It's going to improve the conditions there. But again, I think what you've heard is it doesn't really change the maintenance requirements of what the staff would be doing. So we won't come back and say, "Oh, we need, you know, two more staff
because we made the field nicer." So I don't think that impacts uh the operational budget going forward. This would be more of an impact on your capital improvement plan and what revenue what what resources you have as you make decisions on updating your five-year CIP and what projects are or are not included in that. Right. So I think uh you mentioned that currently rain recovery requires about four to six staff uh staff working what 8 to 12 hours to dry fields before the tournament play. That equates to 1300 to 2,800 in staff time per day. Would that go away or
it would certainly reduce.
I think it would certainly reduce. It would wouldn't go away. There's always still field and work to be done. Yes, but certainly there would be less work, less work hours, less time spent preparing the field when it's wet.
Okay.
All right. Thank you.
Yes, sir.
Council member Kling, please.
Thank you, Brandon, for uh bringing this uh presentation back to us um and laying it out for us. Uh I had a chance to review it before the meeting. was very um very helpful in uh making my decision here. Um first I support the allocation um or option one. Um uh Church Street Park is uh in the Cricut field there is an important public asset. Um cricket's an important and significant part of our community and these improvements I think can expand opportunities to play and improve the reliability of the fields. But I do want to emphasize that um you know I believe our arrangement with ACE is really not a good deal for the town. Um my understanding is that the town is ultimately bearing the costs of capital improvements and ongoing field maintenance. I worry that this contract is pushing us to invest more and more into a promise that has yet to be realized. Public investment can create
real value for our community, but we need to be careful that the benefits of that investment do not float disproportionately to a private enterprise. While the costs and risks remain with the taxpayers, the public is funding and maintaining the infrastructure that supports a private commercial operation. We have a responsibility to ensure the public is receiving a fair return. I don't believe though that means we should abandon the project. I think we can agree that the contract is unfavorable to the town while also recognizing that the facility has lasting value for our residents. I am minimally considering the ACE contract, the Olympics training, the other cricket organizations that we could partner with, the revenue potential, those are nice to haves, but I don't think that we should be we should be using those to justify further investment in cricket uh Church Street Park. Um I think we should primarily focus on expanding access to our residents, supporting community life, and ensuring that the people who collectively fund these facilities are not simply subsidizing a private commercial commercial enterprise. Um, but I do believe the long-term community benefits of completing these improvements justify this all allocation. But I hope that we can learn from this contract and ensure that future agreements better protect the town's financial interests and the public's investment in the future. Thank you. Thank you very much. Everyone's had a chance to make their comments and share their thoughts. At this time, we'll have a second round for anyone who wishes. Uh, Mayor Petro, please followed by Council Member Scari Johnson.
Yeah, this is quick. Um, I just want to know do we have any idea about costs of the temporary units and would would the is there any way that we could get the temporary units at the same time like sometime within the next year that fields will open because I do think that temporary buildings with additional bathrooms with you know I think that that's a net good anyway for the park and
it's even possible that there if there's going to be meeting space in there, we need meeting space so badly, you know. So, I just I'm just wondering what's the do you have like a ballpark idea of what that might cost?
So, first let me just I want to be make sure we're on the same page. There's not going to be meeting space involved with this. This is going to be locker rooms is what I would suggest we would do. the the challenge we have is not necessarily locating a a either a prefab or even constructing something. Um the the struggle is where do we put it and if we have to displace something what do we displace and where does that go? Um you know we had some early conversations about that of you know there's there's some space where the playground is but you know a community park needs a playground. Um you know we need to do some work to the tennis courts at some point. Do you displace those tennis courts to another park and use that space to put the lock I there's a lot of options there to consider. I believe that um that the one example that we've looked at is what council member Gary Mel has shared. I believe that the structure was around $50,000. Now again that's the structure that's before we push a piece of dirt, put a pipe in the ground, do any of that. Um so I would be hesitant to even guess what that's going to look like. We can certainly come back to you with some reasonable estimates of what that looks like. Um I think there's two pieces of that. There's the philosophical piece of where do you put them and what do you move and then there's the what's the actual cost and can we get that done uh in a reasonable amount of time i.e. could we get it ready for summer of 27 assuming that you all elect to move forward tonight.
Okay. Thank you
council member Johnson please. So, thank you um Council Member Garamela for kind of taking on the uh challenge of the lock rooms because I think it started us all thinking about feasibility and so forth like that. Um,
I would say that the plumbing or the underground work to support temporary trailers or semi-permanent trailers should be done at the same time as the drainage work because underground work is better done once than twice. We do this with our roads. You know, it's better to make a four-lane road than a two-lane and then expand it to a fourlane. So I would think that the analogy holds true here. I know that there's some exploration of where would you put certain assets and that is not decided. So you can't just slap in infrastructure. I I get that. But I think it is important to explore it very quickly so that we can get some ROI. So we can certainly do our best on that. I I don't disagree at all. The time to do it is all together. That may pose us a challenge because of the urgency of getting the construction going to have the field ready for next summer. Um we also have um some storm water limitations on that property um that we would have to potentially address. Um and there's also you know the the challenge of working in the park is also just as a reminder it's not in town. It's an RTP, so approvals have to sometimes, depending on what it is, go through RTP, and then of course, um, a lot of the permitting has to go through Wake County. Uh, so that certainly adds a little bit of time to it. I mean, they're generally good partners. They will help us, you know, move things along, but we can ask nicely, whereas here, we can pretty much say this needs to be done now with our staff. So, that's a little bit different. Um, so I think we could do our best to at least get back to you with what that could look like, but I think we would have to do that in the context of moving forward with the field improvements and then starting to study what the locker rooms could look like and how quickly that could happen and then what that cost is. And of course, you'd have to we'd have
to identify, you know, funding sources for the for that as well.
So, how much does it cost to rent those for a major event? I I don't have a
Well, I know I'm not asking you to like really tell me the number, but that's the question that we're trying to answer ultimately is renting something that has to be brought in for an event. Even if we do the drainage fields, that cost has to be provided in order for large scale events to occur. Blocker rooms have to be available. So, you know, investing in semi-permanent is probably around the same cost as some of these um you know, improvements that we're going to make. I I just sense that it's really expensive to get the temporary um facilities. [clears throat]
Yeah, it it certainly is not cheap. And again, that's that's part of what eats into what would be any sort of revenue share. But if you give us a little time, we can certainly get back to you and give you an idea of what a better quick summary of some initial information around what the locker rooms might look like, where they might go, how that might work. But again, want to emphasize we need to do that in the context of again assuming you all wish to proceed tonight. Don't want to make that assumption, but should you, uh, that's got to go. Um, we've got to go now with that. And they've got to get out there and start digging so they can get that work done. and then we will jump into as as soon as we practically can looking at what the locker room options might be.
Okay. Thank you.
Thank you.
Okay. I'd like to recognize council member Garo, please. Yeah, Brandon, I think two times you said from where I see like you know I think you'll get a support from assuming all the people hearing uh to move forward but don't consider this as a separate
project because stopping and everything is so critical you know because all have to be you know tied together the drains and all those things. So um that is my most important thing you know finding a place you guys are the expert are the current takeout places can also be done some kind of a thing the same places to put two um like u containers there but that is going into engineering not my forte but I think it needs to go and it has it needs a serious uh consideration because I think we'll lose a good opportunity. That's not
No, I agree. I just I just want to think be clear that the challenge is that if we need to pause the renovations to determine the locker room, we're going to lose 27. What I'm saying is both can go parallel is don't stop what you're doing because you already have a plan of action of what you're going for but with a foresight of what is needed so that that is not over overlooked is what I'm saying.
I understand what you're asking.
Yeah, let's
I think there's a strong desire to have it be concurrent as much as possible. Um but option one seems to be pretty well supported here. Uh Council Member Kessle, please. So, I'm not in favor of the concurrent locker room um field upgrades. Um certainly one thing with the drain if we're talking about storm water versus sanitary on that. Yes, there's storm water involved with lockers and whatnot, but um I don't think at this time it's as easy to just slap that onto the um you know, throw that into the plans. Um and certainly in due time if it was um you know, worth worth considering. Um, like I was talking about in my first comment, um, I don't think that we should be, it's a bad contract. We shouldn't be trying to bend our bend over backwards to appease this contract.
Um, I don't think if this is the last thing that we did was these field upgrades until um, uh, until the contract is is um, run out. I I'm not convinced that that's a bad option. Um, so I just wanted to get that input. Thank [clears throat] you. I think in the for what it's worth category understand that concern. I do understand the concern with trying to do things to appease the ACE agreement. I would say in this case it's going to open more doors for us in terms of some of the ICC opportunities, the USA cricket opportunities as well. But but I understand where you're coming from. Thank you.
I don't see any other comments or questions. So, I think if we can bring the motion up to the screen, that might be something we can move forward with.
We did not have a motion slide just because we weren't sure which way we were going. But if whoever wants to make the motion just read this top paragraph there, that should suffice.
Okay. See like Council Member Johnson up here to be ready to make a motion.
So, I have the resolution in front of me. So, I'll read from the resolution. Um, and make motion to approve resolution 2026-33 333 33-0 of the Morrisville Town Council authorizing phase two of the design bill delivery method for the Church Street Park cricut field reconstruction project.
I'll second motion from Council Member Johnson, a second from Mayor Petroati. All those in favor, please say I.
I. Any opposed? Okay, that carries tanously. We thank staff for all a lot of our work. Thank the council for um really good discussion that brought some important points forward.
Thank you.
Council, if you will also motion to approve the CPOA.
Okay, you have that up.
Or can you put that on screen for us, please?
I can I have that in front of me, too. Okay, I make Thank you, Kayla. I make a
motion to approve capital project ordinance amendment 2026-333-0 of the Morsville Town Council amending the parks capital project fund ordinance.
I'll second
motion council member Johnson a second from Mayor Pet. All those in favor please say I.
I. Any opposed?
Hearing none that carries unanimously as well. Thank you very much Miss Birdling. So before we leave this item, mayor, if I could, um I don't think there's complete consensus. I want to confirm there is consensus at least amongst council that we proceed with beginning to research locker room options and possibilities.
Yes. Yes.
If not, it's on at least five, I think. So, okay. Thank you. We'll we'll dive into that and we'll get back to you as soon as it's practical as to what that looks like. And one thing I want to say about that is it seems like the field is in the middle and we already have plumbing on both sides. So I don't see unless there's a real need to have new piping through the field underneath. I think those can be kind of separate.
It's capacity.
It's capacity too. But I mean I'm not sure where our storm water and our
Yeah. Let us let us start digging into that and we'll come back to you with some answers.
Did you mean to say digging? Yes.
Yeah.
Okay. Just checking. Okay, thank you very much. Good discussion. Um, now we are num number 11. For a full listing of our events, please see the town calendar at www.morrisvillec.gov. As I already mentioned, we do have Boo Bash coming up this Thursday from 6:00 to 8 Morrisville Community Park. So, please join us for that. Moving on to council comments at this time. Council member Johnson will share first and we'll be followed by Council Member Patel.
So, I have no comments tonight. Thank you. Council member Mattel followed by council member Kesling please.
Sorry I just want to thank the uh staff for organizing the Diwali uh event earlier this month and um u that's it. Thank you
council Kessen followed by myself.
I want to also thank that for the um the wall event and uh also remind folks um to get out and vote.
Very nice. Uh I'll share now followed by Amir Petrabody. Um I want to share that we were honored to welcome the US ambassador to Switzerland this past week alongside Novartis. We are proud to partner with many companies who are advancing research for everyone. Election day is next Tuesday. Please vote for your future and that of your children and I will be at the boot bash. So please join us and have a lot of fun this upcoming Thursday. Next is member body followed by council member scaring Johnson.
It's hard to follow the guy with a lightsaber. Um yes. Uh echoing what council member castling said, vote as if your future depended on it because it does. Early voting ends on Saturday, not on Sunday. So if you're going to vote early, you have to get there by Saturday. Thank you. Council member Johnson, followed by uh Council Member Johnson. Please,
I would just like to say that um voting is important. It raises your voice. It shares your um hopes and dreams for brighter future. And I hope to see you at the polling location if you haven't already early voted. So, thank you,
Council Member Johnson, followed by Council Member Garella.
Okay, you already called on me, but I still have no comment. Did I not Did I
Oh, no. I see um Johnson came to a different line. So I thought it was a separate Johnson.
So you are correct. Still no comments. Okay. Uh mayor council member Gar.
No I think 100% agree you know go out and vote. Um sometimes I feel with the early voting there's long lines you know doing on
November 3 itself because the schools are less lines. Uh but you know whatever make a plan do it. Uh thanks to staff for accommodating Batgama. You know it was uh uh it rained a day before it was I was a little worried about it how the performance of the you know grounds will be or will it act different u but I think it really came out good. Um and uh my main um Diwali was pretty well done and it had a lot of crowd. The only one thing I would say was this is not for Diwali in particular but the kids are the families are walking all the way from Marshall Carpenter you know to community park. So that distance is way too much you know like if we could run some shuttles back and forth within those inner loops or something like that it will be good because you know I I'm seeing like all people not able to walk stay for some time and then go the distance is just too much that's just a thought.
Thank you.
Thank you Mayor Zuda. Anything from staff? So what you're receiving is a PowerPoint slide that was posted at the NextGen Life Sciences conference in the Washington sorry. So, what you have is a PowerPoint slide uh that was posted as part of a presentation this week at the NextGen Life Sciences Conference that's happening in the District of Columbia. Um, and this was Tiffany's not even at this conference. She's at a different conference um supporting us, but I
thought it was really important that you see how we've got how she like I've done anything. She has gotten us onto the national stage. So she wasn't even at this conference but this is Novartis uh talking about speed to market and just for the audience what it says is uh Morsville special conditional use permit um manufacturing process required building height variance and use of outdoor tanks FAA nearby development engineering constraints were all factors the town laid out timing of plan and process appeared seamless to the public and local MVP Tiffany Superwoman McNeel director of economic development for the town of War Morrisville.
So, lot of good things happening in town and and Tiffany is involved a lot of those. Amelia is in the back. Amelia is also involved in a lot of those. You'll hear from her in a few minutes. Um, I just thought it was important to share that with you. Thank you.
Thank you very much. Really appreciate it. Um, we're moving to work sessions at this time. You want to stand at the table for this, sir?
Yeah. Shall we take a 15-minute break as we head down? Okay, we're going to take a 15 minute break break. Please reconvene at 42
Thank you, Kayla. Um the first the first update we want to cover is just give you an overall construction progress. Um I would like to just ask uh Mark to give us that overall construction um update in addition to the videos that you see in a monthly basis.
Uh good evening council members. Uh thank you Jazelle. Uh so we've basically have made a considerable amount of progress at town center on the park side of the project. U many may have been driven by and seen but we've we've completed pretty much all the underground infrastructure work all the water sewer uh storm drainage work that feeds Fox Drive and that will eventually feed some of the buildings there. Uh you can also see the support building actually is about a story high right now. So you've seen the block work has gone up. They poured the slab. They finished the utilities on the ground at that building. Uh the restroom building is about half a story high. So that that's pretty cool. that same they've got the slab in and they've got some of the underground work completed for that. Uh you can also see adjacent to the restroom and the support building. You can kind of start to see the uh the cottage retail where they're going to be placed and you can see the seat wall that goes uh from the cottage retail and and kind of steps down towards the actual uh park itself. So the the seat wall has actually been formed and all the rebar in place. So you kind of see that curvature and starting to take shape there. uh you you know it's starting to really take some some really nice shape. So uh yeah, they made considerable progress. We're still on schedule to finish in the summer of next year. So we're making good good strides to that. Um and we've been meeting with the contractors and our partners seeing development as we go along. So yeah, everything's going really well.
Are there any questions on that update before I move to the next item?
Oh wait, and if I could just plug that video one more time. uh it does get not because it's me but it does get a decent amount of views considering between one and 300 views each month. So people are actually looking at it and they're taking information from that. So thanks
and shameless plug just feel free to
share it on your own uh social media accounts so that it can continue to reach the community. Um so this as with any construction projects there is always some construction challenges that we face and there is this is the next update related to concrete pores that need to occur at different times that are outside of our normal operating hours and we have a several requests to be able to do some early uh concrete pores for the multif family component of the project is a complex uh building and they they have a need to be able to do some early pores. We have approved some of those early pores to occur set up starting at 5:00 a.m. and operations beginning at 5:30 with requiring them to deliver door hangers to residents within 1,000 uh feet and they have delivered at around 700 door hangers um 170 I'm sorry 170 door hangers. I have uh we have not received any complaints as related to those particular pores. There have been a few that have had to be cancelled because of external challenges with the concrete plant, but the others have proceeded and we have not received a complaint. However, those uh they also have a need to do pores earlier than 5:00 a.m. and those are for 1 and 3:00 a.m. I would like to ask Mark to uh just share a little bit more as to why do they need to do a 1 and 3:00 a.m. for and some of the the research that he has done as to what some of the other municipalities around us do when they have construction like this that is an infield development within an area that is surrounded by residential which is uh some of the the feedback that we have given to the contractor that we need to be mindful of the residents that leave around the project. So Mark can you just uh give us more information on that?
Sure thing. So, uh, we've had lengthy
discussions with the the contractor, um, and we've done some our own research as well. I mean, the type of building that they're building there has post-tension slabs. Uh, those type of slabs based on the way they they are placed, by the way, the concrete is placed. Uh, the timing factors, um, the the concrete has to meet certain mix requirements, things of that nature, and the size of the pores, the amount of concrete they're actually bringing to the site.
Um, just require it to be different. And also, we're approaching times of the year where the temperatures start to get colder at night. Um, so they want to definitely be finishing the concrete work where it's the hottest part of the day because as it starts to drop down in temperature, what happens is the concrete takes longer to cure. Um, so with with all those factors, it's really difficult or pretty much impossible for them to start pouring concrete at 7 a.m. and finish at a reasonable time with the size of the pores and the type of work they're doing there. So, they're they're looking um they're they've actually made a request uh for a few of the fours to be at different times of the morning, early morning hours. Some as early as 1:00 a.m., uh some as early as 3:00 a.m. and some at 5:30 in the morning. And we reached out to our fellow municipalities to see what their restrictions were. Um everybody had something a little different. U Carrie, for example, our closest neighbor, they basically don't even really have a a permanent restriction. uh what they do is it they allow it to occur and then if they get complaints they feel those complaints through the police department and see how they can mitigate that but they don't have any initial upfront permit approvals that are required for them to to do late night early morning pores um Apex does allow them as well but no earlier than 3 in the morning that that was their um information they provided for us Garner doesn't have a restriction in commercial areas but if it's within a certain distance of residential they do uh provide them restrict restrict at that point. Um, and Wake For Wake Force has only gotten requests as early as 4 a.m. which they which they've granted. So, um, and we know the bigger cities [clears throat] like Raleigh and Durham pretty much allowed this kind of thing to occur. So, they're used to more
downtown development type of construction, so they're used to that. So, uh, we wanted to bring that to your attention so we can, you know, get your feedback and and see where we go from there.
Um, Mark, can you talk about the the number of requests that
Oh, yes. Sorry. Yeah, let me go over the details. So, they're looking for, and I don't have the specific dates at this point, but the total number of pores that they're looking to tap have outside of the normal construction hours are 11 pores. Uh, two of the concrete pores would happen at 1:00 in the morning, two of them at 2 in the morning, three at 3 in the morning, and four at 5:30 in the morning. So, um, the 5:30 in the morning ones, I think the manager felt comfortable, um, authorizing those with the proper requests and the proper, um, notifications to the residents. I think we wanted to get your feedback for the other ones.
Council member Garella.
So without understanding um like what they do, how much noise does it create? Does it go over the noise ordinance levels? Because I'm just trying to understand that before say anything.
So we've attempted to get a reading. So the police department can do sorry noise readings. Um unfortunately the times they've been there the poor didn't happen. Um so we're going to get that the next time a pour happens. Uh we don't believe it will be disruptive uh into you know the church street towns is the most likely to hear that. Um you know the other side of Carolina pretty far away from that. Um but in talking with them we don't think it's going to be noise that's going to inherently wake people up. Um, but yeah, we're getting a decibel m decel meter reading the next time they pour.
Yeah. Even if they're not any other place they're pouring, we can at least get the reading from like 10 ft, 20 ft, 30 ft, 40 ft because I understand that it's their u time is of an essence and all the things that you said they
had to do what they have to do, you know, and and there's not like a permit that we have to you know sign off on and the ordinance say like a discretion of the town manager in that u so um I feel if it is not like a significant I am okay you know because that's the reason I was asking the decibel meter of how much it is
let let me mention so there there is going to be a a variance of noise ordinance because um when you take the ambient sound level at 2 am it's I'll just say zero. I'm not gonna it's not zero, but it's it's
the ambient decibbles are probably like 45 or so. And then as soon as you put the pump truck on, so you're going to have a pump truck um which more of a humming kind of vibratory sound. Um they're they actually went ahead and and acquired some solar lighting systems with with uh that they have battery packs, so they're able to not run the generators for lighting at night. So they've got that at least that part figured out. So, they're trying to mitigate some of the sound, but you're going to have some some sound that's going to go above the the noise ordinance. Um, you know, even if and even if the daytime, it's above the noise. So,
I understand. I can hear the train from
and the fire trucks, too. So,
I have um council member Johnson and then council member Johnson.
Thank you. I agree. the noise um is a consideration about impact because we have a noise ordinance. And I think one of the things that neighbors want to know is what is the scope of these night pores? You know, what is the duration? Is it going to be over three months, two months, you know, because it is going to affect their quality of life potentially um during that period of time. The other aspect and I have had a driveway poured
in my um over my experience. It affects traffic. I think that's one of the considerations for doing some night work.
That's right.
Um and it also potent. It's not just sound, but it could be smell as well. Um concrete is a mixture. It's not just pure. It's a blend of different chemicals as well as um solid materials. So, there could be some odor to it as well. So, just the notification to the neighbors about that impact. the traffic is I don't know if all of the trucks that have the materials would be inside of the construction site or would they be needing to be adjacent to the other um neighborhood roads that would impact people's access to to leave and to um enter the neighborhood. I think that's a consideration and awareness for planning purposes if you do know the the schedule. And then the the last thing I have is about lighting. I don't think it's just the pores for this project that you're going to be discussing with us in the future. I also think that as schedules get more aggressive or behind or ahead, you're going to want to do night work. And night work is going to require lighting, which is light pollution as well as potential sound. And what approach are we going to have about night work being done at that site? And what notification can we offer the neighbors about awareness in a timely way? Because just putting um hangers on doors is what I know is required, but is there additional neighborhood awareness meetings that we could do specifically for their quality of life during this project? Thank you. Um to answer uh one of your questions
related to um the traffic essentially what the trucks will do is the truck will come in and there may they may have to line up on the street as they get used and they come into this site and do the work. So we don't anticipate that for early pores we're going to have that much um a traffic that will impact our residents. Um it when we talk about the length of the impact when we say 11 pores that is equivalent to 11 days of impact like each pore is a day. Um the only reason for which those may have to be extended is if for example they had scheduled an early pour for tomorrow. Something happened with the plant or with the pump that did not work that they may have to reschedu that. that means that the impact tomorrow did not occur and it's just been rescheduled for a different day. Um so for right now those are the ones that we are aware of. You bring up a very valid point. There may be other needs in the future right and we will take those as they come but for right now these are the ones that we are aware of. Um just and just for for reference, the the noise ordinance and the the permit um allowances allow for construction activities between 7:00 a.m. and 9:00 p.m. every day. So they have a pretty wide open window under normal circumstances to work. And as we know with the time changing coming up, there's going to be lights between 5 and 9. If they work I don't think they're going to work till 9:00, but if they work beyond five, it's hard to see. So there's going to be some lights coming up real soon. That's a good point. Council member Johnson. So, this reminds me when [clears throat] um the work was being done on Morrisville Carpenter and not only were the residents on Morrisville Carpenter impacted um but we had complaints down on Morrisville Parkway because you're right in the evening sound travels far. So, um, and I I recall there were all kinds of
concerns and complaints about noise, but my recollection is the biggest complaint was the beep beep beeping of the trucks. Um, that that was waking people up in the middle of the night. So, I'm really concerned, too. I understand the weather, the need, the temperature. I get all that. But um I I would I would I would lean to try to avoid this alto together. Now the 11 days, are they 11 days in a row? Are they spread out over two weeks, a month? Tell me like
Yeah, it's it's likely between now and the end of the calendar year. So it's spread out over the next couple months.
They've already had a couple of boards at the 5:30 in the morning. So they they still have 11 to go, but they it would be between now and the end of the calendar year. Okay. And the residents don't know that it's coming. I mean, you talked about the door knockers that didn't have dates
before each time they are required again to submit another door hanger. So, it's not
these 11 times. Correct.
11 times. There'll be 11 more door hangers.
Okay. Okay.
They're always going to be notified at least three days ahead of time.
Okay.
That is coming.
With the information, what time the pore starts and things end with the call and stuff like that. So,
okay. And they did we we haven't received any calls with the contractor received just for information on the last couple ones that were um early morning. Somebody asked why are you are you pouring the concrete in front of my house? We told them no. And then somebody else thought we were replacing their driveway.
Those [clears throat] been the only the only comments, inquiries, complaints of the 534s.
That's right.
Okay. Thank you,
Council Member Kesley. So, how long will the pores be? Um, so each one is slightly different
because they're all different yardage. Uh, they're anywhere from 200 yards to as much as 600 yards in one4. Um so generally they're they're starting early in the morning so they can be finishing towards the later part of the afternoon um earliest evening at most. So 5 6 7 o'clock that's about 8:00 p.m. they want to wrap up because they're also concerned if they go into further into the night and it starts to be cool again and then starts to slow down the curing.
So I guess
finishing work becomes a problem. It's cold. I guess uh I guess what I'm getting at is maybe how long is the pump running? Is the pump running for all that time?
Uh no, it's generally the first probably till morning time
and then the rest is all finishing work. Um, so the the the loudest part of this all would be when the
unfortunately
um you'd want to fly this time
because there's no other way to get the concrete from the where the truck can pull into to the actual slab. So it's unfortunate.
Yeah. No, we and we we discussed with them a considerable amount of options Saturdays, Sundays, I mean anything to try to get it done during the day. We they they've really tried to exhaust every potential option. um to try to keep this to a minimum. Um and we we really tried to figure out other other I mean and we don't even allow Sunday work. We're like well maybe Sunday is better than you know Monday in the early in the morning, right? So we were trying to think and they they just weren't able to make some of those other options work out.
Yeah. Um, I guess with the um the 1:00 a.m. 3:00 a.m. in the morning time um pores, have we considered what days of the week makes sense to have those pores in the early morning?
I don't think we have and they haven't officially given us the dates for those that they're looking for and we probably evaluate that a little bit more to make sure that made the most sense. Um I don't know if there's a preference. I
didn't have a breakfast myself, but I don't know if there's a better day than not,
but they haven't submitted. So, we only know about the dates for the 5:30 a.m. ones. We don't know the their specific dates that they're proposing for the larger ones at this point.
Yeah. I'm just thinking that um folks are getting woken up on a work day, let's say. Yeah. You know, that might um that might be challenging. Whereas if it was a weekend then um
yeah maybe Friday's better because they're gonna go into Saturday.
Yeah, we can we can we can think about that.
Yeah, I think some of it's also about just the work schedule, right? I mean because if they're ready to go on a Monday and then they have to necessarily wait till a Saturday that just and you know we're we're we're into time crunch just because of a a variety of factors. So, we want them to be able to keep moving because, you know, any delays start to cost um them money and you know, we're partners and then there's other components of this where delays cost us money. So, we're trying to you know, also keep it moving.
Yeah. Pretty much as soon as they have the slab formed and prepared and all the rebars ready to go, they really don't want it to sit there like they want to finish it, pour it, and keep moving up. Um a number of floors they got to they got to do. And then uh um if for some reason there was a rainy event in between that, which I mean it's been pretty dry, but if there was and might cause some issues with that, some of the some of the slabs are ground level and they got to pull everything back out and reset the the base base materials and stuff like that. So it they need to basically pour as soon as they're ready or it makes the most sense for them to do that.
May I pretend body? I think the thing is you're not going to make everybody happy no matter what day you do it. I for me like wake me up on a work day. I don't care. I have to get up early on a work day anyway. Wake me up on a Saturday with this and I will burn that site down. Like I I cannot
understand. We are very different. Like I mean I just I guess my point is you're not going to make you're not going to make everybody happy. No matter what you do, you're going to make half of the people mad.
So you might as well just follow the construction schedule that gets us there the fastest. Yeah.
And you know
and just do what's best for the job site.
Yeah. I mean everyone in the community should generally have expected when this started that there would be so many conveniences. It's a downtown and um you know just being frank about it.
Yeah. Yeah. It's going to be a nice very nice downtown. Urban construction unfortunately comes with some inconveniences
and I would say so when the first uh request came in and and Mark can you can chime in if if you need to. When the first request came in, they actually all came in for 1 a.m. course and we pushed back and said uh let's take let's take in consideration the impacts to the community. We have only approved one other site for early concrete pores and that was the spark site. Their distance to residential is so far that even though they had to modify two residents, it really was so far that they really didn't have an impact. So they had approval but other than spark we hadn't approved anybody else for uh for early pores. So taking that in consideration and knowing the proximity to residential then we said let's let's go back to the drawing board and evaluate your pores. We can allow you to do it at 5:30 a.m. which is the same thing we did with the habad. Um we did one uh occasion in which we let them do 5:30 a.m. So they came back and said okay we can do this many at 5:30 and we're going to continue with this. They try those and what they are phasing is that because they begin at 5:30 there are other sites that begin earlier those get ahead of them at the concrete
plant. So when it comes to time for them they get delayed and by the time all of that gets delayed it just makes the process a lot more complex. So that's why they're coming back with the request of we really need to consider the 1:00 am and 3:00 am. And recognizing that the that we are close to residential, we wanted to make sure that we are having this conversation with you all because as the residents start getting impacted, they will be definitely reaching out to you as well. And we definitely wanted to make sure that you were aware of the request, that you were aware of the reasons why, so that you are informed and able to answer any questions that you may get, but also that we can take in consideration any kind of concerns that you may have as we continue to evaluate this request. Um, so I from what I hear right now, it seems like there's general understanding that yes, it's a challenge we're just going to have to deal with. I didn't hear any absolutely not. So um from that I would we would just proceed and continue to evaluate internally and see uh the best that we can proceed with that and make sure that we are keeping the community informed. Does that sound correct? Okay. Thank you. So the next item we wanted to um talk to you about is um another challenge road closures. So there is um the wetland for this project was designed with the size necessary for the town center construction, but the pipes that lead from the site into the wetland were not necessarily built when the wetland was done because we didn't know exactly what the site construction was going to be. So as part of the construction of the site there are pipe outfalls or drainage outfalls that are coming into the wetland and there's two location which those have to cross now drive and they are going to need to install those. The size of the pipes is large which require a large operation. So uh sing proposed to close town hall
drive for the duration of that installation and that closure was proposed to be four months due to the complexity of operation. We evaluated the request. We analyzed the impact to emergency response because we have a fire station here, police station. We have two schools further up the up the street. And we actually had um our fire department do a da d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d d da analysis to evaluate what the real impact was to make sure that we weren't just overreacting but that we really had the the validation and um the impact to the fire department will add an additional minute to the response time which a minute can it's is a big deal for an emergency response. So taking all of that in consideration, we met with the team and we said, "Hey, the impacts that this will cause to the community, additional traffic on neighborhoods, obviously the the impact to emergency response, impact to the schools and the buses. we want you to go back to the drawing board and come back with a plan B that will reduce the amount of the closure for for this that will either keep one lane open for for the period and maybe if there are some closures that it will limit the closures for a few days instead of four months. So that's what they are doing right now. they are evaluating the options to be able to reduce the impact as much as possible and we expect that we will have that back within the next two to three weeks so that we can evaluate and um get back with them. So that's kind of the way we have um worked with that request. Do you all have any questions related to that request?
Council member Caramela,
why four months? What are they doing? you know, like you just dig a hole, put it high and put it back up. I I just don't understand why four months.
I'll let Mark explain.
So, yes, to to the
Yes, maybe to the general public that that would be the perception, but uh um the complexity and depth that we have to dig to install a pipe and the and the size of the trench because the pipes are actually elliptical and they're about this far in diameter. So, um, based on that and the time it takes between setting the pipes from the wetland and making their way upwards and having to move material from the wetland side of the project to the town center side back and forth, it was going to be very difficult.
Uh, it's about 120 ft from end to end and there's two sections they have to do at the same time. Um, four months is a is a relatively conservative figure. It probably would have been less time, but we didn't feel comfortable with any extended amount of time because it's not only the emergency services, you also have the detour is going to be routing everybody through Thornberry. So, there's going to be a long time where the traffic on town hall might be diverted through a residential neighborhood.
No, I understand 120 ft, but that 120 ft is town hall drive only or other
town hall.
No, no, no. Is a inter cross-section of town hall is 120? Yeah, it's about 120 ft from one. Yeah, the width of town.
So that's all has to be changed or anything deeper than that
width
and then it has to go all the way down into the wetland on one end and then into town center on the other. So the total length is about 120 130 ft of pipe.
It just between putting it down and setting it. You can't restore the trench that quickly and even with plates the the mass the width of the trench very difficult to set plates. Not that it's impossible. We're working on options. Um, but their first pass was they wanted to close the road. So, we're just keeping informed. Um, once we see the options, I'm not going to say 100% that it'll be open all the time. I think Jazelle did a good job saying there might be a few days here and there. So, we're trying to see what the best options are for emergency services, schools, the community before we come back and and provide. But we just wanted you to be a breast of what's happening.
Thank you. One component that I uh did not mention is obviously the the option of just making the closure for that duration. It was presented because it's the most cost effective option. It allows it to be close down, work on it and then open it when it's done. Uh so they are looking at that plan B option and that may come back with potentially additional costs that may be related to that and potentially additional time because the workbook moves slower than just closing it down if we had a lane open. Just wanted to put that out there. We don't we don't know what the magnitude of that might be. Um so we're just hoping that that's not uh huge because we recognize the impact of one or the other are huge for our community. So just wanted to be very transparent with council to let you know these are the things that we have been talking about related to this project. I believe I have Mayor Collie.
How far along are we on the internal roads? Can we get first responders to go through the work site?
We that's one point. We actually did make that uh we had that discussion with the with the contractor that if we were to somehow uh reverse the movement and have them come through let's say Fox glove uh the problem is that that Fox glove itself cannot be completed without this connection to the to the wetland. Um so we're having trouble making all that work. So this this is actually the the crux of moving forward. We we need to have this connection done so that we the rest of the site can actually drain out to the wet and other way we'll be able to bring Fox glove online. Um, you know, after town hall drive is completed, then they're going to make their way up Carolina because Carolina from Posa up to church will be closed for for extended period of time while while they actually build that into this, you know, streetscape condition that we're proposing. There's a couple residents there. We're going to make sure they can always get in and out, that kind of thing. Um, but yeah, it's we we did look at that.
You could just say no.
No, it was a good option. We thought
about that. We did think about that. That was a smart consideration we did talk about at some length. I see both. I'm not sure who was first.
Council member Kesley,
would the Indian Creek Greenway uh be required to be closed for this duration?
No. We did ask that question whether the greenway will be impacted and the answer was no. They believe that they can stay clear of that.
Yeah.
Council member SC. So I um because we don't have a presentation tonight, I just want to be clear for the public as well. When we talk about the wetland, there is Smile Creek Greenway, which has some wetland areas, you know, because let's face it, we have a lot of wetlands everywhere, right? Um, but we're specifically talking about the storm water area by Indian Creek Greenway, which is the wetland, but it really was um a man-made storm water retention pond, which now doubles as the storm water relief area for the town center.
Good point. Um, one thing that pops in my mind when I hear about closures and redirection and construction is our our project up the road with airport extension. Um, what is the timing on that finishing? What is the timeline on this potential closure? We we don't want to have two segments of Town Hall Drive concurrently being under, you know, orange alerts. Um because I think that it would not um be easy or safe for residents and visitors if you know the timing is such that um you know they're not done for another year, but it seems
like they're making great progress. I don't know if you know about what the expectation is for airport.
Yeah. So, I don't recall exactly when the completion date is proposed and I'd have to get back in on that. However, I do know that at no point are they ever planning a closing Town Hall Drive. They're going to do it in halves. So, there'll always be movement to Town Drive at airport. So, we we would be the only ones if we had to exercise this that would be closing Town Hall Drive at a certain segment.
Oh, nice. So, there will still be access.
There still be access.
Okay. Thank you. Any other questions and comments on this potential impact? Okay. Well, moving on to the next item we wanted to discuss with you. It um during one of the roundt um items, council member Patel had brought up the desire of being able to incorporate some veterans and first responder recognition as part of the town center. given that we weren't sure about the timing of the Veterans Memorial and when that was going to materialize and the direction was for staff to evaluate and just kind of explore options as how we could do that in a way that it would just be incorporated within the town center and be able to be a good addition to the town center without necessarily competing with the veterans memorial but complementing the veterans memorial if it was to be constructed in the future. So staff has done a little a little bit of work. I would like to turn it over to uh Mark and to Brandon who have worked with the design team to evaluate uh the options and they will walk you through that.
So I'll start a little bit um and then Mark can show you an image of what they have um proposed. So again they they've shown some options here on where that might go within the town center site. So each of those red arrows is sort of pointing out to um if you look on the sort of the mid left that's pointing out
where the nope up higher. There you go. Thank you. That's where the sort of monument sign for town center is going to go. Um and that'll start being designed uh once you finalize the sort of branding and wayfinding of what that you know logo is going to be. So that's what's there. So we don't want to be too close to that. So if you then move down, there's sort of three areas of options and I believe Mark the one they've recommended is option three.
Yes.
So that would be sort of in the general area of where the farmers market would meet. It would be adjacent to the education garden and the building there. Um that's what uh Clearcapes has recommended. We support that recommend because really that's sort of your second main entrance into the park. So the first one obviously is up at the top in the center of the picture where the um misters are going to be but this is your secondary entrance. Uh so we felt that that would be appropriate. It's also just maybe coincidentally if not closer to the police department, the fire department. Um but it would certainly have a lot of visibility there and wouldn't be taking away really from anything else that's highlighted on the plan. Kale, if you go to the other Oh, yeah. Um, what I would share is that as as Mark talks you through this, the the general cost estimate of looking at this, um, and obviously this is a this is a draft of what this would be, there's certainly more conversation to have about the signage and how do we do that? Um, but placing this and and running all the necessities to it is probably between like4 and $50,000 to construct. Um, as a reminder, we have not any money allocated for this in the budget right now. Um, I would I'm hesitant to say it can come out of the um money that you approved for our contingency. I think we should go into this uh with the approach that we need to identify the funds for it and then if by any chance we didn't need that full contingency at the end, we could certainly fund it out of that. But today
I would say we're just starting to have conversations about what that contingency might get into. Um so I'm going to suggest that if you're supportive of this approach that we would move forward um and that we will figure out the funding um plan to have a funding request in the future. Mark.
Yeah. And just to make a few points here, this is a simple rendering. This doesn't have to be the final way it looks. The sign was just a mock just to put something there. um some of the architectural features do uh combine and and match some of the things that are happening within the park with the brick work and the uh the bench itself. And coincidentally, this location happens to be somewhat diagonal from the future location of the Veterans Monument. So, it could be sort of complimentary that this is kind of like a small uh place where you can sit and and meditate and and then you're basically bagging across town hall drive where a future monument would go. So, um, yeah, this is the recommended location from the architects looking at different spots within the park. And, uh, like Brandon said, it has a price range of somewhere between 40 and 50,000 that they they gave us as a, um, a cost estimate.
Council member Patel.
So, what we are seeing here is just an example. That's not beautiful.
It's just an example. The architect took the liberty of just uh kind of matching some of the architectural features. The the plaque itself is just very generic. It doesn't say, you know, we could put something bigger, something different, different word. It's just to show what what it could look like as an example. Um and and and it's it is in the location option three. So, it kind of gives you a visual what's behind it. The education garden is what's behind that fence. Even though it's kind of looks like a slab of concrete, but that would actually be a garden. Um, and then the walking path takes you from the parking lot, the secondary parking lot into close to the support building, which is what you see on the background on the left.
Thank you. One more question,
Council Member Johnson.
So, I like the idea of incorporating a bench somehow in this design, and I realize you have to have a wall to put a plaque on. I guess I my only concern would be the wall blocking anything. And did you think about doing it reverse? Because the map you showed us before, this whole area is all trees. [clears throat] So why wouldn't you flip it so that that Yeah,
I guess
if I if I could take liberty, I actually thought the same thing because I thought then you would be facing the the future monument personally, but I was trying to get the focus on eventually there could be something [clears throat] much bigger that celebrated the veterans literally a diagonal across the bay.
So I kind of thought you thought from a different perspective. I was like, "Oh, this this should sit and look towards maybe the future money." But anyway,
and that that doesn't have to be decided right now. that that's but I I just throw that out there and it because I
I don't know I don't want the wall to be too high to block stuff too. That would be my other concern. But I realize you have to have a wall to put plaque on at the same time. So and again that can be
massaged over time and tweaked.
Yes.
You don't necessarily have a wall to
Yeah. You don't even have a wall. Yeah. Yeah.
You could have a ground mounted monument type of thing. Yeah. This was just an example of something and what it could look like in that location. It doesn't they're not saying this is it, you know, they're just trying to give us an idea. We needed something to come up with a price, right? So that just to give you a range of, hey, this is what we think it's going to cost.
Any other questions or comments?
Council member Cast. Um, I actually think it, um, it works well being more inward facing and certainly within the in the trees. Um, think of it like a reflecting area. Um, and
certainly, uh, you know, the geometry of it looking towards the future Veterans Memorial. Um, you know, I guess Sure.
Yeah. Yeah. Yeah. I agree. But I I I I I talked about it with the butterfly icons and all that kind of stuff pointed at town center. So it's a really good idea. Um perhaps if the design of it was in some way that um you know, let's just say that it's the plaque there could be some sort of other design element. The plaque is there and when the um the Veterans Memorial Well, I guess maybe the idea is having it at town center. So, I was thinking that this could be um you know, take it from uh this point in town center and put it in the into the um future veterans memorial, but um I'm not necessarily I'd say that, but then also, you know, it's good to have it in in, you know, more central in the town center. Um but I think a reflective kind of area um under the trees and shaded area folks can sit down probably be nice. I think one of the other reasons it would stay is that the conversation that's been had is it could be a veterans and first responders memorial. So I think that gives you a little more reason to have it stay there. And again, that likely is two separate plaques. I mean, again, this is this is by no means a final product. This is something for you all to react to and give us an idea of are we headed in the right direction and is that a price tag that you can be comfortable with?
Mayor Pamati. So, I would go at this personally a little bit differently because I don't like the way the wall looks anyway. What I would do is two benches, comfortable benches, like with backs on them, and put the plaques on the back of the benches, the first responder and the veterans, you know, then you have a little seating area and
you don't need the wall. I don't I'm I'm not a huge fan of that. I just I just don't like I think it's the color actually that's throwing me, but I don't like it. And I think that it would be a nice little respect reflecting space if there was just two benches that you could actually sit on. That doesn't even look comfortable. You know,
I see council member Peter and then council member Johnson.
So yeah, that's my very first question I asked was if that's what we're going to get. So yeah, I don't like the color of the wall. Um height I think is not that tall. I mean if if you really look at it but yeah I I would instead of having plaque on the bench if that's the route we decide to go without wall then I would rather have some type of rock formation and put flex there instead of putting it on the bench right
but I do like the idea of bench having couple of benches would be good uh having talked to uh veterans at VFW W and American region they the common theme uh that I heard was someplace where they can go sit and reflect. So that it would be a good idea to have perhaps couple of
Council Member Johnson.
So I am so glad you said that because the first thing that struck me was a a bench without a back. How long are you really going to sit there? And maybe that's because I'm getting older. I don't know. But but a bench with a back you could sit there for some length of time. So I like this idea of maybe just two benches. Put a plaque on the benches or on some kind of ra rock in the middle between the two of them and then you could seat more people and then it would also probably not cost $50,000. So that's another benefit.
Okay.
So can the wall
any other questions or comments.
If you're talking about writing something on the benches, the Breen Ridge benches where it has already you can have, you know, veterans memorial something there which is less maintenance always visible.
Dedicated to the town of Morrisville first responders.
Yeah.
Dedicated to the town of Morsville's first responders. Dedicated to Morsville veterans. Thank you for your service. And people sit on those benches all the time.
Thank you.
So I think one of the one of the obviously of having this conversation tonight is important, but also wanting to make sure that this is along the lines of what you would like to see before we continue to move forward. Um, obviously this is a an item that came as a round table item. So there is no we don't have a designated budget for this memorial within the project budget. So obviously with a cost estimate that we have ballpark $40 to $50,000 does council feel comfortable with something like that so that we can continue to explore this design. Um so definitely want to make sure that we can get some consensus of understanding is there support to continue down this road or not. and I see council member Patel.
So, um, where as it stands now, where would the funds come from?
So, I think, you know, there's a couple of options. Um, you know, one would potentially be the parks reserve. Um, you know, there is there's generally funds available that that would qualify for that. Um, you know, we we have a a a
very very small amount of money. There was a 911 fund that was created shortly after 2001 and it has been in in this account, but it's 2500 $3,000. So, that's just a start of this. So, could be parks reserve. We could also come back to you with some other options on that um as far as what where else we would fund it out of, but in all likelihood out of a reserve.
Yeah. I mean I'll be okay with just coming out of park reserve considering you know we're considering taking out funds from park reserves for the the other things we talking about in terms of cricket fields right how about everyone else do I get thumbs up do I get yeses don't okay seems like we have consensus to move forward Okay. And the last item on the town center that I have for you, I think is exciting. So, I'll invite Amelia to come here with me. Um, as you all know, part of the town center and the retail space, one of the areas that the town will be that we had agreed in the contract is that there will be approximately 4,000 square feet that we will occupy. and we have been evaluating what could be the best use and the best option for those 4,000 square feet. So, we have been working with the economic development department, Tiffany and Amelia to evaluate how will it look like if we use this retail space um which I said is 4,000 and we have the potential to expand that if we if we need more. But what would it look like if we were to explore an opportunity for small business development, entrepreneurship, and innovation within the community by allowing this to be a co-working incubator space opportunity. And I would like to turn it over to Amelia so Amelia can share with us a little bit of the exercise that they have been doing uh
the research they have done exploring what other opportunities are out there that could be beneficial for us to utilize this um recognizing that co-working space and and pouring into our small businesses have been a focus of the town for a little while and there's a lot of the work that Amelia does that is along along those lines. So Amelia tell us a little bit more of the work and the exercise that we have done to research this opportunity and the intent is to be able to hear from you. What is your um your what feedback do you have and how do you think uh this idea sounds to you as we continue to explore the use of that space?
Thank you Jazelle. And uh good evening town council. Um, so Tiffany and I started doing some initial research and just really evaluating the other communities throughout Wake County and the triangle and we've noticed that we have quite a few communities that have co-work co-working spaces. Um, but there are quite a few different models. There's some that are just sort of badge access, some that are open 9 to5. Um, some that are run through the city, some that are run independently. Um so we've been trying to explore what those different models are, what kind of what are the best practices for the industry and what are the infrastructure needs, programming opportunities, what the various management approaches are and um again those potential operating models. So that's kind of like what we have done so far. So, one of the ideas of what we feel will be most beneficial for the town to pursue is out of all of those options that we have looked at because the economic development department is a very small department. We only have two people in that department. Um, it's essentially just explore the opportunity of having an operator, meaning that the town will enter into an agreement with an with an entity that would just operate the space, but they will serve at our at our leisure based on how we
reach the contract with them. This model is effective in a lot of other areas. Um, one of the things that we are hearing is the 4,000 square feet may be a little small for them to make the numbers work given the cost of the of the of the lease, but we have talked with Abby and we're saying and we have definitely the opportunity to be able to expand a little bit more than the 4,000 square feet. Um, what would this look like? This could provide opportunities for individuals that don't have an office and they just want to use it as a a co-working space, an incubator. It can have a meeting space where they are able to have a meeting space. It can also have the this an area where people can come and sell their products. Let's say they they they do some baked goods and they have and they they want to just put it out there to kind of get their business running. So it serves also as an incubator, as an opportunity for small bit of small businesses to be able to explore the opportunities that they have. So that's essentially some of the options that we have right now. Um definitely more to come on that. But before we go too far into continuing to explore this option, we wanted to get a pulse from council and understand how does council feel with this idea. Should we continue down this path? because there's good models out there, but we want to make sure that this is uh in alignment with what you would like to see in that space. So, I have Mayor Patra body, then council member Garamela, Council Member Patel, and then Council Member Johnson.
I love it. I don't think that as a town we necessarily want to be in the renting office space building. So, I agree with your assessment that having a management entity is the way to go, but this is exactly what I was hoping the town center would be, a place where there, you know, there might be a big business
or some type of anchor, but there would also be cool kitchen businesses with, you know, like it sounds like there would almost be like a little market where people could come and sell stuff. And I think that to me is that's the most vibrant and interesting use of the space.
I my only concern would be whether there's enough there's enough demand for the space to fill 5,000 square let's say we settle on 5,000 um to fill 5,000 square feet consistently enough to make it profitable. like where exactly do you foresee the demand coming from?
And I can uh add to that a little bit as well. In our initial discussions, um we've seen that the biggest sort of revenue and what keeps it steady is having some some of those office spaces. So we were envisioning it being sort of a mixeduse space. Um but office spaces would be a part of that. Um and that just allows for them to be there a little bit longer. So, some of those homebased businesses that are right now maybe having to go to Frontier or other communities outside of Morrisville to run their business, maybe it's a service- based business. We would obviously love to keep them here in Morrisville. So, having some of those office spaces would be very helpful for them.
And so, how I know how Frontier works. I've rent a space at Frontier. Yeah. But so when you say running their business out of that space, do you mean like they would rent like a month at a time?
Okay. And so they would put a little office in there and like, you know, plants and the calendar and the whole bit.
Yeah.
Yeah. I can see that. I can see that working really well actually.
Okay.
I believe I have Council Member. I'm I'm trying to envision, you know, what it would look like because I'm hearing different like a
a place where people can come and work. You know, it's pretty much I'll full disclosure, my son doesn't want to study in my house. He likes a Starbucks all the time and that is the trend that these days are, you know, they just like that kind of ambience and so he doesn't pay anything in Starbucks other than the coffee. So it but these guys stay six, seven, eight hours they are working all day. So is there the model that we are planning to do that way because we have the library just down the street they can do there too. Um but are you I'm not understanding the renting model what it how to envision that.
Absolutely. So it's going to depend on who the operator is that ends up coming in there. There's a few different models. Sometimes they have day passes, sometimes they have monthly passes. Um, and it really just depends on, I guess, how we design the space. So, in downtown Raleigh, they have a space that they partner with Wake Tech for that those small businesses that Jazelle was mentioning where you maybe have four in there and that's sort of the storefront and they have products. But then there's also sort of hot desks where people can go there for the day and maybe it's $20 and they can be there all day long. Maybe they go there for specific programming that's happening. I know over in Carrie and what used to be Blush, they would have days where, you know, they would offer a free co-working day just to get people into the space once a month. Um, and then otherwise it's $20 a day. So maybe it's not consistent need for a business, but a few days a month, it makes sense for them to go in there. Especially because Starbucks is wonderful, but sometimes it can get loud and it can get busy. And so, if you need to have some of those those calls that are a little bit more important and you need a quieter space, that's when it would make sense.
Yeah, I like I understand like
Starbucks. So, how many passes are we giving it? And so it should not be like oh our smart shuttle we are trying it it's already full every time you know there's no space for us to go in so then you know the pressure will come on us we have to increase more space so like I'm just you know trying to make sure we are not creating our own problems by giving a day pass like they like uh the parks and racks you know or the MFC see for their yoga or something it goes within five minutes everything gone so I don't want that to turn like this and then we'll start hearing about it
right I think that's a great point is that's definitely some of the things that we want to avoid um there are different models out there right so one of the exercises that um if council was to support this idea tonight is one of the things that we will need to start exploring is we need to start engaging a little bit more with some of the other options are out there and potentially even uh start working on releasing an RFI to be able to seek specific interest from operators in what those models could look like because there are there's a lot of different models out there. Um also keep in mind that um the models may work differently because of what they may have around them and the size of the space. On our case, our space is a it's smaller than what we have seen out there. However, you do have the the benefit of being in the town center when you have so much activity happening around you. You have the library which we hope can provide um a will attract people to want to come there and hopefully it also becomes part of the ecosystem that you can have someone initiate a business within the incubator space and they grow to the
point that they're a able to occupy a cottage in the future. That would be the greatest success story that we can tell out of this is being able to see a business that grows in that fashion. I I hear what you're saying, but I get confused when you cross like a day pass with like the Fenton uh the frontier. So the frontier is a fixed phase for X number of days or months. Are we talking of that or a mix of both? I'm like because the the reason is I understand and that would be nice if someone has a space and you know that works out then don't have this day passes
you know because it has no value because people come in out and we have an operator so what is our obligation are we getting our rent back and the operator will you know um give us the rent because we are just third party you we are subleasing it to them. How does that work? You know,
so are you asking us tonight for general consensus on going forward with the because once we we'll release an RFI and people will come to us with proposals and we can pick the one we like. I think that tonight we're really just trying to decide is this the direction we want to go or does it need to be I don't know what the other options are but Right.
Yeah. Thank you for that. We we are barely scratching the surface, right? is we are we are exploring this option but we are very early into it. We certainly wanted to reach a point where we pause get a pause from council because council wants us to chase this idea and if we have the support of council then we will continue and we will have answers to a lot of those questions. What are some of the models that make the most sense to the town? Um but we necessarily don't know exactly what it may look like. I think there's many options out there,
but we will get those answers later if if if it was to be supported by by the council. I believe I have council member Johnson. Then I have council member Castling.
He was nice.
Patel.
Yeah.
Okay.
Council member Johnson.
Oh, Patel. I apologize. season.
So I I like the idea, but u I have a few questions. Where where is the space that you're talking about within town center?
From the college retail spaces. So if okay like if we if you go across from the look where the library is right there move across north to that side and the in that corner. Yes, that corner right there is where we have the 4,000 square feet. There's all the retail space down there and then above it will be multif family, but it will be that corner of that building where you're going to have a plaza outside as well where with tables where people can also sit out there. Uh, but it will be that corner 4,000 square feet on that corner.
Then it is our space or we'll be leasing it.
We are leasing it. That was part of our agreement with uh it was part of our agreement with Singh and then we in this case if we were to enter an agreement with an operator we will be subleasasing.
Okay. So if we don't do this then we'll be subleasing to some business pretty much.
If we don't use it then Sing will probably try to find somebody else if we elected not to use it at all. But if they can't find somebody, we are committed
to the 4,000 square feet. It was part of the early on proforma that was developed for this project particularly again reminder that it's a public private partnership. And so sometimes it's
difficult. There's there's real limitations on what a municipality can invest into a public private partnership. So this is one of the ways that we could do that. Again, at the time, one of the thoughts was that this could be parks and recck admin space. Of course, we had no idea at that time that we'd be able to purchase the chamber building and put parks admin in there. So, that's led us to this. How do we look at the space differently and what could we do there?
Okay. So, I was I want to ask them what was the original vision. I guess that was okay.
Yep.
So, yeah, I mean, I like the idea, but I would like to see more details before I go further into it.
I believe now I have council member Johnson. So, the history of this is important. Um, we entered into this agreement to to lease this 4,000 square ft as an incentive to help them as they were starting to lease up the properties. I'd like to know what the agreement says because I don't know that we ever entertained this being a long-term commitment to lease it. It was just initially to help them when they were coming up out of the ground. And I'm not sure we were committed if they found somebody else. And so I'd like to know what the details were because I don't remember did we have a time frame? Did we say we're going to do it for a year? Did we say because in my mind it was not a long-term commitment. So I'm not interested in leasing this space for any longtime commitment to anybody.
Okay.
So I if you could get me that.
Yeah, we'll come back with some details on that.
Um I also don't understand I'm not interested also in some long-term financial commitment on our part. I was willing to lease the space to help them in the beginning. Um I'm not interested in any more money beyond that. So, I'm I'm I'm not hearing that this is of no cost
to us, what you're proposing. I'd like to know an options that that is a no cost to us um to the town of Morrisville because that was our commitment was at that time um or our thought process rather at that time was that we needed more office space
and now we don't. If I may. So what we are proposing here is something that may end up being long-term because otherwise you'll be taking something away from people later on.
Correct. That's why I'm not really in favor of going down this road because you go make this commitment. This sounds like a long-term commitment to me and I'm not sure that's the business we should be in as a as a
How does it matter? Just hypothetically if If you're subleasing, they are paying the rent. We don't even care how much.
I'm not hearing that. I'm not hearing this is a no cost to us.
Just deflect it to them and let them handle it.
We are paying for that. I'm telling you in the end there's going to be another financial commitment beyond the lease and I am not interested in that. I need to hear some more options. Sure. This is not the option that I think I'm going to favor. you need to bring me some more options or there's an option of not leasing the space if Sing can lease it on their own. I'd like to go down that road, too. I want to make sure, you know, we talked about the this being a vibrant downtown where people could come and eat and drink and um buy things. said, "I would rather see that in this area, an incubator and a co-working space can go in some other location. I want this needs to be for the community to come and participate and buy and um as important as co-working space and um incubators are, they can go in all kinds of places like Frontier is in an office.
it's it's in an office building. I mean, we have other space that we're not using that we could turn into an incubator if that's really the business we want to be in. So, um that's just my two cents right now.
Thank you.
I believe I have Council Member Kesling and then Council Member Scott Johnson.
I'd like to throw out the idea of a tool library. Um I'm just pulling up the Wikipedia page here. Um, but a tool library is an example of a library of things. Tool libraries allow patrons to check out or borrow tools, equipment, how-to, instructional materials functioning either as a rental shop with a charge for borrowing the tools or more commonly free of charge as a form of community sharing. This can empower residents who cannot afford specialized equipment for temporary projects to extend the life of their belongings, saving money and contribute to a more circular economy. Circular economy being a more sustainable type of economy. We have rules for that.
Yeah. This is a free library.
But then again, you're talking long-term commitment here, right?
Yeah. Um, another idea that I want to throw out related to this is if there um uh if there's a subsection of the community that would want to um take on the uh the management of this um they they viewed it as a um you know a benefit to the town and u you know established an organization that was um you know in charge of of funding that. Um, I think that's a, you know, it's a hypothetical way to move it towards, um, uh, you know, long-term ownership of a community, um, community entity that could that could carry into the future.
Thank you, council member Scotty
Johnson. So I was part of the discussions during the um incubation of the um private public partnership and the 4,000 square foot space Nick was um like a jump start to activating the space. But there was one thing that you didn't mention that I think kind of resonated with me is that we were hoping that marbles would um take tenency in the town center and that would activate you know kids of all ages I like to think marbles um but they are not going with that model they're doing other forms of marvel extension with that in mind although spark is not going to be hosting a touchdown in office and stuff like that I think we should reimagine what we want to have as v vibr vibrant. We can put hoteling and and small business areas anywhere in town where it's, you know, like perimeter park or something like that. But downtown, I want to activate the space for the community and that includes more classrooms for arts, more classrooms for training. Um, we have Cedarport Community Center that has those classrooms and the daycare and stuff, but if we had more, we would have more opportunity to expand the parks programming where we need to have programming. We could use multi-use um kind of a format for the inside. And then we could flex to have seminars and talks and and so forth like that because it does get hot in North Carolina. you don't always want to use the lovely amphitheater. If we had small group settings where we um had some
programming inside um outside the town center, I think that's the kind of public use and activation that would be different and novel that the town would be more aligned with as opposed to starting up and becoming a small business incubator. That's more like the chamber would be more aligned with that kind of activity. and um maybe some other business entities we could partner with at other locations. Also, I want to do a time check because I love this topic, but I mean I looked at the next topic and it has like 40ome slides and we have two closed sessions. So, I don't know if we can time box some things because I'm speaking your language now. Um, mayor prom. So, um, we we just want to make sure that we answer your questions, but we also be mindful of maybe we push the personnel policy. That's not a critical thing that has to be done tonight so that their closed sessions could start earlier. And that that's my um just to summarize um small business not so much community focused activities community center kind of activities I would be all over that.
Thank you. Actually just follow up. I think I like in one aspect is we need people coming into the downtown and you continuously need change of people uh to flourish the small you know industries and the cottages and all these things by doing something like that every hour there's new fresh people coming in they'll buy something do something. If we have incubator, it's just four people sitting there and no foot traffic. So something like that also. Mr.
I believe I have Mayor Patraati and then
council member Patel.
Just really quick, I would I would see a co-working space as an amenity. So I think that that that it's a really important space. It's not something we have now. And I mean, just the times that I've been at Frontier, there's people going in and out of Frontier all day long. And I think that it would bring a different clientele than the ones that we're going to get. Like, so we'll get, you know, young families because of the parks and the big green, and we'll get students because of the Instagram spaces and the big green. And you know if we're also bringing in small businesses, entrepreneurs, single cursors, whatever they call those, um I think that's another another demographic that we might currently not be capturing. And I think that I mean I don't I'm not married to the idea of us doing it, but I think that Sing should definitely look into a tenant like that. Um and The only thing about the classes and the expansion of parks and wreck is that that's a long-term commitment because you can't and we would be paying that lease. So, you can't start 5,000 square feet of amazing classes and then quit them after a year. Like, we're once we do that, we're committed. We're in that space and we're staying there. So, I'm not opposed to that. But I do think that, you know, we need to balance what we're going to end up paying versus what someone else ends up paying.
Council,
so in our agreement, how much is the rent for this property?
So the lease, and again, the lease is 36 months is what we committed to. So a three-year lease to be in that space. We
should anticipate roughly uh 4,000 square feet at about $160,000 about $40 a square foot.
So that's $160,000 a month that we have to
a year. Yes. The long-term commitment maybe unless we see some kind of
unless the other piece,
right?
Council member Kesley.
Uh I don't like that it's expensive. Um but uh if cost was not an issue, um I think a small grocery store would be good. Um you know, you could go and get tomatoes, onions, that sort of stuff. Especially for all the folks that are living there, where are they going to get groceries? They're going to have to drive there. Um if you can just come home and go downstairs and grab um there's a couple things that you need to make dinner. Um that's one less car trip on the road. Um, also the library that we have um doesn't have an adequate meeting space um when it closed at least. Um, so I don't know if we could have a conversation with Wake County. um I don't know what their um appetite is for leasing spaces, but um certainly uh if we agree that that's a need that we think we have with our library um if that space is essentially an extension of um the library um and it would offer uh you know meeting spaces and whatnot for um you know small groups or um larger groups like some of the other um larger libraries have. Mayor Collie,
I would just share that the frontier and boxyard work well together as our town center will with this economic development incubator. I mean, it's it's a good fit. Um, like the tool library idea. I knew you're going to go to food and co-op downtown. I think that's an important thing to think about. Tool library, you'd have extra room at public works, so that might be something to just explore as an aside. Um, we have some thousands of feet there. So, that
might be something to set up a little tool library. Um, I think this would be the best use of the space other than I always thought that'd be good to have a teen center. Um, but I think that having some kind of incubator in Morrisville, it would really fill the gap if we're innovative. Supporting innovators is going to be really important for us. So, thank you for bringing this forward.
Okay, so just doing a quick check. Uh, does it seem like we have support to explore this any further? Can I get thumbs up so I can see if I have consensus? I have two.
What are we exploring? I don't understand what your question is.
Just get bringing more information into if this was a an incubator space or
what about the other suggestions
or well I think we can get um consensus on those options presented, right? I think you brought up the option of it being a extension of parks and recre classes of that nature. We have the incubator space. Council member casting brought up some general ideas. I guess my question to council is what would you like for us to explore from a consensus standpoint? What would you like for us to explore?
I got comment but I
I would like to explore more options. right now what I heard today uh I mean if if we are concerned about long long-term commitment then there is nothing that we discuss here today doesn't pull us into long-term commitment and if we are okay with long-term commitment then we as a council need to decide that first before asking staff for exploring the options
I would agree with that I also think this is way premature um if sing can rent the space. They need to rent the space that that you know this was an this was on our as I recall and you all you you that were here you can weigh in. This was to help them in case they could
not rent this space that we that we would rent this space but they have the option of taking this 4,000 square feet and renting it on their own. I would much rather see that. This was an effort like I said just to help them kickstart everything and we don't even know where that is yet. So I would this is too premature for me and we need to explore more options.
I believe I have mayor of the timber body.
Um just really quick. So agree this is this to me is premature. But the thing is we also can't wait until a couple months before the opening of town center because there's going to whatever we do with the 4,000 square feet there's going to be some type of there's always some type of design work and then there's you know like everything takes so long. So I would think I don't need to decide it now but I think by January we ought to have some kind of plan and some kind of projection from Singh about whether we're going to get this space and how much it is and once we have that then we can talk about what we want to do with it. That would be kind of the path I would follow. I'd like to hear more options too. I mean, you know, let's I don't I don't think maybe dig much deeper into the co-working option. It doesn't seem to have general support the way I read the room. So, maybe rather than digging into that, maybe coming up with a couple of other options and then we'll lay them all out on the table and see what we like once we have more information from S.
Yeah. And to your to your point that that is correct. The reason why we are bringing it up is because we are at the point where we need to define what the design will look like for that space. I believe I have Mayor Collie first and then I'm not sure which of the two went up first. Okay.
Council member Johnson and then uh Council Member Patel. Mayor,
so yes. And this is our park. This is our town center. And if we don't have this space to have bodies, we don't have anything in town center. So I I think this is important. This isn't a burden. This is a positive to have a presence for our town in the town center. So I want this 4,000 square feet. I don't want to sing, right? I I'd like us to be there. And I think having an innovation space in that space is brilliant. So, don't forget we do have a presence. We have a beautiful town green with a um that's going to have a gorgeous stage that we're going to be able to have events. So, we have a very significant presence in the town center, the town of Morsville does. Um so, Ann said something really important. I I think she's right. We do need to you can't wait till the last minute. I totally agree with that. But this building isn't even coming up out of the ground yet. So, so this is way premature. When I start seeing that building come out out of the ground, maybe that's the time to kind of talk about this. It is we still have lots of time and I don't know what that time frame is for that building, but um that would be important to know too.
Council,
so I think Brandon, you say it's 36 months. That's what our commitment is was 36 months.
That's correct. That's what our commitment
a month, right?
Oh,
160 a year
based on about $40 a square foot, which is give or take market right now.
And if we use use it for something that doesn't generate the revenue or pay for itself, where would these funds come from?
You would have to budget for that.
Okay. Thank you.
I think I have council member Kesley.
Um this will be a a shell space. Um or at least in the design it's um basically just a shell.
It's a shell will be responsible for the outfit.
Yep. Um how big is this room?
4,000 square feet.
So this room is 4,000 council council room. this room. I'm not sure.
Sorry.
It's not 4,000.
Yep. 4,000 is a pretty good space.
Yeah. Trying to get a sense of scale of of how big the space is. I think it would be worth having um I mean that you already have the shell, the the drawings for that. Um it'd be nice to uh have that. And then some of the ideas that were um thrown out here uh like the incubator incubator um co-working um you know it's just a baseline um uh maybe the more um community center um vibe u that I think I I heard as well um you know the details of that whether it's an extension of Wake County um Wake County Library having a conversation with them. I mean, I guess that's only my thing that I brought up if there's support for that of investigating whether Wake County would be interested in that. Um, and I know that, you know, I'd be interested in the tool library, I'd be interested in, you know, grocery store, that sort of stuff. But obviously
there's no if there's no support for um investigating those then obviously
I just want to share we had the opportunity to have um municipal space in our in the library but we chose not to because they were charging us a certain number of dollar per square feet. So
that council vote is against it but not every council member
right. So, I'm just saying I don't know. I like the idea of partnering with them, but they would say you had the chance to do it within the library. Why would they pay to do it somewhere else?
Nothing wrong with asking.
Okay. So, if I I'm hearing that we would like to see more options and see what those options may look like. Um, and then we can come back with that and also the conversation as to whether uh Singh is able to to rent this space without us having to look for some other options. Anything else that I miss?
Um, what are the restrictions on the space? Um, like could it be a restaurant? I would pro I guess not because you need grease trap for the restaurant. Grease strap is probably not included in the design of this space.
Also, you don't need 4,000 ft for restaurant.
Sure. Um,
no, actually all of them will be having all those because no one knows what it is and it just saying go and start filling it out. So based on what is needed I just know for a restaurant you need to have the grease trap and that's pretty significant thing to have. Um and if you don't have that you don't you can't put a restaurant in there unless unless you wanted to do the work outside put the grease trap in. Um so
we can find those details.
Yeah. What are the restrictions on the use of the space? Certainly.
Okay. It's also, I think, important to keep in mind that if there's a retail possibility, we want that to go through Singh. We don't want or have any desire or need to be in the retail business. So, you know, if there's interest in a grocery store, that would be something that Sing, you know, I'm sure is evaluating. Now, I've had some conversations with Obby. They're having good interest. Now, that doesn't necessarily translate to commitments, but he's got a couple commitments. Um, and he's working on others. So, I'll circle back with him on where he thinks he is with this space. Um and that will certainly be a factor in this as well.
Well, thank you for uh your input and your feedback on this uh great information. The one last thing that we have related to this that um Amelia has prepared for you is the handouts that you have in front of you. Um, I know there have been a few questions here and there related to the small business
support that we provide and Amelia has provided those handouts for you to be able to have some information on the information that she shares with small businesses when she does her visit. Um, recognizing our time right now, Amelia, any any particular highlights you just want to mention real quick? Um just so the very first page that you guys have that's really all of the highlights. Um this is from January of this year to October. Anything prior would be on the annual report. Um but we've done about 250 engagement touch points so far. And then the second handout is a more detailed overview. It's about three pages. So I won't get into all of that. I'll let you read through that your own time. side. The very last handout is something that I designed and I give out to the businesses during my small business visits. On the back side, there's doing business with the town of Morrisville, which I partnered with Karen Bats and finance to go over some of the procurement opportunities with the town. And then on the other side is a little bit about small business support, encouraging them to sign up for our newsletter. That's another one of the things. Um, just since January, we've had 50 new subscribers on our small business newsletter and we're very active on LinkedIn and we have a small business directory. The next event that I have is actually tomorrow. Um, and that is going to be with the West Kerry Business Alliance, which the Morrisville High School also partners with them, and that's for students interested in having either an internship with some of the businesses, job shadowing, maybe project based learning. And so one of the career development coordinators is going to come on. I think you know him Rob. He's going to be on the call tomorrow just sharing a little bit about what the West Cary business alliance does. So that will be tomorrow. And that particular event is actually as a result of one of the round table items as well that was presented. So I think um Mayor Presati had brought that up that round table. So
that's the continuation of that work. Any questions on any of that? I know there's probably
Okay. a lot of good information here. Um, and a lot of this information is also shared in the newsletter that is, uh, sent out. So, a lot of great work happening. Uh, but thank you for your input, Council Member
Cesley. Soft copy.
Yeah, we can certainly send that out.
Um, so I just had a question about our um, small business Saturday event that will be taking place on Wednesday. Um is there a change of the name of that that is needed?
Um it's not a small business Saturday event. Is our second annual small business resource fair. So we did it for the very first time last year. The real purpose of it is to connect resource providers in the community with our small businesses. Um but at that event it will be the the small business Saturday proclamation will be read there just to respect everyone's time and have it in front of all the business owners. that was the best place.
Okay. Well, thank you. Appreciate the time.
Thank you.
So, the the next item would be the finance and personnel policy review. To council member Scrogggins, Johnson's question is this is another effort at transparency. Um, this is not addressing any problems. This is not that. This is again, you know, probably most of this, but it's an opportunity to give you uh ask any questions you may have, but it's really also about providing this information to the community. Again, um the intention was not to read through all those slides, but to hit highlights and answer questions, but if you would prefer to table that for now and move into close session, we could certainly bring that back after the first of the year.
Can you make it 10 minutes? I I don't think it's 10 minutes.
I have a whole list of questions.
Okay. Just checking.
I was just asking.
This is not reschedu because I know a lot of questions would take at least an hour or more.
Yeah. So, we'll we'll reschedule it, but it'll have to be after the first of the year. Your your calendars are way full right now.
That's my only appointment in December.
Yeah. So, if you do have questions you'd like to share in advance to make sure that you know we're prepared to answer those, that would be fantastic. It doesn't have to be tomorrow. Take a chance to look through it if you haven't had the opportunity. Again, it'll it'll be January before we can bring it back and happy to bring back more answers with it.
I appreciate that. Of course, council member Kess um if someone uh um you know entity or whatnot organization um ends up um you know looking uh asking us about you know our our our financial stuff and all that kind of stuff. Is the presentation a point or at least the information we shared that you know we're doing well going to have a discussion about it. We're going to have a discussion, you know, at this date or in, you know, soon.
Yeah. And we'll we'll bring it back as soon as it's practical after the first of the year.
But I guess telling anybody that comes um you know, asking about what we're doing, just letting them know that we're having that conversation.
Correct.
Is that regarding the policies or is regarding finance? I'm confused. um the discussion that uh we were going to have on
so it's my understanding that we have policies about how our finances are managed about how our staff is compensated about the risk mitigation that we've been doing related to pecards and other financial tools I have many questions about current and
potential changes. And if you wanted I know I've talked to a couple of you. I did not talk to you before the meeting. I apologize. But I have many questions that could lead to some discussion about policy. So the public has the presentation. They can ask us or staff questions about that. We can also submit questions to staff so that we can have a more robust discussion because I really would like to dig in and this could be a multi-hour discussion. I'm just trying to be sensitive to time
and comparison from these policies already exist
you know like discussion would be as if we are not ready with it but these policy are there as of now and we're trying to tighten it more so if any areas that they can do so but it's it's not like a discussion you're starting to have a policy it's already existing most of I guess if someone's asking us for you know what are you doing about you know this that and the other can this can the presentation be shared with them and say that
yes it's in the agenda package
we're going to have we're going to have the conversation next year
correct
okay thank you
okay so we're moving away from that so we'll postpone that um
to make a motion to the Okay. Um I did change a motion to move that second work session item which was town governance policy review to sometime a future meeting probably after January 1st.
I'd like to make a motion that we move the
government
town governance policy discussion to uh sometime in January.
Second.
All those in favor please say I. I
I any opposed hearing? None that carries unanimously. 70. Thank you very much for preparing everything.
Uh we will get our questions to you in advance as much as possible to make it a little bit easier and we are al always welcome to discuss amongst ourselves. So thank you for starting to do that already. Uh anything for the good of the order sir before we go into close session. Okay. We have two close sessions this evening. One to discuss personnel matter. Oh, one to discuss personnel matter and one for attorney client privilege. Um, this is, I believe, the end of our public business. Um, so thank you very much for watching this meeting with Morrisville Town Council. Is there a motion? Can we put the Do we have both of them up there?
I'd like to make a motion that we enter close session pursuant to NCGS143-318.11.A3 and 6 to protect attorney client privilege and to discuss a personnel matter.
Second motion from Mayor Pat, a second council member Patel. All those in favor of going to close session for those two items, please say I. I. Any opposed? Hearing none, that carries unanimously. It is 9:20. We are now in close session. Thank you very much.
Speaking at this meeting
Town of Morrisville's own rules for public comment — check them before you rely on anything here.
Jump to an item (21 on this agenda)
- 1Call to Order
- 2Recognition of Sergeant at Arms
- 3Invocation
- 4Pledge of Allegiance
- 5Adoption of Regular Agenda
- 6.aApproval of September Council Minutes
- 6.bFall Advisory Committee Appointments
- 6.cPlat Review Officer Appointments
- 6.dStormwater Runoff 5K Fee Schedule Amendment
- 6.eResolution Authorizing the Surplus of a 2006 KME Predator Fire Truck
- 6.fResolution Adopting the 2027 Town Council Meeting Schedule
- 7Items Pulled from Consent
- 8Morrisville Speaks: Public Comment
- 9.aCouncil Expenditures Quarterly Report
- 10.aResolution and CPOA Authorizing Phase 2 of the Design-Build Delivery…
- 11Future Meetings, Events and Resident Involvement Opportunities
- 12Council and Manager Comments
- 13.aTown Center Updates
- 13.bFinance & Personnel Policy Review
- 14.aClosed Session Pursuant to NCGS 143-318.11(a)(6) to Discuss a Personn…
- 15Adjournment
Agenda items (21)
-
1 Call to OrderProcedural
-
2 Recognition of Sergeant at ArmsProcedural
-
3 InvocationProcedural
-
4 Pledge of AllegianceProcedural
-
5 Adoption of Regular AgendaProcedural
-
6.a Approval of September Council MinutesMinutes approvalDraft minutes of the September 8, 10 and 22 meetings.Approved on consent, 7-0
-
6.b Fall Advisory Committee AppointmentsAppointment Appointments and personnelArts and public artParks and recreationPolice and public safetyAppoints Maharajan Shunmugam to the parks, recreation and cultural resources committee, Saran Sundaram to the public safety committee, and Patricia Cedzidlo, Antoinette (Toni) Dinsdale and Samantha Warren to the senior committee, chosen by council ballot.Approved on consent, 7-0
-
6.c Plat Review Officer AppointmentsAppointmentTwo resolutions recommending town staff to Wake and Durham counties for appointment as plat review officers.Approved on consent, 7-0
-
7 Items Pulled from ConsentProcedural
-
8 Morrisville Speaks: Public CommentProcedural
-
9.a Council Expenditures Quarterly ReportStaff or committee report Ethics and transparency
-
10.a Resolution and CPOA Authorizing Phase 2 of the Design-Build Delivery for Church Street Park Field Reconstruction ProjectWould let the town manager sign a construction contract with Blum Construction for up to $4 million to rebuild the cricket field with six pitches and an underdrain, and move $1 million from the Parks Capital Reserve Fund to cover the overrun. Held over from October 13; staff make no recommendation and offer approval, a one-year deferral or cancellation.Resolution and capital project ordinance amendment approved, both unanimous
-
11 Future Meetings, Events and Resident Involvement OpportunitiesProcedural
-
12 Council and Manager CommentsProcedural
-
13.a Town Center UpdatesStaff update the council on Town Center construction progress, upcoming road closures and a Veterans and First Responder recognition.
-
13.b Finance & Personnel Policy ReviewStaff walk through the town's financial and personnel policies on fiscal controls, which the memo says was prompted by State Auditor investigations and findings in other Wake County municipalities.Postponed to January
-
14.a Closed Session Pursuant to NCGS 143-318.11(a)(6) to Discuss a Personnel MatterClosed session
-
15 AdjournmentProcedural
Agenda changes
What moved between published versions of this agenda. Item numbers shift constantly as things are inserted, so only genuine additions and removals are listed.
-
36 days ago
- Agenda document posted.
Other recent meetings of this board
-
Tue, Nov 24time not posted20 items
-
Tue, Dec 8time not posted0 items
-
Tue, Nov 106:00 pm22 items
-
Thu, Oct 156:00 pm4 items
-
Tue, Oct 136:00 pm25 items