Fees and utility rates items in Town of Fuquay-Varina, between 12 Oct 2025 and 12 Oct 2026
18 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
What these items are about
The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.
Show these numbers as a table
| Subject | Items |
|---|---|
| Fees and utility rates | 18 |
| Roads and transportation | 8 |
| Subdivision and site plans | 8 |
| Parks and recreation | 7 |
| Water and sewer | 2 |
| Bonds and debt | 1 |
| Budget and appropriations | 1 |
| Environment and sustainability | 1 |
| Public facilities | 1 |
| Stormwater and flooding | 1 |
| Tax rate and revaluation | 1 |
-
A payment in lieu of roadway improvements for the Guthrie's development.
-
The 2026-27 operating budget, fee schedule, five-year operating and capital plan and pay and classification schedule. The $10 million Hilltop Needmore Town Park line breaks down as $2.5 million for two baseball fields, $2.5 million for the Armed Services Memorial, $2 million for dam repairs and $500,000 for soccer fie…
-
Public hearing on an analysis of the town's wastewater system development fees.
-
Accepts a recreation fee in place of land dedication for the Betts Farm Estates subdivision.
-
Sets a landscape establishment permit fee in the town code.
-
Accepts a roadway fee in place of improvements for the Duke Energy substation expansion project.
-
Accepts a roadway fee in place of improvements for the Randall Farms subdivision.
-
Consent item accepting a recreation fee-in-lieu payment for the Randall Farms subdivision (SUB-CD-2025-11).
-
Staff present a proposed increase to parking violation fees under the town's parking regulations.
-
Consent item accepting a recreation fee-in-lieu payment for the Arbor Preserve subdivision (SUB-CD-2025-03).
-
Consent item accepting a roadway fee-in-lieu payment for the Arbor Preserve subdivision.
-
Consent item accepting a roadway fee-in-lieu payment for the Southland Preserve subdivision.
-
Staff reviewed CIP projects, rate models, an interbasin transfer update, and stormwater-permit-driven investment needs, raising a stormwater utility fee or a tax increase as funding options.
-
Staff covered the recreation fee-in-lieu formula, Library Park renovation concepts, naming of a new park near Willow Springs Elementary, a hospitality-tax grant for Fleming Loop Park turf, South Park Community Center renovation options, and five-year capital project prioritization.Board directed hiring a consultant to reassess the fee-in-lieu formula, chose the higher-cost South Park renovation concept for public input, named the new park 'Kennebec Road Park,' and prioritized…
-
Staff presented cost estimates for shade structures in parks and downtown, ranging from about $5,500 per bench to $337,000 for a full park installation.Board agreed the cost-to-benefit ratio doesn't warrant pursuing shade structures over other priorities.Discussion item Fees and utility rates
-
Consent item accepting a recreation fee-in-lieu payment for the Harvest District subdivision.
-
Accepts $305,731.43 from the Harvest District subdivision in place of building roadway and greenway improvements.Approved $305,731.43, unanimously
-
Accepts $552,476.07 from the NC 42 Highway project in place of building roadway improvements.Approved $552,476.07, unanimously
Download these items as CSV Where else this comes up
Follow this
These links carry the filters above. Put one in a feed reader or a calendar and it keeps answering the same question as new meetings are collected — no account, and nothing about you is stored.