Stormwater and flooding items in Town of Hillsborough, between 28 Aug 2025 and 28 Aug 2026
5 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
-
Staff proposes merging Public Works, Public Space & Sustainability, and Stormwater & Environmental Services into a new 'Community Services and Sustainability' department, replacing a vacant public works manager position with two lower-level positions, prompted by that manager's resignation.
-
Staff or committee report Stormwater and flooding
-
Capital project ordinance amendment for the Elizabeth Brady Road culvert replacement.
-
The Board of Adjustment granted a floodplain variance for a loading ramp at the Orange County Board of Elections building on South Cameron Street.
-
Orange County asked for a variance to build a concrete loading ramp and associated site work at its Board of Elections facility, within the 1% annual chance flood area regulated by the town's flood damage prevention ordinance. Architect Drew Wilgus represented the applicant.Approved 5-0.