Stormwater and flooding items in City of Durham, between 12 Oct 2025 and 12 Oct 2026
25 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
What these items are about
The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.
Show these numbers as a table
| Subject | Items |
|---|---|
| Stormwater and flooding | 25 |
| Water and sewer | 17 |
| Environment and sustainability | 6 |
| Annexation | 5 |
| Land conversion and large development | 4 |
| Rezoning | 4 |
| Contracts and procurement | 2 |
| Farmland and open space | 2 |
| Housing and affordability | 2 |
| Budget and appropriations | 1 |
| Intergovernmental agreements | 1 |
| Parks and recreation | 1 |
-
Adds $122,533 to White Oak Construction's stormwater contract, raising it to $590,242, with a total cap including contingency of $678,778.30.Contract or award Stormwater and flooding
-
A hearing on annexing Courtyards at Leesville, zoning it Planned Development Residential 3.739 in the Falls/Jordan watershed overlay, and a utility extension agreement with Epcon Communities Carolinas.
-
Adds $339,446 to Hazen and Sawyer's engineering contract for the East Durham water and sewer rehabilitation and Belt Street stormwater project, bringing it to $9,534,423.75.
-
A $339,446 amendment to the Hazen and Sawyer engineering contract for East Durham water and sewer rehabilitation and the Belt Street regional stormwater project, taking it to $9,534,423.75 with a ceiling of $10,098,995.23.
-
A hearing on annexing MIS Durham Headquarters Two, with a utility extension agreement with DTM Properties of Durham and a shift of the light industrial and watershed overlay zoning from county to city jurisdiction.
-
A joint funding agreement with the U.S. Geological Survey to keep the automated rainfall and streamflow monitoring network running. Durham pays $481,350 and the USGS $50,400, for $531,750 in total.
-
A $441,700 contract with Duke's Root Control for inspections of the municipal separate storm sewer system.
-
The council spends $350,000 from the city's watershed protection funds on the Tar River Land Conservancy's Dykes tracts project.
-
Keeps the city's automated rain and stream gauges running. Durham pays $481,350 and the Geological Survey $50,400, for $531,750 in all.
-
A $441,700 contract with Duke's Root Control to inspect the city's separate storm sewer system, which the city's federal permit requires.
-
Spends $350,000 from the city's watershed protection fund on the Tar River Land Conservancy's Dykes Tracts project, which protects land draining into a city water supply.
-
A public hearing and three motions: annex the property, enter a utility extension agreement with the owner, move the land from county to city jurisdiction while keeping its Residential Rural and Falls/Jordan watershed protection designation, and adopt the consistency statement state law requires.
-
A public hearing on annexing Avalon Place Phase 9, with a utility extension agreement with Meritage Homes of the Carolinas. The land keeps its Residential Rural and Falls/Jordan watershed overlay designation on moving into city jurisdiction.
-
A public hearing on annexing Oak Grove Landing, with a utility extension agreement with M/I Homes of Raleigh. The land moves from county Residential Rural and Residential Suburban-20 to city Planned Development Residential at 4.583 units per acre, keeping the Falls/Jordan watershed overlay.
-
A batch of ordinances closing out completed capital projects and reallocating unused funds across general, water/wastewater, stormwater, environmental services, housing, and transit CIP funds, totaling well over $150 million in project value.
-
Public hearing on rezoning land from Residential Suburban-20 (Eno Watershed Overlay) to a planned residential/office development with a utility extension agreement.
-
Adds $194,150 to a drainage structure improvements contract with White Oak Construction Corp., bringing the total to $587,642.Contract or award Stormwater and flooding
-
Authorizes $117,500 from Watershed Protection funds for a conservation easement project.
-
Contract with RES Environmental Operating Company for stream stabilization work on Lakewood Avenue, plus a contingency fund, for a total authorized cost up to about $1.37 million.
-
Public hearing on rezoning property out of Residential Rural/Suburban-20 into Planned Development Residential at a density of 6.573 units/acre, near I-85 within the Falls/Jordan Watershed Overlay.
-
Consent approval of an $8,541,060 contract with Mid-Atlantic Infrastructure Systems for utility and drainage upgrades, plus an $854,106 contingency fund.
-
A $305,864 contract with Dragonfly Pond Works for stormwater control measure maintenance, with a $30,586 contingency fund.Contract or award Stormwater and flooding
-
An $801,679 amendment to the engineering contract for the East Durham water and sewer rehabilitation and Belt Street stormwater project, bringing the total contract to $9.19 million.
-
A $3.95 million amendment to the sanitary sewer flow and rainfall monitoring contract with ADS Environmental Services, bringing the total to $5.25 million.
-
A public hearing to rezone a property from Commercial Center with a development plan to Commercial General with a development plan, within the Falls/Jordan Watershed Protection Overlay.