Stormwater and flooding items in Town of Fuquay-Varina
3 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
-
Consent item on a memorandum of agreement with the state Sedimentation Control Commission.
-
Agreement with the state sedimentation control commission updating erosion and sedimentation control delegation.
-
Staff reviewed CIP projects, rate models, an interbasin transfer update, and stormwater-permit-driven investment needs, raising a stormwater utility fee or a tax increase as funding options.