Planning Board Regular
Town of Pittsboro ·
6. Planning Board (PB)
Monday, November 16, 2026 at 6:00 pm
Agenda document Watch Meeting recap
What was decided
- Approved 6.IMinutes: October 19, 2026 Approved by voice vote
- Continued 8.IRequest: ZTA-2026-11 Conservation Subdivision Tabled to the December meeting by voice vote
Read from the agenda's recorded outcomes. Where the board published minutes, those are the record — this is a pointer to them.
What's on this agenda
Staff are asking the Planning Board to recommend denial of Eco Northwood MUPD LLC's request to amend the 93.42-acre Northwood mixed-use development on Highway 15-501. The changes would drop the plan's promise of mixed-use buildings, allow indoor self-storage on Lots 10 to 14, and add a right-in/right-out driveway onto 15-501 for Lot 18. Staff call self-storage an industrial use and cite safety concerns on a 55-mph stretch near the US 64 interchange.
The board also takes up ZTA-2026-11, a staff rewrite of the town's conservation subdivision rules, which staff recommend approving. It would require at least 50% of a site to stay as undisturbed Conservation Area, cap built-upon area at 25%, and let staff approve these subdivisions without going to the boards. Both votes are recommendations to the Board of Commissioners.
Summarized from the published agenda. Read the agenda itself before acting on it.
Meeting recap
What happened, drawn from the records published after the meeting. Recording
The Planning Board recommended denial of the Northwood MUPD amendment, siding with staff against the applicant. Staff called indoor self-storage an industrial use that the plan's commercial zoning does not allow, and questioned the safety of a right-out driveway onto 15-501 near the US 64 interchange. The applicant's attorney and traffic engineer said NCDOT had agreed to approve the driveway, that their analysis showed no safety or traffic problem, and that self-storage would sit behind the grocery store, out of view. The attorney said denying the case on safety grounds without contrary expert analysis would be arbitrary. Members still spoke against the storage use and the right-out turn. This account comes from the meeting's recording.
The board put off ZTA-2026-11, the conservation subdivision rewrite, to its December meeting. One member, who said she is the only one representing the extraterritorial jurisdiction, opposed the draft's density incentives as too generous for rural land there. She also asked for required community meetings, enforcement penalties and clearer definitions. Others asked for wording changes, and staff offered a work session. At public comment a Chatham Chamber of Commerce representative backed the idea but said builders find some of the draft's lot standards unworkable.
How the votes went
All four votes were voice votes with no roll call, and no member was heard opposing any of them. The board excused a member's absence from the October meeting and approved the October 19 minutes. It tabled ZTA-2026-11 to its December meeting. It recommended denial of the Northwood MUPD rezoning, PB-26-439, which the chair called unanimous.
Who spoke
1 member of the public spoke.
- A Chatham Chamber of Commerce representative supported conservation subdivisions but asked the board to weigh local builders' view that the draft's dimensional standards will not work on real sites. 0:11:55
Read from the recording's automatic captions, which misrender names and numbers — "Kildaire" comes through as "kill dare". Treat a name or a figure here as a pointer to the video, not as the record. Members of the public are private residents and are not named or indexed.
Full transcript
Automatic captions from the recording, "November 16th, 2026 - Planning Board Regular Meeting". Runs 1 hr 35 min. These are machine transcriptions, not a court record. They misrender names and figures — "Kildaire" comes through as "kill dare", and case numbers arrive as noise. Each timestamp opens the video at that moment, which is how a passage here gets checked against what was said.
Read the transcript (45 passages)
It was like after like 7:00 7:30 when I got back. [clears throat] It was a ride on the bus. I didn't have to wait for parents because I can't leave children parents don't know how to get
No, that makes sense.
Parents don't know how to get back on time.
I believe that. I absolutely believe that.
I would like to make a motion to designate Alfred Alston's absence from the October 19th, 2026 meeting as excused.
All right, second.
I'm a second by Mr. Wilson. Uh all in favor say aye.
Aye.
Aye. Uh any opposed?
Thank you guys.
All right. All right. Um on to the department updates. Um Ms. Armstrong, I assume in in uh Kevin's absence you'll be bringing those to us.
Yes, sir.
Good evening, board. Um Armstrong, Development Services Director. And I'm going to give you some updates of the items that are upcoming. So the UDO RFQs were completed on 11/13 and we had 10 submittals. Um you will have the ability to reach out to um Director Lewis as he will be heading up the RFQ selection process. And one of you have the ability to assist with that for the selection and eventually the steering committee that will come afterwards for the UDO update.
Can you say that again? You said one of us can volunteer to participate?
Yes, you may contact um Director Lewis directly. You can send him an email and say that you're interested in it and he will select. If you're if there is a firm that you're a part of, you cannot participate during the selection, but only during the steering, which will you will be allowed during the steering, but not the selection. Um in addition, uh Matt Barcelos started um as of today. It's his first day as the planner one. The stormwater fund started as well and that is currently under the way. Um we are starting the Creek Week planning for next year led by Liz as well.
And there are new stormwater incentives and education that will be certainly published on the watershed section of the site. So for the next few months you'll see lots of different educational items and incentives for the community. And the transportation bypass study is underway. It just kicked off and there's a potential for preliminary alignment early next year. So that will be something that will be coming forward as well. And then we also have a transportation engineer posted as of last week as well. And that is current all the updates.
Thank you. We will move on to the minutes from our October meeting. Is there any discussion anybody would like to have over those? If not, I'll take a motion.
I make a motion we approve the minutes.
Motion by Frida, second by Christina. All in favor say aye.
Aye.
The minutes approved. And we will move on. We do have one individual signed up for public comment. Before we start that, I just like to state please state your name and address at the start of the comments. There is a time limit of 3 minutes which will be displayed on the screen. In the interest of time and fairness, it is the board's policy not to respond directly to comments during this period. Staff will follow up as appropriate. Any speaker with handouts shall be given to the town clerk and will be distributed to the board at the conclusion of this meeting. We have Rebecca Dickinson. Good evening.
Good evening.
My name is Rebecca Dickinson. I'm with the Chatham Chamber of Commerce and our office is located in Pittsboro on Music Boulevard. And I'm here to speak tonight quickly about the conservation subdivision text amendment as proposed. The [clears throat] Chamber of Commerce has 450 active members in the chamber and we have a board of directors as a nonprofit organization and a government affairs committee. So my comments here have been through the government affairs committee and the board of directors and our representative of our members of the chamber. The chamber supports the idea behind conservation subdivisions. Our public policy framework calls for protecting natural assets and open space as a central community infrastructure. And it also calls for more housing supply, a variety of housing and affordability so working families can afford to live here. A conservation subdivision can do both of those things at once. Group homes together on part of a property and keep the rest open for permanent space. Our policy framework also calls for regulatory climate that is pragmatic, fair, and consistent. And we're not sure the current draft passes this pragmatic test as it's written tonight. Conservation subdivision is a voluntary option. No landowner has to use it. A property owner will choose it only if it works at least as well as a traditional subdivision. If it doesn't, they will build the conventional way and Pittsburgh gets neither the open space nor the housing diversity this ordinance is meant to deliver. We appreciate that the staff, the town staff has restored administrative review in this latest draft that's being presented. And that's a meaningful step. But experienced local builders have told the town that key dimensional standards in this ordinance will not work on real sites. They are the people who will actually use this tool and we ask that
you give their concerns strong consideration. Getting those details right is essential to making this great new development option viable for the town. Thank you.
Thank you.
you.
All All We will move to our action items. Item 8.1 ZTA 2026-11 Conservation Subdivision.
Good evening, board.
Good evening.
We're here My name's Liz, Liz Pignoni, and I'm with Matt Armstrong, and we're going to just briefly talk through a text amendment that you've already seen in July, brought to you as a discussion item. Since then, we put it on the town website for public comment, and we held one public meeting for people to come in and give feedback. And so, taking that feedback and also working with multiple staff and legal review, we present the newest and most recent revised amendment. So I figured we could kind of just go through this line by line, kind of like what we did the first time, and then questions, if you have them, we are open to answering those. I'll start with a little bit of background. There We have an original amendment that we won't be able to take away any any rights that we were given in the existing language. So we have a baseline that we had to stick with. Oh, perfect. Thank you.
Okay, cool. So the tables in the start of the amendment are kind of untouched since you last saw them. This is really just a minor cleanup. So the two that was super text was removed because there was no two that it was referenced in the table. And and also cleanup is rid of the reference to conservation conservation subdivision standards. Conservation subdivision subdivision standards are allowed in all zoning districts, but they were only included in the rural agricultural districts. And so to make it consistent, we took them out of these three districts. The tables. They're still included in the later text. Um we also cleaned up a little bit of the watershed critical overlay district. So this is just going to reference the most recent NCDHE watershed rules, which restrict built-upon area to 24% and that's a that's a hard line. We're not going to allow above that. As well as kind of cleaning up you see the three is struck through. This was old language that just needed to be updated. And so we updated most of what we could to reference the design manual, the stormwater design manual that's regulated at the state. And then getting into the meat of it. So the purpose kind of stayed the same since last time you've seen it. This is an alternative alternative subdivision design that's meant to be voluntary for any developer that would like to build in the rural districts and still conserve a little bit of land because that is a major point of our future land use plan is creating these environmentally sensitive subdivisions. And so a lot of the purpose is just to conserve open land as much as possible to encourage maintenance and enhancement of wildlife habitats and corridors and minimize land disturbance as well as protect that scenic view that is in a
lot of our UTJ. And the applicability the black text is something that's already allowed within the existing language. And like the public comment said, we did move that to administrative review. So preliminary plats won't be coming to the board for approval. All right. then we get to the percentage breakdown, and this is a little bit different than what was originally proposed. So, we kind of tried to break it down into something that mirrored the NC State sub conservation subdivision handbook. So, the base conservation subdivision for the town of Pittsboro is going to have 50% open space or conservation area, and then it's going to have 25% built-upon area, and then that remaining 25% is going to be transition area. And this is really going to be flex space for developers if they want to conserve more area or if they want to use some incentives that I'll explain later on to get more built-upon area. But this transition area is is kind of meant to be flexible and meant to allow a little bit more flexibility in design for developers that are pursuing conservation subdivisions. The conservation area is going to be primarily undisturbed, so you cannot touch it. You're meant to conserve it, and if you end up touching a portion of it, you're going to have to take out of that transition area and devote it again to conservation area with the caveat that 10% of that 50% Sorry, I'm throwing a lot of percents at you. Is restored conservation area, so you can disturb it during construction, but you have to replant it with native species before people move in, essentially. We also added a precursor step. If you a developer decides to do a conservation
subdivision, basically saying that when you have a pre-submittal meeting with the town, you're going to provide an existing conditions map that shows that you surveyed the area and a proposed development map showing where you would initially conserve your area and where your built-upon area is going to be. This is consistent with the conservation subdivision handbook, and it also just mirrors some other language from other municipalities that we saw like Durham, um Orange County and others. And then kind of at the bottom [clears throat] of the screen right now is the development standards which is the the meat of the flexibility for developers. Um the density is going to not be allowed to exceed four dwelling units per acre. It it's in red text right now. Later on it'll be in black text struck through. This is original text language right now as the conservation subdivision exists. Their developers are not allowed to exceed four dwelling units per acre. Um so we kept that where the minimum 50% of the site has been dedicated to conservation area. All right. And then getting into the dimensional standards this is new language right as the language exists right now in the ordinance. It doesn't allow for a lot of flexibility in the dimensional standards. And so we proposed a minimum lot area of 4,000 sq ft, minimum lot width of 40 ft, and minimum setbacks of 5 ft unless your driveway is connected to that side of the property and that's 20 ft. So wherever your driveway hits the road you've got to have a 20 ft setback. Um so
Sorry. How does how does that 40 ft minimum differ from if you did not decide to use a conservation?
Yeah. That I think it's like different for the RA5 to the RA but
Right. That makes sense.
Some lot widths are 150 and then some are 75. So it is a reduction. Yes. Yeah. And that's just so they can cluster homes a little bit more.
sense.
All right. And then getting into the built-upon area adding in that reference language to reference the the watershed critical overlay district to make sure that even if you're in that district, you're not exceeding 24% and then adding in some additional standards, um some references to low impact development design standards, um as well as making sure that your um on street parking is limited to one side because you're going to have these smaller lot sizes and so we want to make sure that parking is allowed and um provided and safe. Um and then as well creating some sidewalk standards that can be used for conservation subdivisions specifically. And then um a lot of the next is breaking down the management of conservation area because it's incredibly important for um people that pursue conservation subdivisions. The meat of it should be about the conservation area that you're protecting and and making sure that it's protected in perpetuity, um not just when you develop. And so um it goes through again the minimum is the 50% of the total project site. It's permanently protected from development in accordance with the subsections under that and uh we added in some language that references uh timber cutting which is in section 5.8 of the UDO. Um we added in a I can't say that word. I'm so sorry. Contiguity um standards. So 75% of the designated conservation area is going to be contiguous. Um this is just to make sure that we're allowing for um bigger swaths of conservation area and you're not
able to like place them in points that wildlife couldn't make it in your development. Um so this is just to create greater connectivity between your conservation area on site. Um and then the priority or area or order for designation of conservation area, this is uh areas that are important for the town to protect. So flood hazard areas and future condition flood hazard areas, making sure that we're not placing development where they're at risk of flood um flooding as the town continues to develop. Um obviously riparian buffers are are important and wetlands um since this is an optional and voluntary process, we decided to include jurisdictional and non-jurisdictional wetlands um to create a greater swath of protection for environmentally sensitive areas. We also um included some culturally significant areas, so historical sites um sites that are in the national register of historic places and um other sites that are important to the town. Um and then we go into preservation and what that looks like for conservation subdivisions. So um again preservation is in perpetuity, you know as long as this development exists, as long as this land exists, it will be protected as a conservation area and that is set by a legal instrument that the town staff can approve and that can look different for each developer that comes in. Um but the meat of it is that you're going to create a conservation area management plan or a camp and so the applicant will submit this to the town for review and it's just going to say the party responsible for management um of the property and also uh explicit provision that grants the
town the right to to come in if they're not being managed properly. Um and so this is just a a kind of fail-safe thing that we want to make sure that we're allowed to conserve that area and manage that area properly. Um but ownership of the conservation area is meant to be uh dedicated and meets and bounds um to a a third party or an HOA, um someone that is able to come in and maintain that. Um as well I want to note the eight is remaining the same. Um so conservation subdivisions are going to be served by public water and sewer, which does mean that um any developer pursuing a conservation subdivision will have to annex to the town. And that's still a process that comes through the Board of Commissioners. Um all right, cool. So that's the meat of if they if a developer pursues a traditional conservation subdivision um in I think it's F. I don't have my glasses on. [clears throat] Thank you. [laughter] Um F is incentives. So this is uh if a developer wants to take some of that transition area and dedicate it more to conservation area, um what they can get in return for conserving more of their site. And so we have an overall cap and this is just to make sure that no matter what um a developer can't put more than eight dwelling units per acre or 35% built-upon area because we still want to be able to cluster development um and we also want to make sure that we're not um overwhelming the site. So what you can do in in these instances later on in section subsection F is stack your incentives. Um so as you go through, you have this table, which admittedly looks a little bit confusing, but it's just to say that there are certain types of incentives that you can stack on top of each other if you're
pursuing a conservation subdivision. Um and in that you can get increased density and you can also get built-upon area, but the town will get um increased conservation area. Um and so this is to say that if you are using two resiliency incentives, you could get six dwelling units per acre. You would be conserving 60% of your site and your built-upon area could be 35% and then that transition area is the only area that you're pulling from to get these incentives and would be 5 percent. Um and again, transition areas are like your lawns, uh your yards, areas that are pervious, um but are not exactly conservation area because you disturb them during construction. And your built upon area also includes like your roadways, um your driveways, your sheds, decks, patios, houses. Um so the density incentive is one of the main incentives originally, and this is just to make sure that if you're if a developer [clears throat] is pursuing greater than that 50 percent minimum, um they get uh increased dwelling units per acre. And then you can see from the table it's taken from that transition area. And then the resiliency incentives are um voluntarily incorporating um certain incentives like conservation restoration incentives, which is um native plantings, um if each lot is including like a bioswale or a rain garden, um you can get incentives that way, and you can get a little bit more impervious surface um built upon area seating for your project site.
Maybe I Maybe I Maybe I would just want to understand.
Mhm.
So the resiliency incentives the the more it resiliency incentives you you incorporate into your plan, the
lower amount of the density per acre is that what I I just don't understand the chart a little bit. So if you
Yeah. Um the chart at the top is like assuming that you're always going to max out your density incentive, um but when you when you stack resiliency incentives, so if you did the conservancy and restoration incentive um and you did the transportation improvements incentive, um you're taking from that transition area, and you're also taking from and you're adding to the conservation area. Does that make sense? You're
Uh-huh.
essentially you're trying to balance out the conservation area that you're providing and the density you're getting as well as the built-upon area that you're getting, but you're only allowed to take 20% of your project area from the transition area. So it's like you're filling your other buckets of conservation area and resiliency incentives um to get more built-upon area, but you can't go below like your 5% from your transition area bucket. But that's just to be clear um they don't have to use any resiliency incentives. So if they wanted the max density, they could really only take from the transition area to add to the conservation area bucket. Um but this is just to say that if a developer wanted more built-upon area, they could do that and still get some density incentives.
Okay. Got it.
just ways that a developer could use and could like mean out incentives.
And then broader picture I'm sorry to derail the conversation, but just quick just quick question. In terms of what why would an why would a developer use this determination or this designation? What what is the benefit for them uh out you know like big picture benefit for them? What do they get?
I mean not what do they get, but why would they want to?
Yeah. Um a couple of the maybe not clearly explicitly stated would be the administrative approval. So for most other preliminary plats, those are still coming before the board and those will be a longer timeline to approval. Um and we also have maybe an expedited review for conservation subdivisions. So it's it would be ideally a little bit of a shorter process to approval and to build. Um and this is also the density is made an incentive to developers. So right now as the test text exists, you can only do up to four dwelling units per acre, but if they wanted to pursue one of these incentives, they could get more houses on
Got it.
the same acreage.
Cool.
Got another question? Oh, okay. While while we're talking about that, so what is an expedited review look like?
Yeah. We haven't defined it in the text because it is flexible depending on town staff capabilities and capacity, but it would Right now the town is 30 business days review, and expedited review could be anything from 15 to 20 days review.
So what would be I mean, when I hear the word expedited, I think that corners are cut versus a priority review. So I mean, are we talking about leaving out certain steps in an expedited review for this or giving it priority?
It's a It's more like a priority. It gets shifted timeline to the front ahead of other schedules.
Okay. All right. Well, then that makes more sense and is more palatable than
They would definitely be meeting all of the town review steps.
Okay. All right.
Priority is a good way to Cool. We're almost done.
And then there's two more incentives underneath this, a stormwater incentive and an affordable housing incentive. Something to We know is the affordable housing incentive. There's already an affordable housing incentive in the UDO, and the language in here is just to say that you can't stack both of the affordable housing incentives on each other. So these incentives are really only available for conservation subdivisions, and they're only contained in the conservation subdivision text. We can continue to answer any questions that you have.
Okay, if you say. [laughter] One more thing is [clears throat] in in terms of like do you have any historical knowledge on how many conservation unit or what official title conservation subdivisions have been approved or in use over the past x amount of years?
In Pittsburgh or just
Yeah, yeah, yeah, here, here, here.
Yeah. Zero.
Zero.
say I'm not aware of any. Yeah. I don't remember any.
So this is a an it's a it's a theoretical it's a theoretical thing if a developer wanted to take advantage of it. But they don't but it's not been taken advantage of in so far.
We have a couple of conservation subdivisions under review right now. And we're The reason we proposed this text amendment is because we're bumping up into issues with the current language. And so this is to alleviate some of those tensions.
To clarify and to to apply some flexibility so that it actually can be used.
Used. Okay, got it. Cool.
Can I I wouldn't have a question about a lot of the changes were well not all the changes. It states that you can do this at any zoning district.
Mhm.
So if you have like a business district property, you could
turn it into a residential basically property?
Yeah. That was original language. And so because of the the down zoning statute, we can't take away developers right to choose a conservation subdivision in any of the zoning districts because it was already given to them in the original one.
Like well it's I mean it's not a bad thing. I'm not saying it's a bad thing. I'm just And then what if he were a medium density before residential? Has there been any thought to I'm assuming for medium density zone you don't have anything there currently. You're going to put a conservation subdivision in. Is there any thought to having a higher density available for the conservation besides eight per acre with all the incentives? I mean, it feels like to me that a very large tract of land with a lot of conservation area could handle more than eight houses per acre and still be extremely good for the environment. Might even be better cuz you have more people taking up a smaller footprint on a larger park-like conservation area. Has there been any thought to that?
Staff has discussed it, um but because a a lot of the larger parcels are in the ETJ already, um those are historically lower density. Um we felt that eight was a a good starting point for conservation.
point currently is a four, so we doubled it pretty much.
I I don't have any issue with the way it's run. I just thought something to think about is there I could see uh being even better for the environment if you put more people in a more dense area and had less services and less sprawl to deal with with a larger park-like service to deal with them as well I mean have for them available. Something to think about.
So I think when you say that, I think of like Central Park in New York City.
Yeah, right? That's like the park
of density, but also a big big conserved area.
Yeah. It would just be weird to have a
giant complex in the middle of a rural area and you know not that much space I mean if you had let's say I don't know 100 acres and then you had all this built up around it or in it and then you had farms all around it, right? And without any services, I think we would be inconsistent with what we're trying to do, isn't it? What staff is doing, right? So yeah.
I have one question. What just uh I see with the affordable housing incentive um on-site or off-site housing opportunities, what what's an example of an off-site housing opportunity?
It would most likely be uh like a fee in lieu payment. But it could also be their maybe donating to Adopt-A-Stream in the
That's what I thought, but I wasn't sure if there was some other instance that you've seen before that was come up with.
And this Oh, sorry.
No, you go ahead.
And this would affect I know you said you have some in the process of being in the process right now. Would this affect those already in the process or this is for future development?
It is for future development. Those in the process right now could elect to switch to this. So state statute says that a developer has permit choice. So when something like this happens, they can continue to stay with the original text language or they can pursue the new text language.
Oh, cool.
And I assume the the idea here is that we've made this a little sweeter than the existing language.
That's the goal.
Okay. Some comments and just a few questions I'm going to go through this. So at the bottom of page four, top of page five where we've got all the bullet points there.
[clears throat]
Yeah, the the purpose statement?
Yes.
Okay.
Okay. So again, you know, this is outcome based. So what I'm looking at is aligning all your bullet points that are in there with outcomes that And I'm looking at bullet points two and three to line up with the rest of them. So you've got bullet point number two. It says encourage maintenance and enhancement. And really I would think that the the outcome would be maintain and enhance wildlife habitat and environmental, natural, etc., rather than you know starting We're not encouraging, we're maintaining, okay? And the second one is basically the same thing. I just take the words and reverse them and say uh retain existing vegetation to minimize land disturbance and erosion. All right, then down on page six. Okay. And I was glad that you do you make the distinction and I guess from my standpoint you may view this as nitpicky, but there is a difference in the words and that is historical versus historic. And I'd like to make sure that that's clarified so that nobody can use those words against us. But anyway uh when we're talking about historic we're talking about of notable like a historic district like we have. Whereas really I think at least on the existing conditions map I would prefer that number or letter C say location of existing cultural or historical resources
Okay.
because it sounds like it has to have that designation and that's not what we want. And I also would like to see um
we've got um the streams, rivers, wetlands, etc. uh I would like to see wildlife habitat added to that also as something that would be part of that existing conditions map. All right, and I think oh the only other question I had was on page 10. Yeah. So this is where and maybe I am just being entirely thick on this, but the transportation improvements incentive where the applicant improves off-site adjacent transportation corridors that were not identified as [clears throat] traffic impact analysis recommended improvements. So I I could see it making more sense to me if it says that were identified as traffic impact analysis recommendations. But if that is the correct wording then who makes the determination as to whether those off-site improvements justify the 5% increase in build upon?
That's a good question. Um we have language right now that says the the planning director would make that decision um but we can definitely revise it and add a [clears throat] some other checkpoint for some other entity to review in those. Um I think ideally, correct me if I'm wrong, uh if it's a recommendation that's included in the TIA, they'll usually have to do that already. So this is saying uh additional improvements that would happen on other transportation corridors you would get benefits for that.
So there's an intersection two roads over, they know that there's a a a problem at that intersection and they
say, okay, we'll we'll do the update to this intersection, we'll add a turn lane or we'll make improvements for that section. That's an example of something that would be
I think like last year, didn't we have like um maybe last year or two years ago, didn't we have like a extra sidewalk by the library?
Yes.
That seemed like an off-site you might not have been on
I don't know if that would count as a traffic
impact
Um
I I think what Alan's getting out is we need to go above and beyond the TIA. We don't need to This makes it sound a little bit like you could just do something else.
That was my first impression you know put some planters out or something like that.
I think I mean obviously if if the director of the staff are are at they're going to make sure the TIA is approved, but the language sounds point seems like it's missing a it needs to be better than the TIA.
I I mean yeah, like I say, I would feel much more comfortable if they did a recommended improvement, but but I guess the wording the way it is here, they could do something else but not even touch any recommended improvements.
We can Yeah, just finesse that a little bit, I think.
Yeah.
Cuz [clears throat]
Okay. And And my last comment is I I still am a little bit reluctant. I I mean I know that we want to provide incentives, but the and I'll refer to it as a priority review, but that being solely in the hands of staff I mean you all are very capable, but I just I'm a little bit queasy about not having one additional sign off on that.
Whose Whose sign off would you
I would say the Board of Commissioners.
Is that the normal process?
So by state law, it's administrative of preliminary plats and site plans. We just currently have it in the process that it's preliminary plat.
Right.
Okay.
So the state statute is administrative for a preliminary plat and site plan. Currently site plan is done administratively. The preliminary plats are not, but that is projected to move
later on to follow that process cuz right now all it does is extend the process. All of the eventual the preliminary plats and site plans will have a a time period about every quarter that we brought to the board eventually so they still get to see everything. They still have that information. There's still information meetings. Those don't change.
Okay.
It's just the how that timing works because that timing extends the review period. That That's not actually under review at that point. It's just going to the board and there's really nothing that can be done at that point cuz they've met the rules under that section of the UDO.
Okay.
So there's really no more no more to add to that point for it to go that way.
Do you understand your hesitance though? And hopefully eventually the interactive development map will be just a little bit more fleshed out so you can see those and review those plans concurrently with staff.
right.
I have lots of comments.
[laughter]
Okay. [clears throat]
I've I've written stuff out because I didn't want to forget anything. First I want to say thank you to y'all. I know you've done a lot of work on this and and I appreciate it. It it needed clarification. It has for a long time and I really appreciate what you've done. I also strongly support the concept of permanently conserving large parcels of land. But I think the incentives in this proposal are too generous. When I look at the GIS maps, I still see thousands of undeveloped acres in the ETJ. Current zoning on these parcels include RA which limits density to one house per acre, RA two which allows one house per two acres, and RA five which has a maximum density of one house per five acres of land. Most of those parcels are on the western side of Pittsburgh, but there are still
a few parcels left on the edges of the ETJ to the east. I definitely want all of these properties to be protected as much as possible. [snorts] Most of the land impacted by this proposal is in the ETJ. And as the only member of this board currently representing the ETJ, I have a different perspective from all of you. I'm very concerned about the potential impacts of this increase in total volume and density on the buildable portions of these properties. Over the past few years, I have attended many community meetings and talked to many neighbors and I am convinced that density up to 12 times what is allowed in current zoning does not align with our community vision. Theoretically a 100-acre parcel currently zoned RA5 could go from a maximum of 20 houses spread over 100 acres to 240 houses squeezed into 30 acres of that same parcel. If this proposal is approved as presented, I think that is extreme and unacceptable in the ETJ. So I cannot support this proposal as it's currently written. But with some additional language and some changes to the incentive levels, I think this concept can be much more acceptable to the community. I think community input is critical in the development process. Like y'all were just saying, the current proposal allows all conservation subdivisions to be subject to administrative approval by town staff. That means we would never see the proposal and it would never go to the Board of Commissioners. It's my understanding that if a developer chooses to do a conservation subdivision, current zoning would be automatically superseded and the only approval needed
would be at the staff level. So our recommendation right now is our only chance to get this right. This decision may affect the development of thousands of acres of rural land in the ETJ. I [snorts] recommend that at least two required community meetings be written into the ordinance. One should be early in the process to give the community a voice as critical decisions are being made and then another meeting later after adjustments have been made based on initial community input. Since staff will be making the approval decisions, they should have to attend community meetings so they can hear directly from the public. These community meetings should be widely advertised to the general community and not limited to immediate neighbors. I also have some concerns about future enforcement of the pervious surfaces in the transitional areas as well as features included in the conservancy and restoration incentive. In the draft proposal, 5 to 25% of the total acreage is designated permanently as an area that must remain pervious. I like that. I understand this traditional area would include things like lawns, nature trails, and recreation areas. At least some of that transitional area would be on private property. The developer would get the benefits upfront for creating these permanently pervious transition areas, but I'm concerned about what may happen to it in the long term after the developer is long gone. The burden of monitoring and enforcing the pervious surface requirement and the conservancy and restoration incentives would fall on the town and would likely
require increased staffing. Infractions could include things like adding a shed or pavement to private property or even community recreation areas or removal of things like rain gardens or rain barrels. Perhaps we should include language in this ordinance to specify penalties like fines as a deterrent and to help cover the cost to the town for monitoring and enforcement. There are some terms in the current proposal that need definitions or better explanations. Y'all have already brought up some. Um I think the term drainage basin is used in the stormwater incentive and it seems pretty generic and should be more clearly defined. The terms wildlife corridor and wildlife habitat are used a few times in the draft document, and they need to be more clearly defined and measurable. A quick internet search suggested that a wildlife corridor accommodating large mammals like white-tailed deer or black bear, both of which I've had on my property this year, um should be about 1,000 ft wide, and that seems like a lot to me, but we just need clear definitions so we're all on the same page. A whole section of this draft is about the watershed critical overlay district with references to the WCAO and the WPAO. I think specific descriptions of those districts with links or maps or something would be helpful cuz I tried to find what you showed me and I never pull it back up. Um the draft document allows affordable housing as an incentive, but there is no clear direction about where that housing should be located. If this incentive is used, we need language to specify what percentage of the affordable housing units are built on the project site. I suggest
a minimum of 50 percent. There should also be a requirement that affordable housing should be integrated throughout the project and not grouped together in just one spot. Finally, the density standards and incremental increases need to be adjusted, and the baseline needs to be based on the number of houses per acre already established by zoning for each district. The current proposal uses the same baseline for all zoning districts districts, which effectively increases total allowable volume of houses 2.4 times in RA, 4.8 times in RA 2, and 12 times in RA 5. By tweaking the numbers for density standards and incremental increases, I compared several different options. The maximum increases in the total number of houses allowed in these new options range from 1.225 times current to 2.1 times current. All of these options still require preserving 50 to 70% of the property in a permanent conservation area and still allows the developers to build significantly more houses than they would currently be able to build on the same property. I personally prefer the option with the least increase in volume, but an option that increases the number of houses by 1.8 times is probably a more acceptable compromise. The 1.8 option would allow up to 180 homes on 30 acres with RA zoning compared to the 100 homes on 100 acres allowed now or 240 homes on 30 acres allowed by the current draft proposal. For RA 2, the numbers would go from 50 houses on 100 acres to 90 houses on 30
acres and in RA 5 from 20 houses on 100 acres to 36 houses on 30 acres. This decision is important to the ETJ, but it is not just an ETJ issue. The rural picturesque landscape of the countryside in the ETJ surrounding Pittsboro is a big part of what makes our town so attractive. [clears throat] I don't think any of us want to destroy any more of that. Thank you.
Do we have any questions? Any more questions or comments? All right. That and um I will accept the motion. Approve, deny. Uh
Well, I would I'd like to suggest maybe a tabling of the option until next meeting.
going to get there.
[laughter]
I would like some
table.
Sorry. I [laughter] want to get
an actual motion and we have to vote on it. I think we should maybe move to table and research do a little more research based on everybody's input.
All right. Well, um then is that a uh motion to table to
Yeah, I just uh as a discussion point what's how does this work? I mean would we be able to work with the staff on some of these critical points and talk through it? Okay.
We can even do a working session if necessary.
Yeah.
Yeah, we can schedule something and do that.
Well, I I I'll move to table this approval until next meeting for now.
Okay, and that would be uh what are we December
2021st
December 21st meeting.
[clears throat] [cough]
Our second.
Eight. All right, have a motion by James Buster to table this to our December 21st meeting seconded by Alan Wilson. Um all in favor please say aye.
Aye.
Um any opposed?
All right. Um motion passes. Thank you. With that then we will move on to our second and final action item of the night PB 26439 the Northwood M U P D rezoning.
[clears throat]
It's been so long [laughter] I will do the [clears throat] best I can if I start to lose my voice I'm going to have one of these two take over just her. Okay, so this is um plan development rezoning case P B 26439 Northwood M U P D. I'm May Armstrong development director in Schmaticky, um project engineer, and Liz I'm not even going to try. [laughter] I'm sorry. Just married. All right. So, slide two, this is the subject property. It is approximately 93.42 acres on Highway 15 501 south of Northwood High School, north of Highway 64 and west of Chatham Park Mosaic Boulevard. The property is currently partially developed with commercial, office, and multi-family residential buildings. With the zoning, the property is currently zoned mixed use plan development. This is the MUPD was originally rezoned in 2019 with revisions that were approved in 2022. The intent of the mixed use plan development is defined in UDO section 2.5.4 as an area that integrates mixed uses, which may include commercial, office, institutional, hotel, residential, and recreational uses. This district is meant to encourage the design of a more complete and sustainable environment consistent with the town's small town character through initiative magic imaginative approaches
to community and design. So, the proposed zoning, the applicant is proposing to amend the current MUPD rezoning to allow for self-storage or mini storage indoor and a right-in right-out driveway access to lot 18 alongside some text changes and updates to the MUPD plan. These text changes are available for you to see in attachment four as redline and strikethrough and underline. The removal change is the intent as a suburban shopping center. The original rezoning permitted all uses in the C2 Highway Commercial Zoning District. The applicant proposed adding uh mini storage indoor as a permitted use regulated to lots 10 to 14 and mini storage is industrial use under UDO section 12.8. Industrial uses are not in the C2 Zoning District nor the mixed use activity center designation. The applicant proposed a direct right-in right-out driveway onto highway 15501 and is offered to convert it to a right-in if an internal connection is later provided. The driveway would access a 55 mph aerial within the US 64 interchange functional area where NCDOT safety scores exceed 65 for 2021 to 2025. So if you refer to map on page three of the staff report that shows this, um RPD have noted multiple serious crashes and shared staff concerns. The UDO section 6.3 requires internal cross connectivity and lot 18 already has an approved internal access through the MUPD. The land use map for Pittsburgh classifies the subject property as multi-use activity center, a designation meant for services and activities supporting the surrounding neighborhoods. It calls for a defined center around a community anchor, commercial, office, civic, and institutional uses and accessibility by both a convenient road network and sidewalks or greenways. The staff finds
the proposed rezoning amendment inconsistent with the land use classification because it proposes industrial uses and a potential lot 18 development disconnected from the remaining MUPD site. Our final notes, we want to say that the applicant concluded a community meeting on June 11th, 2026. The community meeting report is also attached in the packet. The full list of the proposed uses and zoning conditions can be found starting on page two of the staff report the applicant is proposing. Planning staff recommends denial of the rezoning case PB26439 Northwood as proposed by the applicant for the reasons stated above. I'll be happy to answer any questions you have and allow the applicant to come up forward to speak afterwards.
Do we have any questions?
I mean one thing, and you identified fatal crashes, do we have any reports that would show us accidents in total in that area?
so at the Northwood High School, there's one fatal crash and over five actual crashes in addition to that. At the Lowe's shopping center that is south of this the interchange intersection, there is one fatal crash and there are five Pardon? [laughter] Um, there are five crashes in the last five years at the Lowe's shopping center that was also Northwood High School. Your level of um knowledge in driving is less and you also are the potential for a hotel on lot 18 creates a situation where they're not used to the traffic patterns coming out of that section.
[sighs]
I think my my hesitation on this one was the the adding mini storage uh to it. Being a industrial
use, I'm not a huge fan in this area.
I yeah, I don't like that there. Mm-mm.
Wasn't there a proposal for mini storage
It was before and we denied it.
That was here? Was that I thought that was further north.
It's it's not much further. No, it's it's not much further. Mm-mm.
Um, but yes, right.
[snorts]
I was um curious about the um the right-in right-out driveway. I I wasn't quite sure what that meant and I looked it up and I still was like a little bit unclear about what the applicant was proposing. So is there any uh anybody who can like explain it a little bit to me? Cuz I think I get it, but perhaps I don't. So
Let me see if it says the laser on it. [groaning] I don't want to face You are literally on the right side. Get to the side. So, this the driveway would be right here and it would be so coming down
Uh-huh.
You can see right here.
May I use the mouse?
It is it is kind of Oh, there we go.
we go.
There we go. Cool. Okay. So, right about approximately right here. So, the distance between the two driveways it is coming down the section. They have proposed a small like offset so it's a turn lane into it.
Uh-huh.
so that would protect um and mitigate potentially the rear end situation.
Right.
But they want to have a right out that has a shorter timeline to get back out of here and you're coming out at 55 mph here and then they're in a lane that is an off it's an off ramp to that section and it has a neutral zone between it which means that lane that they're coming off onto has to turn off. It does not go straight through that intersection. So, it's just like if you look down at Lowes before where that it causes like a transition there this would be a similar transition coming right out of there.
Knowledge not being if you're if it was a hotel use they would not have that knowledge as a normal it would be an unexpected opportunity and then especially with the the Northwood High School as well. So, um inexperienced drivers.
and then they did not want to connect that to the rest of the the internal
It says if.
If.
Okay. Um and then the right out is primarily the issue with that that driveway in my opinion. It is it's a short distance high speed and there is no mitigation measure attached to that section.
Right.
So, I have my questions and I needed a safety analysis and that analysis had not been provided yet for that specific movement.
Because the the ramp to to 64 is like right underneath, right?
Yes. That that off ramp ties into that that interchange right there. So, that's the interchange ramp and that off ramp is part of that and goes off to that 64 section. So, all those that all of the turns at that intersection all interchange in different sections going two different directions.
Yeah. I'm not sure if you're familiar with Apex, but like where Beaver Creek is, there's that indoor self-storage right by Sorry. By the In between like the Home Depot and um the rest of Yeah? And the You kind of have to turn right Like it's really a quick turn to get up that hill to get to that self-storage. And And then the people are coming down 64 really fast, and it can sometimes get a little scary even if you're trying to get onto 64. So I can understand the the need for a safety Some kind of safety analysis to see if it's possible, but it just I mean, by the looks of it, on the face of it, doesn't seem like a realistic way to get in and out of a property in a safe way.
The right in I understand it is the right out that I have my concerns with.
Yeah.
And you still need the internal connectivity to meet the MUPD.
So the driveways are really short like it is over at McDonald's and Lowe's
coming out there very short. And cars are turning in there and it's They're coming.
And no address has been given to the internal network on that section as well.
Well, seems
There's no questions for staff, and we'll turn it over to let the applicant have a
Okay. Um Yeah. Any further questions? All right. Then we'll let uh the applicant speak if they would. Uh just to maintain an orderly and consistent process, board members are asked to direct questions to staff, and staff will coordinate with the presenter uh as needed to obtain any requested information or clarification for the board.
Mr. Chairman, members of the planning board, my name is Patrick Bradshaw. I practice law at 128 Hillsborough Street in Pittsburgh. And I'm here this evening representing the applicant in this request for an amendment to the zoning requirements for the Northwood MUPD. Northwood Landing is a master plan, 92 and 1/2 acre mixed use project prominently located north of the intersection of US 15 501 and US 64 across from Mosaic and Chatham Park. And is a key commercial gateway to the town of Pittsburgh. The project is anchored by a full-service Lowe's Foods grocery store and offers a mix of retail, food, services, and preserved public open space, green space. The project directly supports the town's smart growth objectives, enhances quality of life for local residents, strengthens the town's commercial tax base, and contributes employment opportunities to the local economy. Medley at Northwood Landing provides high-quality, attainable multi-family housing options for local educators, healthcare workers, service employees, and young families that contribute to the town's affordable housing goals featuring modern amenities, EV charging stations, and immediate pedestrian access to daily necessities.
Currently, all 312 units at Medley at Northwood qualify as workforce housing [clears throat] under the Chatham Park affordable housing element. Specifically to why we're here this evening, we are requesting a few minor revisions to the zoning requirements for the Northwood MUPD to refine the functionality of the project, adapt to evolving tenant and community needs, and ensure the continued cohesive execution of the master plan without altering the project's core character or scale. Most of the proposed changes just make the master plan consistent with the way the project is actually developed. Some specific modifications include the addition of self-storage or mini storage as a permitted use in the project and the addition of a right-in, right-out driveway serving lot 18. The staff is also committed on a proposal to strike language about upper-story office and or residential use above ground floor commercial. That was one of the changes meant to reflect what has actually occurred so far in the development and what the market appears to support. But if it is important to the town to keep that language in the master plan, the applicant is amenable to doing so. As for the addition of self-storage as a permitted use, we believe this is consistent with the idea of a mixed-use plan development and the town's land use plan. An MUPD should have a mix of uses as defined in the master plan and should be consistent with the land use plan and the purposes of an MUPD. The land use plan identifies the Northwood area as a mixed-use activity center. Mixed-use activity centers are to provide services and activities that are supportive of surrounding residential neighborhoods, including apartments located in close proximity to services. The UDO says MUPD should integrate a mix of uses and encourage complete and sustainable environments.
In conversation with the staff, the applicant has already agreed to limit the self-storage use to the lots behind the Lowe's Foods, so any storage facility developed would not be visible from the major thoroughfares. The facilities would, however, provide a service that is in high demand by the resident residents of Medley and other residents in the area while causing little or no visual impact to areas outside the MUPD. There is nothing in the UDO or the land use plan that prohibits allowing self-storage in the MUPD. And we believe it would be a positive addition to the community and would promote the purposes of the mixed-use activity center in the land use plan and the MUPD in the UDO. The staff has as you've heard just a moment ago, has raised questions about the proposed right-in right-out access to lot 18. At this point, I'd like to ask Travis Fluet, the traffic engineer for the project with Kimley-Horn and Associates, to address some of those concerns.
Good evening. Travis Flowe with Kimley Horn and Associates. Apologize if I'm a little long-winded. I got a lot to go over. I want to make sure we're addressing all the staff Um so sorry I don't have an exhibit for you or a series of exhibits, but some examples um Kirkland Road is a full movement access on Lake Wheeler Road, approximately 400 ft from the I-40 interchange in Raleigh. Solomon I can't pronounce this word. Graven right Road, Brooks Road, full movement access right here in Pittsburgh on Graham Road, 375 ft from the US-64 bypass. Gas station driveways on Mebane Oaks
Road, 325 ft from the I-40 interchange in Mebane on both sides of the interchange. Lowe's driveway is a right-in right-access on Gregory Pool Lane in Mebane, 225 ft from the I-40 interchange. My personal favorite This goes on and on. My personal favorite is a right-in right-out driveway. It's actually a directional crossover. Right-in right-out left-in on Capital Boulevard, 250 ft from the I-440 interchange in Raleigh in the middle of dual right turn lanes onto a free flow free flow ramp. I found about 15 to 20 examples in 30 minutes of looking. I'm sorry. I'm getting over a cold and I'm struggling. [clears throat] In about 30 minutes of looking my point in this is that there are hundreds of examples throughout the state of North Carolina and in this area of ramps closer driveways closer to interchanges than this one. The all the guidelines that staff has cited in their review are just that. They are guidelines. As engineers, it's our duty to understand those guidelines and the principles behind them so that we can understand when those guidelines can when exceptions can be made to those guidelines and engineering judgment can be applied to waiver from those guidelines. That is why we performed analyses to analyze this driveway and the potential issues associated with this driveway, which I will address here shortly. But the most important thing I'm going to say tonight is NCDOT, the steward of North Carolina Roadways and a group not known for approving unsafe conditions in North Carolina, has been willing and approved this driveway for going on two years now. We first approached DOT about this in 2024, in the spring of 2024. We have
coordinated with them on the design of this driveway and they were willing to approve it, sign off on it as a right-in right-out, and then said we need staff approval from the town of Pittsboro and we've been coordinating with town staff on this for over a year. So we performed a traffic analysis analyzing this driveway, looking at it as both a right-in right-out and a right-in. We performed new traffic counts along the corridor and grew traffic to the year 2030, added all the remaining traffic for Northwood Landing, all the remaining development, everything that's not built today, including the proposed hotel. We've assumed the hotel is a conservative use, but still a rather low-generating use. And performed capacity and queuing analyses which showed imperceptible impacts to traffic along this corridor. In fact, the Northwards Boulevard driveway actually operates better with the right-in right-out than without it. And there is no change to level service or delays at the 64 bypass interchange. There are no significant changes to our arterial delays or speeds, and in fact, it's marginally better with the right-in, right-out driveway. Cues at the interchange do not spill back to this driveway and are not projected to at Build Out of Northwood Landing, and no weaving issues are expected as we observe traffic on this section of 15501. The majority of the traffic on southbound 15501 gets into the right turn lane in advance of where this driveway is. So, they're already in the lane. So, anybody exiting this site making a right out, the traffic's already going to be in this lane, and they can turn There are three southbound lanes, two go straight through the interchange, and one goes right, and they can turn into any one of those lanes. There are thousands of examples of right-out driveways on 55 mph roads. In fact, Mosaic has two of them on northbound
15501. There's one just north of Russet Run, and then there's another one north of the entrance to the high school. So, if you're looking for examples, those are two good examples of right-in, right-out driveways. This one will be very comparable to those two. There will be a right turn deceleration lane into this driveway and a right out on a 55 mph roadway. [cough] So, NCDOT reviewed the analysis, and their only concern was with northbound to southbound U-turns happening at the Northwood High School Russet Run signal. We have committed to prohibiting that U-turn, installing a no U-turn sign so the traffic won't U-turn there, and that eliminated NCDOT's concern, and based on that, they are satisfied with the analysis [cough] driveway as proposed. Um, and as staff mentioned, when the connection when if the connection is made over the creek, there there's a stream buffer there. That's why this whole thing came up is the challenge of crossing that stream buffer. Once that drive connection is made, this will be restricted to right in only. Again, with the right turn deceleration lane. We have reviewed the crash data along this section. There were 27 crashes from the intersection of Russet Run down to the interchange, but only three of those are involved southbound traffic along this section. There were there was one side swipe and then two vehicles that ran off the road into the median. And the daily volume on this section of southbound 15501 is about approximately 11,000 vehicles a day. So if you assume generously 10,000 vehicles a day over five years, it's an average of 0.16 crashes from per million vehicles on this section of roadway. That is an extraordinarily low crash rate. So crash safety is not a concern along this section. We obviously can't do a safety analysis of what's going to
happen at this driveway because it doesn't exist yet. But the [snorts] driveway meets Old Town driveway spacing standards. Um it's 200 more than 250 ft. It's approximately 600 ft from Northwood Boulevard and then about 600 ft from the interchange. So town spacing requirements are 250 ft from intersections along collector streets and thoroughfares. We exceed that. 250 ft from any intersection along minor arterials. Um 400 ft for driveways with an ADT of more than 300 ft, and we meet that. Um intersection sight distance is not an issue. This is a long tangent section. I've been out there. You can see all the way from this intersection at least to the intersection of Russet Run um and Northwood High School Boulevard. So that is a distance of approximately 1,200 ft and the stopping minimum stopping sight distance per the HASTO is 550 ft. So we definitely exceed stopping sight distance. So in summary, analyses were performed. We had a scoping meeting with town staff and NCDOT back in the spring. We now performed the analysis per the scoping meeting to address the concerns and showed no operational issues. We have no safety concerns with the addition of the right turn deceleration and we're adding the no U-turn sign at Northwood High School Road and Russet Run at the signal. We meet town state spacing standards. No sight distance issues exist. Therefore, it is my expert professional opinion that this driveway will operate safely and effectively. But more importantly, the North Carolina Department of Transportation, whose road this is, feels that this driveway will operate safely and effectively. Otherwise, they would not be willing to approve it. And I welcome any questions you may have. Thank you.
Thank you.
So, Mr. Chairman and board members, Mr. Fluet has extensively addressed the safety concerns raised by the staff about the proposed right-in right-out access. Mr. Fluet is a well-trained and experienced traffic engineers engineer, and he says the driveway would be safe. The NCDOT has indicated in writing that it would approve the driveway connection to US 15501, concluding that the interchange would meet safety requirements. To the best of my knowledge, the conclusion of the town staff that the driveway would not be sufficiently safe is not based on the analysis or opinion of any qualified traffic engineer. [clears throat] While the staff is correct that the town is not required to approve a legislative zoning change, the town is always required to exercise its decision-making authority in a manner that is neither arbitrary nor capricious. For the town to deny the zoning amendment on the grounds that the proposed driveway is not safe in the face of the applicant's traffic engineer and NCDOT concluding that it is safe, and without any expert analysis or opinion to the contrary, would be an arbitrary and capricious access of the town's authority and would violate the applicant's legal rights. Moreover, while the UDO does require internal vehicular access systems, it also requires connectivity to the surrounding existing public road systems. There is nothing in the UDO that requires [clears throat] every single lot in an MUPD to be accessed solely from an internal road system. The Northwood MUPD already has multiple access points to the surrounding public roads and will likely have more in the future as the property to the west is developed. The alternative to the requested right-in right-out access would be an
expensive and environmentally sensitive crossing of Haven Creek. If you agree with us that all of the relevant evidence is that the proposed driveway meets safety requirements and that the right-in right-out is a reasonable alternative to crossing Haven Creek, there is nothing in the UDO or in applicable traffic design standards that prevents you from recommending approval of the MUPD amendment. So on behalf of the applicant, I respectfully request that you approve the consistency and reasonable reasonableness statements that have been presented to you and recommend approval of the zoning amendment request to the Board of Commissioners. And Mr. Fluent and I would be happy to try to respond to any questions you might have. We also have the project's uh civil engineer here if there's anything that's relevant to hear from them.
[clears throat]
Okay. Um is there any discussion we would like to have any further questions?
Yes.
Yes, ma'am.
So changing the um changing the zoning for or changing the MUPD or this is MUPA, right? Activity Center? Is that right? What's it currently now?
It's it's an MUPD. It's mixed use plan district. It's within the mixed use activity center future land use designation. They're very similar names.
Okay. And would whatever we change if we approve or recommend approval and the town I mean the board approves also, would that change um would that add that indoor that indoor self storage for for the for for all for all um plots or or areas from now on or would that just be for this particular
For this particular mixed use plan development.
just this one. So it wouldn't change it for like some other part of Pittsburgh.
Correct. Yeah. It would only be attached to this plan.
Adding that piece and and then subtracting the other things that they recommended in what they sent over. Okay. And then the second question I had was where's this creek that they don't want to have to cross over?
You can kind of see it. It's the the tree line right there.
Uh-huh.
Mhm.
There's a creek in there. Yeah.
Mhm. Yeah. Hayden Creek. Yeah.
And so the new driveway would [clears throat] eliminate having to cross that cross over that? Or the proposed driveway would eliminate crossing over that?
Their language says if.
If if keep saying if. Yeah. Okay. Cool.
So they could still connect later on over that stream crossing.
Those are my two questions.
Mr. Chair, just following up on on the member's question if I may if the board is willing
I don't know that we I think our question was answered. Was it not?
wanted to add one point that I thought would be relevant, but I defer to the board.
Please.
The only point I wanted to make is to make sure that the board understands that pursuant to conversations that have already with the staff, the applicant has agreed to limit the self-storage uses to those lots behind direct that are directly behind those suits. And it and the uses would only apply in the specific M U P D as the staff has already confirmed.
[clears throat]
On the plan set, it's lots 10 through 14.
And which lots are the 10 through 14?
The the top five right there. Yeah, the four yeah, those.
Okay. Um do they have do they any more questions or discussion anyone would like to have? [snorts] If not, then um
I just got one. What did y'all think about them just saying if if we approve agree to approve they would just limit it to the lots 10 through 14 and behind those.
Uh planning staff's recommendation was that it's an industrially said therefore not compatible. Um but you are welcome to find your own recommendation.
Uh no no no. I was just you know cuz I know he was like but y'all we agreed to this but still it's still the same. It doesn't really change anything.
It does he like or continue to negotiate something that has already been negotiated by the staff or the applicant? I think it's a great question. I don't know if that needs to happen more. Um but tonight I know we have an option to vote or not uh or do something different.
[clears throat]
I will say
Cuz it's not binding. Is that what you're saying? That it's not binding just keep the self-storage above in those lots.
were just because of they was like saying one part is industrial and one is not. And but they are like okay, if you want to deny it because of these self storages, then we're just limited to the one to the lots 10 through 14 and and it's going to be behind Lowe's. It's not going to be visible. So we do it that way, y'all should recommend. It's that type. It's that.
Is there any other discussion? I apologize I don't know this, but for the rest of the properties about what's going in there?
I believe also still just a mix of commercial and office space.
Any more housing?
I'm believe they had the option from
Yeah, I thought they had the option, but I didn't know if they were
That's what it's supposed to be. Yeah.
I I think it it provides provides flexibility to the developer.
Right.
All right. Um who would like to make a motion?
All right. I will go ahead and start the ball rolling here then. I make a motion to recommend denial of rezoning case PB 26439 Northwood.
Second.
All right. I have a motion to recommend denial by Alan Wilson, seconded by James Buster. Um all in favor say aye.
Aye.
Any opposed? Unanimous. All right. Um that concludes our action items for tonight. We have our uh board comment period. Um does anybody have anything that they would like to share, any events coming up? Any fun events?
I have one I have had uh neighbors want to know when they were actually going to start the playground of of the sidewalks on 15501 and will it done during the nighttime? I told them I had no idea.
Yeah, that's that's a good question.
Yeah, yes.
A lot of questions about that too.
sorry sorry Ben, I'm sure
I mean we are.
subtle.
Yeah, I I mean it's he said he's getting a lot too as well. Yes, yes.
So NCDOT just provided an update within the last two weeks that due to the Enbridge gas line that's in conflict um the whole Hillsborough corridor project which includes the widening and the sidewalks and the
streetscape is being delayed till January 2028.
Okay.
For bid.
Um we do have a sidewalk on [clears throat] with now 15501 um between Pittsburgh Elementary School Road and Town Lake Park
Mhm.
um that hopefully will be starting in um I would say late late winter, early spring.
Okay.
Um
so that was that's exciting.
Is that going to be on the elementary school property then?
No, it it's it's in the right of way of it's 87 yeah.
Is it right Is it on the east side? Yeah.
Okay.
So it's on the elementary school side.
Yeah.
It um Yep.
And that's going to start in when Okay. We bid it out uh last month. Had a a good bid and um we're hopefully getting our funding ducks in a row so we can start early next year.
So there's been some tree trimming and stuff along there. Is that related to that?
is not related. I believe that was the the the power line company changed the way they trim in that area rather than trim they just cut cut them down but in the grand scheme of things they would be coming down anyways with this sidewalk.
Mhm.
So
On the sidewalk will Will any places where folks if they would walk from the elementary [cough and clears throat] school to the town park that they would have to cross traffic?
So there's a sidewalk on Pittsboro Elementary School Road and there's a an existing sidewalk on the east side of 87 kind of between the Hawaiian Barbecue place and the Pittsboro Elementary School Road. There's no sidewalk on the west side.
To get to the park?
Yeah.
So anybody on the west side they wouldn't have a sidewalk or a crossing plan.
Thank you, Ben. I don't want to don't want to keep you guys any later than we already have, but I think let's see we'll see each other again on the 20 21st right before Christmas, but likely won't see any of you before Thanksgiving, so everyone have a great holiday. If you're traveling be safe. And with that then I'll accept the motion to adjourn.
I'll make a motion we adjourn.
Motion by Miss Austin a second from Miss Piard. All in favor say aye.
Aye.
All right.
Speaking at this meeting
Town of Pittsboro's own rules for public comment — check them before you rely on anything here.
Agenda items (12)
-
1 CALL TO ORDERProceduralChairman, Corey Forrest.
-
2 CERTIFICATION OF QUORUMOther
-
3 ADOPTION OF THE AGENDAProceduralRequires a motion to either a) approve the agenda as proposed or b) modify the agenda.
-
4 PLANNING BOARD MEMBER MEETING ATTENDANCEProceduralPer the Town of Pittsboro U.D.O. Section 9.5 (h)-Excused absences due to illness, absence from the meeting due to personal hardship, if approved by a majority vote of the Planning Board, shall not constitute a lack of attendance. Absences shall be entered into the minutes of the meeting as either ‘excused’ or ‘unexcused’ at the next regularly scheduled meeting. Suggested Motion: " a motion to designate Alfreda Alston's absence from the October 19, 2026 meeting as (excused or unexcused)"Absence excused by voice vote
-
5 DEPARTMENT UPDATESOtherUpdates provided by Kevin Lewis, Planning Director, and/or Maie Armstrong, Development Services Director.
-
6 APPROVAL OF MINUTESMinutes approval
-
Minutes approvalSuggested Motion: " motion to approve the October 19, 2026 minutes as presented"Approved by voice vote
-
7 PUBLIC COMMENT PERIODProceduralPlease state your name and address at the start of your comments. There is a time limit of three minutes which will be displayed on the screen. In the interest of time and fairness, it is the Board's policy not to respond directly to comments during this period. Staff will follow up as appropriate. Any speaker with handouts shall be given to the Town Clerk and will be distributed to the Board at the conclusion of this meeting.
-
Ordinance Environment and sustainabilityFarmland and open spaceLand conversion and large developmentSubdivision and site plansZoning text amendmentAdvisory Board Recommendation: TBD Staff Recommendation: Staff recommends approval and supports consideration of this amendment ZTA-2026-11 to provide clarity for development within the Town’s planning jurisdiction. Suggested Motion: “…a motion to recommend approval of the ordinance ZTA-2026-11 amending the Town of Pittsboro Unified Development Ordinance.”Tabled to the December meeting by voice vote
-
Advisory Board Recommendation: TBD Staff Recommendation: Staff recommends denial of Rezoning Case PB-26-439 Northwood as offered by the applicant. Suggested Motion: “… a motion to recommend denial of Rezoning Case PB-26-439 Northwood.”Recommended denial, unanimous voice vote
- 98 Northwood Blvd · Eco Northwood Mupd LLC, · 29 acres · assessed $5,313,000
- Northwood Blvd · Eco Northwood Mupd LLC, · 7.4 acres · assessed $403,682
- 81 Northwood Blvd · Bjb Holdings LLC, · 1.2 acres · assessed $1,763,865
- 28 Harper Ln · Zaxpitt Re LLC, · 1.4 acres · assessed $2,677,080
- 54 Harper Ln · Jpmorgan Chase Bank N A, · 1.7 acres · assessed $3,138,467
- 40 101 Ramseur Rd · Northwood Landing Partners LLC, · 1.9 acres · assessed $3,058,482
- Harper Ln · Eco Northwood Mupd LLC, · 1.2 acres · assessed $1,512,000
- Harper Ln · Eco Northwood Mupd LLC, · 1.4 acres · assessed $1,620,000
- 101 Ramseur Rd · Mdi Management LLC, · 0.71 acres · assessed $249,550
- 65 Ramseur Rd · Mdi Management LLC, · 6.4 acres · assessed $10,935,757
- Landing BLVD · Eco Northwood Mupd LLC, · 1.2 acres · assessed $1,409,500
- Northwood High School Rd · Eco Northwood Mupd LLC, · 1.2 acres · assessed $1,409,500
- Northwood Blvd · Eco Northwood Mupd LLC, · 1.0 acres · assessed $1,357,000
- Northwood Blvd · Eco Northwood Mupd LLC, · 1.0 acres · assessed $1,353,500
- Northwood Blvd · Eco Northwood Mupd LLC, · 1.0 acres · assessed $1,353,500
- Northwood Blvd · Eco Northwood Ventures LLC, · 17 acres · assessed $56,214,685
- Northwood Blvd · Eco Northwood Mupd LLC, · 4.5 acres · assessed $867,825
- Northwood Blvd · Eco Northwood Mupd LLC, · 9.6 acres · assessed $1,858,500
-
9 BOARD COMMENT PERIODOtherChairman, Corey Forrest.
-
10 ADJOURNMENTProcedural
Agenda changes
What moved between published versions of this agenda. Item numbers shift constantly as things are inserted, so only genuine additions and removals are listed.
-
21 days ago
- Retitled to "Planning Board Regular".
- Agenda document posted.
- Added: 1 CALL TO ORDER
- Added: 2 CERTIFICATION OF QUORUM
- Added: 3 ADOPTION OF THE AGENDA
- Added: 4 PLANNING BOARD MEMBER MEETING ATTENDANCE
- Added: 5 DEPARTMENT UPDATES
- Added: 6 APPROVAL OF MINUTES
- Added: 6.I Minutes: October 19, 2026
- Added: 7 PUBLIC COMMENT PERIOD
- Added: 8.I Request: ZTA-2026-11 Conservation Subdivision
- Added: 8.II PB-26-439 Northwood MUPD Rezoning
- Added: 9 BOARD COMMENT PERIOD
- Added: 10 ADJOURNMENT
Other recent meetings of this board
-
Mon, Oct 196:00 pm10 items
-
Mon, Sep 216:00 pm15 items
-
Mon, Aug 176:00 pm12 items
-
Mon, Jul 206:00 pm8 items
-
Mon, Jun 156:00 pm