Contracts and procurement items in City of Durham

The first 200 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.

Search and filter
Clear
What these items are about

The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.

Ranked bar chart of the 12 subjects these items carry. Contracts and procurement leads with 316.
Show these numbers as a table
Subjects carried by these items
SubjectItems
Contracts and procurement316
Water and sewer65
Public facilities36
Roads and transportation36
Intergovernmental agreements35
Police and public safety20
Budget and appropriations14
Stormwater and flooding14
Transit10
Environment and sustainability8
Bonds and debt7
Fire and EMS7
  1. Thu, Nov 19 City of Durham · Durham City Council Work Session
    Sunrock Industries LLC would repave city streets for $15,703,504.60 under the 2024 bond program. A $500,000 contingency brings the ceiling to $16,203,504.60.
  2. Thu, Nov 19 City of Durham · Durham City Council Work Session
    Fred Smith Company would build the Hillandale Road sidewalk for $5,198,915. With a $779,837.25 contingency, the project could not exceed $5,978,752.25.
  3. Thu, Nov 19 City of Durham · Durham City Council Work Session
    Slurry Pavers, Inc. would do the city's 2027 pavement preservation work for $7,469,323.97, with a $373,466.19 contingency and a cap of $7,842,790.16.
  4. Thu, Nov 19 City of Durham · Durham City Council Work Session
    GFT Infrastructure, Inc. would provide construction engineering and inspection for the Hillandale Road sidewalk and bike lanes, up to $930,015.25 plus a $50,000 contingency.
  5. Thu, Nov 19 City of Durham · Durham City Council Work Session
    H & H Enterprises of Knightdale, LLC would repair sidewalks for $7,300,000. A $365,000 contingency sets the total cap at $7,665,000.
  6. Thu, Nov 19 City of Durham · Durham City Council Work Session
    A second price amendment with Samet Corporation, up to $1.5 million in construction, would raise the Station 19 contract to $24,914,773. The contingency rises by $15,315 to $767,107, and all modifications are capped at $25,681,880.
  7. Thu, Nov 19 City of Durham · Durham City Council Work Session
    Geograph Industries, Inc. would build the downtown wayfinding signs for $1,030,035, with a $100,000 contingency and a cap of $1,130,035.
  8. Thu, Nov 19 City of Durham · Durham City Council Work Session
    An amendment adds up to $2,053,950 to Bull City Sitework's easement maintenance contract, for a total of no more than $5,913,950.
  9. Mon, Nov 16 City of Durham · Regular City Council Meeting
    Adds $300,000 to Browe Construction Company's street repair contract, bringing it to $4,216,115.
  10. Mon, Nov 16 City of Durham · Regular City Council Meeting
    Interlocal and joint use agreements with Durham County to design, build and run a new emergency operations center, with backup 911 and sheriff's call centers. It sets up a $26,213,600.77 construction fund and a $1,786,399.23 contingency, capped at $28 million.
  11. Mon, Nov 16 City of Durham · Regular City Council Meeting
    Ratifies six festival contracts already under way, totalling $65,000. The largest are Centerfest with the Durham Arts Council at $30,000 and the OUTSOUTH Queer Film Festival with the Carolina Theatre at $15,000.
  12. Mon, Nov 16 City of Durham · Regular City Council Meeting
    Adds $940,912 to HDR's PFAS advisory contract, for a total of $3,043,677. With contingency the ceiling rises to $3,308,795.
  13. Thu, Nov 5 City of Durham · Durham City Council Work Session
    A $250,000 amendment to Browe Construction Company's street maintenance contract, bringing it to $4,166,115, with a ceiling of $4,216,115 including contingency.
  14. Thu, Nov 5 City of Durham · Durham City Council Work Session
    Agreements with Durham County to design, build and run a new Emergency Operations Center at 2422 Broad Street, holding emergency management and backup 911 and sheriff's call centers. The city would set up a $26.2 million construction fund and a $1.8 million contingency, capped at $28 million.
  15. Thu, Nov 5 City of Durham · Durham City Council Work Session
    A $940,912 amendment to HDR Engineering's PFAS consulting contract, raising it to $3,043,677. Contingency rises to $265,118, for a ceiling of $3,308,795.
  16. Mon, Nov 2 City of Durham · Regular City Council Meeting
    A six-year service and system upgrade agreement with Motorola Solutions, FY27 through FY32, for $7,777,420.27.
  17. Mon, Nov 2 City of Durham · Regular City Council Meeting
    Adds $160,000 for October 2026 through September 2027, bringing Eckerd Connects' contract to run adult and dislocated worker programs to $684,000.
    Contract or award Contracts and procurement
  18. Mon, Nov 2 City of Durham · Regular City Council Meeting
    Routine maintenance and emergency repair of generators at Water Management plants and facilities, up to $1,572,174.45.
  19. Thu, Oct 22 City of Durham · Durham City Council Work Session
    The Emergency Communications Department seeks a six-year service and system upgrade agreement with Motorola Solutions running FY27 through FY32, at a total of $7,777,420.27.
  20. Thu, Oct 22 City of Durham · Durham City Council Work Session
    A five-year lease with Provident1898 LLC, worth $760,374.48, would cover office space and memberships at 411 W. Chapel Hill Street, Suite C2. The manager would also be authorized to sign later amendments, extensions and renewals.
  21. Thu, Oct 22 City of Durham · Durham City Council Work Session
    An amendment would add $160,000 to the Eckerd Connects contract for adult and dislocated worker programs, for October 2026 through September 2027. The revised total may not exceed $684,000.
  22. Thu, Oct 22 City of Durham · Durham City Council Work Session
    Gregory Poole Equipment Company would maintain and repair generators at Water Management plants and facilities, under a contract of up to $1,572,174.45.
  23. Mon, Oct 19 City of Durham · Regular City Council Meeting
    Ordinances would carry unspent 2025-26 money and open purchase orders into the 2026-27 budget, the general and housing capital project ordinances and the internal service funds plan. The agenda gives no dollar total.
  24. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A $91,061.10 amendment with GFT Infrastructure, Inc. would raise the LaSalle Street pedestrian design contract to $306,057.34.
  25. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A $157,693.36 amendment with ALTA Planning + Design, Inc. would raise the Cornwallis Road bike and pedestrian design contract to $853,414.17.
  26. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A $122,533 amendment with White Oak Construction Corp. of N.C. would bring the Huntingridge and West Lavender stormwater contract to $590,242, or up to $678,778.30 with contingency.
  27. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A supplemental agreement of up to $643,415 with A1 Consulting Group, Inc., plus a $31,342 contingency, would cover environmental and geotechnical design for parks on old pre-regulatory landfill sites.
  28. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A $547,698 construction contract with The Daniele Company L.L.C., plus an $83,000 contingency, would reconfigure space in City Hall. The council heard a progress report at its October 8 work session.
  29. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A $48,000 amendment would raise Kimley-Horn and Associates' on-call design contract for multimodal work on state-maintained streets to $296,500.
  30. Mon, Oct 19 City of Durham · Regular City Council Meeting
    Kittelson & Associates, Inc. would design Duke-Gregson corridor improvements for $1,575,169, with a $320,000 contingency, for up to $1,895,169.
  31. Mon, Oct 19 City of Durham · Regular City Council Meeting
    Carolina Civilworks Inc. would replace water lines on Duke University Road and N Driver Street for $5,137,531, with a $513,753 contingency, for up to $5,651,284.
  32. Mon, Oct 19 City of Durham · Regular City Council Meeting
    CDM Smith, Inc. would design filtrate and lagoon decant discharge upgrades at the Brown Water Treatment Plant for up to $343,100.
  33. Mon, Oct 19 City of Durham · Regular City Council Meeting
    A $5,162,857 amendment would have McKim & Creed, Inc. finish design, permitting and bidding for tertiary filter replacement at the South Durham Water Reclamation Facility. The contract would rise to $6,688,857, and to $7,205,143 with contingency.
  34. Thu, Oct 8 City of Durham · Durham City Council Work Session
    Amends the 2026-27 budget, the general and housing capital project ordinances and the internal service funds plan to carry over unspent money and open purchase orders from last year.
  35. Mon, Oct 5 City of Durham · Regular City Council Meeting
    Renews state lobbying with Checkmate Government Relations for up to $480,000 and federal lobbying with The Ferguson Group of Washington for up to $346,000.
  36. Mon, Oct 5 City of Durham · Regular City Council Meeting
    A $119,044.11 change order with Sutphen Corporation of Amlin, Ohio, for modifications to three custom pumper trucks bought through a cooperative purchasing contract.
  37. Mon, Oct 5 City of Durham · Regular City Council Meeting
    Adds $143,800 to Kimley-Horn's design contract for structural repairs to city parking decks, raising it to $815,600, with a $43,300 contingency.
  38. Mon, Oct 5 City of Durham · Regular City Council Meeting
    Hires Gallagher Benefit Services for up to $399,700 to study city pay and job classifications.
    Contract or award Contracts and procurement
  39. Mon, Oct 5 City of Durham · Regular City Council Meeting
    An interlocal agreement with Raleigh to buy bus mobile ticketing software and hardware jointly.
  40. Thu, Sep 24 City of Durham · Durham City Council Work Session
    Lobbying contracts renewed: up to $480,000 with Checkmate Government Relations for state work and up to $346,000 with The Ferguson Group for federal.
  41. Thu, Sep 24 City of Durham · Durham City Council Work Session
    A $119,044.11 change order with Sutphen Corporation on three custom pumper fire trucks.
  42. Thu, Sep 24 City of Durham · Durham City Council Work Session
    A $143,800 amendment to the Kimley-Horn design agreement for structural maintenance of parking facilities, taking the contract to $815,600 with a ceiling of $858,900.
  43. Thu, Sep 24 City of Durham · Durham City Council Work Session
    A compensation and classification study of city jobs by Gallagher Benefit Services, up to $399,700.
  44. Thu, Sep 24 City of Durham · Durham City Council Work Session
    The Neighborhood Compass data portal contract moves from Neighborhood Data Works, which is dissolving, to UNC Chapel Hill. The ceiling stays $581,624.45 and the remaining $243,010 goes to the university.
  45. Thu, Sep 24 City of Durham · Durham City Council Work Session
    An interlocal agreement with Raleigh to buy bus mobile ticketing software and hardware together.
  46. Thu, Sep 24 City of Durham · Durham City Council Work Session
    A $339,446 amendment to the Hazen and Sawyer engineering contract for East Durham water and sewer rehabilitation and the Belt Street regional stormwater project, taking it to $9,534,423.75 with a ceiling of $10,098,995.23.
  47. Thu, Sep 24 City of Durham · Durham City Council Work Session
    An $11,480,500 construction award to T.A. Loving for the Elizabeth Street waterline replacement, with a $1,155,750.25 contingency and a ceiling of $12,636,250.25.
  48. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A five-year extended service plan with Priority Dispatch Corporation, not to exceed $369,600.
  49. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A $441,700 contract with Duke's Root Control for inspections of the municipal separate storm sewer system.
  50. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A $535,118.40 contract with Dana Safety Supply of Greensboro to up-fit 32 patrol vehicles.
  51. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A $1,623,895.04 contract with Clinton Automotive of Clinton for 32 patrol vehicles.
  52. Thu, Sep 17 City of Durham · Regular City Council Meeting
    Roof and envelope repairs at the Environmental and Street Services administration building, awarded to H. M. Kern Corporation for up to $1,380,000 with a $345,000 contingency, capped at $1,725,000.
  53. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A guaranteed maximum price amendment with LeChase Construction for HVAC work at City Hall and the annex, plus generator and controls, with construction not to exceed $2,410,548 and the revised contract at $7,327,211. The ceiling with contingency is $8,242,292.
  54. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A guaranteed maximum price amendment with the Balfour Beatty and Holt Brothers joint venture for the East End Longmeadow parks project, construction capped at $2,228,822 and the revised contract at $2,715,958.
    Contract or award Contracts and procurement
  55. Thu, Sep 17 City of Durham · Regular City Council Meeting
    Resolutions finding construction manager at risk delivery to be in the city's interest and approving the prequalification process, and a preconstruction services contract with The Christman Company for up to $326,444.
  56. Thu, Sep 17 City of Durham · Regular City Council Meeting
    The city declares two parcels at 700 Colfax Street surplus and accepts offers totaling $4,692 from Jumatatu M. Poe, subject to the upset bid procedure under state law.
  57. Thu, Sep 17 City of Durham · Regular City Council Meeting
    A public art contract with Immersive Material LLC for the Durham Aquatics Center, up to $375,000 with a $20,000 contingency.
  58. Thu, Sep 17 City of Durham · Regular City Council Meeting
    The largest award on the agenda: a design-build contract with CDM Constructors for the Durham water treatment plant under the Jordan Lake Water Supply Program, not to exceed $32,372,123, with a $3,237,212 contingency and a ceiling of $35,609,335. The council also finds design-build delivery to be in the city's interes…
  59. Thu, Sep 17 City of Durham · Regular City Council Meeting
    Improvements to the Downing Creek lift station, awarded to Carolina Civilworks for up to $2,298,065 with a contingency taking the ceiling to $2,527,871.
  60. Thu, Sep 17 City of Durham · Regular City Council Meeting
    Improvements to the Audubon and Glenn View lift stations, awarded to Carolina Civilworks for up to $4,255,556 with a ceiling of $4,681,111.
  61. Thu, Sep 10 City of Durham · Durham City Council Work Session
    A five-year service agreement for the emergency communications department's dispatch software, capped at $369,600.
  62. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Fitting out 32 patrol vehicles through the state sheriffs' contract, $535,118.
  63. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Buying the 32 patrol vehicles themselves, $1,623,895, off the state term contract.
  64. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Roof and building envelope repairs at $1,380,000, with a $345,000 contingency the manager may spend without coming back, to a ceiling of $1,725,000.
  65. Thu, Sep 10 City of Durham · Durham City Council Work Session
    Sets a guaranteed maximum price for HVAC work at City Hall and the annex, plus a generator and controls project, with construction capped at $2,410,548 and the whole construction manager at risk contract at $8,242,292.
  66. Thu, Sep 10 City of Durham · Durham City Council Work Session
    The largest item of the night. Durham would hire CDM Constructors to design and build a water treatment plant for the Jordan Lake Water Supply Program at up to $32,372,123, reaching $35,609,335 with contingency. A companion resolution finds design-build delivery to be in the city's interest.
  67. Tue, Sep 8 City of Durham · Regular City Council Meeting
    An encroachment and easement agreement with Maizon Durham Owner, LLC for 72,395 dollars, with the proceeds deposited to a city account.
    Contract or award Contracts and procurement
  68. Tue, Sep 8 City of Durham · Regular City Council Meeting
    A construction contract for bypass pipe improvements at the Brown Water Treatment Plant, not to exceed 10,370,000 dollars, with a 1,037,000 dollar contingency and change orders capped so the total stays under 11,407,000.
  69. Tue, Sep 8 City of Durham · Regular City Council Meeting
    A contract for the 2026 sewer lining program, not to exceed 9,728,200 dollars, with a contingency of up to 972,800 and a total cap of 10,701,000.
  70. Tue, Sep 8 City of Durham · Regular City Council Meeting
    An engineering services amendment adding up to 1,819,090 dollars, raising the contract to 2,997,990, with contingency taking the ceiling to 3,182,100.
  71. Mon, Aug 17 City of Durham · Regular City Council Meeting
    A five-year agreement with Priority Dispatch Corporation, up to $509,694, for quality reviews.
  72. Mon, Aug 17 City of Durham · Regular City Council Meeting
    A $473,817 contract with AECOM for storm sewer permit support, capped at $525,937 with contingency.
  73. Mon, Aug 17 City of Durham · Regular City Council Meeting
    Adds $861,244 to RND Architects' design contract for roof and envelope repairs, for a total of $1,196,519.
  74. Mon, Aug 17 City of Durham · Regular City Council Meeting
    A contract of up to $973,850 for easement acquisition on utility projects, $1,071,235 with contingency.
  75. Mon, Aug 17 City of Durham · Regular City Council Meeting
    An interlocal agreement for the partnership's raw water intake facility. The agenda gives no cost.
  76. Mon, Aug 17 City of Durham · Regular City Council Meeting
    A $442,100 contract to rehabilitate the Huckleberry water tank, $486,310 with contingency.
  77. Mon, Aug 3 City of Durham · Regular City Council Meeting
    A $1,910,626 contract with Axis Utility for stormwater work on Acadia and Hammond, $2,197,219.90 with contingency.
  78. Mon, Aug 3 City of Durham · Regular City Council Meeting
    A $1,528,346 stormwater contract with White Oak Construction, $1,757,597.90 with contingency.
  79. Mon, Aug 3 City of Durham · Regular City Council Meeting
    Repeals Chapter 18 of the City Code, the Equal Business Opportunity Program for city contracting. The agenda says the repeal is to comply with Session Law 2026-41, enacted July 7, 2026.
  80. Mon, Aug 3 City of Durham · Regular City Council Meeting
    Adds $1,957,594.69 to Turner & Townsend Heery's project management contract, for a total of $10,420,163.69.
    Contract or award Contracts and procurement
  81. Mon, Aug 3 City of Durham · Regular City Council Meeting
    Adds $610,985.93 to Tyler Technologies' Munis ERP contract, for a total of $6,597,598.15.
  82. Mon, Aug 3 City of Durham · Regular City Council Meeting
    A $501,500 contract for water tank engineering and inspections, $551,650 with contingency.
  83. Mon, Aug 3 City of Durham · Regular City Council Meeting
    Adds $1,314,200 to Highfill's lift station contract, for a total of $3,868,400.
  84. Mon, Aug 3 City of Durham · Regular City Council Meeting
    A $997,000 engineering contract for the Ellerbe Creek sewer outfall.
  85. Mon, Aug 3 City of Durham · Regular City Council Meeting
    A $3,493,900 engineering contract for the Lick Creek sewer outfall, $3,843,290 with contingency.
  86. Mon, May 4 City of Durham · Regular City Council Meeting
    The city sets up a design-build contract, worth up to about $1.4 million with contingency, to upgrade HVAC systems at the Durham Armory.
  87. Mon, May 4 City of Durham · Regular City Council Meeting
    The city adds about $9.1 million to its enterprise software contract with IBM, bringing the total to nearly $14.9 million.
  88. Mon, May 4 City of Durham · Regular City Council Meeting
    The city extends engineering services for a raw-water pump station project, bringing the contract to nearly $8.9 million.
  89. Mon, May 4 City of Durham · Regular City Council Meeting
    The city hires an engineering firm for sewer-line assessments near the Duke Golf Course and Lick Basin.
  90. Mon, May 4 City of Durham · Regular City Council Meeting
    The city hires an engineering firm to design upgrades to a pump station serving the southeast pressure zone.
  91. Mon, Apr 20 City of Durham · Regular City Council Meeting
    Authorizes the city manager to sign an agreement with Durham County to jointly fund consulting work on the city's homeless strategic framework.
  92. Mon, Apr 20 City of Durham · Regular City Council Meeting
    Authorizes an interlocal agreement with Durham County to jointly plan, design, and share a fire/EMS station in southern Durham County.
  93. Mon, Apr 6 City of Durham · Regular City Council Meeting
    Ratifies a one-year interlocal agreement with Durham County for sharing sales tax revenue and authorizes the city manager to execute it.
  94. Mon, Apr 6 City of Durham · Regular City Council Meeting
    Authorizes a virtual auction of city surplus property for May 17, 2026.
  95. Tue, Jan 20 City of Durham · Regular City Council Meeting
  96. Tue, Jan 20 City of Durham · Regular City Council Meeting
    Authorizes up to $2,000,000 to Durham Tech for street and right-of-way improvements near its new Health Sciences Building.
  97. Tue, Jan 20 City of Durham · Regular City Council Meeting
    Contract with CorVel Enterprise Claims for workers' comp and liability claim administration, not to exceed $630,000 over three years.
    Contract or award Contracts and procurement
  98. Tue, Jan 20 City of Durham · Regular City Council Meeting
    Reauthorizes the joint city-county Bicycle and Pedestrian Advisory Commission.
  99. Dec 1, 2025 City of Durham · Regular City Council Meeting
    Enterprise licensing agreement with Esri for GIS software, not to exceed $2.09 million.
    Contract or award Contracts and procurement
  100. Nov 17, 2025 City of Durham · Regular City Council Meeting
    Consent approval of an amendment setting a January 1, 2026 expiration date for the City-County Appearance Commission interlocal agreement.
  101. Sep 15, 2025 City of Durham · Regular City Council Meeting
    The council considered a construction-manager-at-risk contract for preconstruction services on the bond-funded East End and Long Meadow Parks project, not to exceed $535,849.60 including a contingency fund.
  102. Sep 15, 2025 City of Durham · Regular City Council Meeting
    The council considered a design contract of up to $5.23 million including contingency for the East End and Long Meadow Parks bond project.
  103. Sep 15, 2025 City of Durham · Regular City Council Meeting
    The council considered two contracts with Eckerd Youth Alternatives (Eckerd Connects) totaling $664,000 to run WIOA adult and dislocated-worker services and NCWorks Career Center operations.
    Contract or award Contracts and procurement
  104. Sep 15, 2025 City of Durham · Regular City Council Meeting
    The council considered a three-year renewal of the city's Cityworks software license and maintenance agreement for up to $558,464.43.
    Contract or award Contracts and procurement
  105. Sep 15, 2025 City of Durham · Regular City Council Meeting
    The council considered a $250,000 contract with The SpyGlass Group to audit the city's primary telecommunications accounts.
  106. Aug 4, 2025 City of Durham · Regular City Council Meeting
    The consent agenda included a six-month contract with InfoSend Inc. for print and mail services, up to $908,364, with the option to renew.
    Contract or award Contracts and procurement
  107. Aug 4, 2025 City of Durham · Regular City Council Meeting
    The consent agenda included a $80,238.82 amendment to the Cornerstone OnDemand learning management contract, a three-year pre-employment background screening contract with TruView BSI up to $315,000, an athletic booking agent contract with Fun2Ref up to $183,240, and a $131,400 contract with National Testing Network f…
  108. Aug 4, 2025 City of Durham · Regular City Council Meeting
    The consent agenda included a $9,267,646 amendment to the Next Generation Enterprise Resource Planning implementation contract with Applications Software Technology LLC, for a revised total not to exceed $15,067,646.
  109. Jun 16, 2025 City of Durham · Regular City Council Meeting
  110. Jun 16, 2025 City of Durham · Regular City Council Meeting
  111. Jun 16, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  112. Jun 16, 2025 City of Durham · Regular City Council Meeting
  113. Jun 16, 2025 City of Durham · Regular City Council Meeting
    A rewrite of the rules that steer city contracting toward small local firms.
  114. Jun 16, 2025 City of Durham · Regular City Council Meeting
  115. Jun 16, 2025 City of Durham · Regular City Council Meeting
  116. Jun 16, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  117. Jun 16, 2025 City of Durham · Regular City Council Meeting
  118. Jun 16, 2025 City of Durham · Regular City Council Meeting
  119. Jun 16, 2025 City of Durham · Regular City Council Meeting
  120. Jun 16, 2025 City of Durham · Regular City Council Meeting
  121. Jun 16, 2025 City of Durham · Regular City Council Meeting
  122. Jun 16, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  123. Jun 2, 2025 City of Durham · Regular City Council Meeting
  124. Jun 2, 2025 City of Durham · Regular City Council Meeting
    A contract for pre-employment psychological testing of police recruits.
  125. Jun 2, 2025 City of Durham · Regular City Council Meeting
    A contract for post-hire psychological services for police officers.
  126. Jun 2, 2025 City of Durham · Regular City Council Meeting
    An electronic waste recycling contract with Powerhouse Recycling.
  127. Jun 2, 2025 City of Durham · Regular City Council Meeting
  128. Jun 2, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  129. Jun 2, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  130. Jun 2, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  131. Jun 2, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  132. May 19, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  133. May 19, 2025 City of Durham · Regular City Council Meeting
  134. May 19, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  135. May 19, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  136. May 19, 2025 City of Durham · Regular City Council Meeting
    An interlocal agreement with Durham County for joint public work.
  137. May 19, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  138. May 19, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  139. May 8, 2025 City of Durham · City Council Work Session
    Contract or award Contracts and procurement
  140. May 8, 2025 City of Durham · City Council Work Session
  141. May 8, 2025 City of Durham · City Council Work Session
    Contract or award Contracts and procurement
  142. May 8, 2025 City of Durham · City Council Work Session
    Contract or award Contracts and procurement
  143. May 8, 2025 City of Durham · City Council Work Session
  144. May 8, 2025 City of Durham · City Council Work Session
    Contract or award Contracts and procurement
  145. May 8, 2025 City of Durham · City Council Work Session
    Contract or award Contracts and procurement
  146. Apr 7, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  147. Apr 7, 2025 City of Durham · Regular City Council Meeting
    Funding for the Stagville memorial public art project.
  148. Apr 7, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  149. Mar 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  150. Mar 17, 2025 City of Durham · Regular City Council Meeting
    A contract for public art at Birchwood Park.
  151. Mar 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  152. Mar 17, 2025 City of Durham · Regular City Council Meeting
  153. Mar 17, 2025 City of Durham · Regular City Council Meeting
  154. Mar 17, 2025 City of Durham · Regular City Council Meeting
  155. Mar 17, 2025 City of Durham · Regular City Council Meeting
  156. Mar 17, 2025 City of Durham · Regular City Council Meeting
  157. Mar 3, 2025 City of Durham · Regular City Council Meeting
    A performance audit of the city's procurement card use.
  158. Mar 3, 2025 City of Durham · Regular City Council Meeting
  159. Mar 3, 2025 City of Durham · Regular City Council Meeting
  160. Mar 3, 2025 City of Durham · Regular City Council Meeting
    A second amendment to the contract with RATP Dev USA, which operates the bus system.
    Contract or award Contracts and procurement
  161. Mar 3, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  162. Mar 3, 2025 City of Durham · Regular City Council Meeting
  163. Mar 3, 2025 City of Durham · Regular City Council Meeting
  164. Mar 3, 2025 City of Durham · Regular City Council Meeting
  165. Mar 3, 2025 City of Durham · Regular City Council Meeting
  166. Feb 17, 2025 City of Durham · Regular City Council Meeting
    An interlocal agreement on how sales tax is distributed between the city and county.
  167. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  168. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  169. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Ratifying five festival and event contracts for 2025.
    Contract or award Contracts and procurement
  170. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  171. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  172. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  173. Feb 17, 2025 City of Durham · Regular City Council Meeting
  174. Feb 17, 2025 City of Durham · Regular City Council Meeting
  175. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  176. Feb 17, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  177. Feb 17, 2025 City of Durham · Regular City Council Meeting
  178. Feb 17, 2025 City of Durham · Regular City Council Meeting
  179. Feb 3, 2025 City of Durham · Regular City Council Meeting
  180. Feb 3, 2025 City of Durham · Regular City Council Meeting
    A contract for site evaluation and identification for the algal project.
    Contract or award Contracts and procurement
  181. Feb 3, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  182. Jan 6, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  183. Jan 6, 2025 City of Durham · Regular City Council Meeting
    Contract or award Contracts and procurement
  184. Dec 2, 2024 City of Durham · Regular City Council Meeting
    Acceptance of $750,000 in Durham County recovery funds for digital equity work, with an interlocal agreement and a grant project ordinance superseding an earlier one.
  185. Dec 2, 2024 City of Durham · Regular City Council Meeting
    A joint agreement with Durham County covering up to $500,000 in program grants and $127,500 in administrative and outreach reimbursements for the Low-Income Homeowner's Relief Program.
  186. Dec 2, 2024 City of Durham · Regular City Council Meeting
    An additional $267,508.66 in engineering services, raising the contract to $2,150,615.87, with contingency raised to $159,409.78 and a ceiling of $2,310,025.65.
  187. Dec 2, 2024 City of Durham · Regular City Council Meeting
    A construction contract with Moffat Pipe, Inc. not to exceed $20,355,978, with a $2,035,597 contingency fund and a modification ceiling of $22,391,575.
  188. Dec 2, 2024 City of Durham · Regular City Council Meeting
    An additional $1,365,600 in engineering services, raising the contract to $1,528,300, with contingency to $152,700 and a ceiling of $1,681,000.
  189. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A second amendment adding $150,000 to the city's Spanish language access contract, raising it to $270,000.
  190. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A guaranteed maximum price amendment with Samet Corporation and W.C. Construction Company, a joint venture, capping construction at $21,860,400 for a revised construction manager at risk contract of $21,950,402, with $962,151 in contingency and a modification ceiling of $22,912,553.
  191. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A finding that design-build is in the city's interest for a columbarium at Beechwood Cemetery, a $17,500 preliminary design and preconstruction contract, and authority to amend for construction up to $157,500, for $175,000 in all with $5,000 contingency and a $180,000 ceiling.
  192. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A janitorial contract for the Durham Armory with Top Notch Carpet & Upholstery Cleaning, LLC, not to exceed $129,000.
  193. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A stream vegetation management contract for $76,111 with a 15 percent contingency of $11,417, capped at $87,528.
  194. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A storm sewer inspection contract with Vision NC, LLC for $229,900.
  195. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A one-year renewal with Duke's Root Control, Inc. for $371,600, bringing the contract to $1,510,150.
  196. Nov 18, 2024 City of Durham · Regular City Council Meeting
    An additional $183,827 with White Oak Construction Corp of N.C., bringing the contract to $557,796 and the ceiling with remaining contingency to $613,891.
  197. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A contract with Parkmobile for pay-by-phone parking payments.
  198. Nov 18, 2024 City of Durham · Regular City Council Meeting
    A construction contract not to exceed $1,172,653.10 with $117,265 contingency and a ceiling of $1,289,918.10.
  199. Nov 4, 2024 City of Durham · Regular City Council Meeting
    The council would authorize a virtual auction of city surplus property for December 8, 2024.
  200. Oct 21, 2024 City of Durham · Regular City Council Meeting
    Authorizes a $799,204.38 contract with Motorola Solutions to upgrade the TDMA system behind the city's public safety portable and mobile radios.