Water and sewer items in Town of Hillsborough
46 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
What these items are about
The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.
Show these numbers as a table
| Subject | Items |
|---|---|
| Water and sewer | 46 |
| Budget and appropriations | 13 |
| Land conversion and large development | 5 |
| Public facilities | 5 |
| Stormwater and flooding | 5 |
| Annexation | 4 |
| Intergovernmental agreements | 4 |
| Subdivision and site plans | 4 |
| Fees and utility rates | 3 |
| Housing and affordability | 3 |
| Appointments and personnel | 2 |
| Bonds and debt | 2 |
-
The town's first formal annexation policy would rule out annexing land beyond the Urban Service Boundary adopted in November 2025. Inside that boundary, an owner who wants a water or sewer extension would have to request annexation, as would an owner seeking a new connection where the land abuts town limits and existi…
-
The board sets topics for two budget retreats replacing the January and February workshops: tourism funding, housing, the legislative agenda, rate guidance, the strategic plan and the rewrite of the Unified Development Ordinance. The June forecast assumed no property tax or stormwater fee increase for fiscal 2028 and…
-
Hearing on changing the rule that public utility structures sit at least 100 feet from the property line. Staff say the setback has stalled or raised the cost of chemical storage upgrades at the Adron F. Thompson Water and Sewer Facility, and that buffer rules already screen neighbors.
-
Starlight Construction, LLC would extend public water and sewer to 13 four-bedroom homes off Oakdale Drive, reserving 3,900 gallons a day. The town would take ownership of about 820 feet of water main, 1,250 feet of sewer main and eight manholes.
-
The town would take over 3,750 feet of water main and about 2,935 feet of sewer serving 78 houses and 6 townhomes. Staff value the assets at $576,750 for water and $496,788 for sewer; streets and stormwater are not included.Approved 4-0 on consent
-
The period for audience comments on matters not on the agenda. Nobody spoke.No speakers
-
5.A Upper Neuse River Basin Association – Appointment of Heather Fisher as Secondary Alternate DirectorHeather Fisher is appointed secondary alternate director to the Upper Neuse River Basin Association.Approved 4-0
-
A resolution approves the town's 2025 local water supply plan, which state law requires each public water provider to file annually.Approved on consent 4-0Resolution Water and sewer
-
The town accepts the waterline built at 420 West Tryon Street.Approved on consent 4-0Consent agenda Water and sewer
-
Contract extending water and sewer service to Altera Meadowlands, a new large multifamily development, including town acceptance of about 57 feet of 12-inch water main, 106 feet of 8-inch water main, 721 feet of 8-inch sewer main, and 7 manholes, at a requested capacity of 35,700 gallons per day.
-
Routine budget amendments and transfers on the consent agenda.Approved on the consent agenda 4-0
-
Authorizes the town manager to sign a water and sewer extension contract for the Orange County Crisis Diversion Facility, a new 16-room mental health facility on Waterstone Drive, adding about 711 feet of 8-inch water main and 567 feet of 8-inch sewer main to the town's system at a requested capacity of 2,400 gallons…Approved on the consent agenda 4-0
-
Budget amendments and transfers covered items including a $280,046 transfer to the sodium hypochlorite conversion project and adjustments to interest earnings and department line items across the general and water and sewer funds.
-
Amended the Sodium Hypochlorite Conversion capital project ordinance, raising its budget from $454,453 to $615,600.
-
Approved a water and sewer extension contract with developer SFTEN, LLC for Collins Ridge Phase II, covering 79 single-family lots and 36 townhome units and the water main and sewer extensions to serve them.
-
Approved an encroachment and escrow agreement letting Mark Garbick and Lauren Roussel, who are developing 183 Faribault Lane, close a section of the town's Riverwalk for one week to install a sewer tap needed because the property lacks sewer frontage on Faribault Lane.
- Pin 9864950215 · Garbrick Mark
-
Town Manager Eric Peterson presented the Fiscal Year 2027-29 recommended budget. It holds the property tax rate steady for FY2027, recommends a 7.5% increase in both water and sewer rates, includes the final installment of a phased stormwater-fee increase, and proposes merit raises of 3-5% plus a $1,000 cost-of-living…
-
New capital project ordinance funding dam repairs at the West Fork Eno Reservoir.Ordinance Water and sewer
-
Budget ordinance amendment for the water treatment plant's conversion to sodium hypochlorite disinfection.
-
Budget ordinance amendment for a sewer outfall upgrade project.
-
Budget ordinance amendment for a sewer pump station upgrade project.
-
Written staff reports in the packet, including a Utilities Department status update noting that during a public plant tour, citizens asked staff about PFAS, data centers, and fluoride in the water supply.
-
Bond order and series resolution authorizing up to $8,500,000 in water and sewer revenue bonds for the Thompson Building renovation and expansion project.
-
USDA Rural Development loan obligation for water treatment plant disinfection system improvements.
-
Board discusses the town's water and sewer rate structure.
-
Amends town code Section 14-60 governing utility extensions outside town limits.Ordinance Water and sewer
-
A routine batch of budget amendments would adjust revenue and expenditure lines across the general and water/sewer funds, including a generator replacement for the police department and several engineering studies for water and sewer projects.
-
Budget Director Emily Bradford would preview a six-year capital plan built from department requests not yet matched to funding, covering park and greenway projects, a new fire station and two fire trucks, and water, sewer and stormwater work including the Bellevue Mill Interceptor upgrade.
-
Staff would preview noteworthy capital, personnel and operating requests and warn the board that large deficits are expected in the general, water and sewer funds for fiscal 2027 and beyond. The board would also weigh a 9% health insurance premium increase that adds a $200 monthly subsidy for GLP-1 medication.
-
Hooper Schultz said Engineering Services Manager Bryant Green briefed the Planning Board on water and sewer capacity for future development, and that he will succeed Frank Casadonte as Planning Board chair.
-
Engineering Services Manager Bryant Green briefed the board on the town's water and sewer system, including treatment plant capacity, the Eno River water supply, the town's 42 to 43 pump stations, infrastructure debt, damage from Tropical Storm Chantal, the town's reduced Urban Service Boundary, and developer proffers…No action takenPresentation Water and sewer
-
A resolution to revise the urban service boundary, which defines where town utilities and future annexation can extend.
-
The board considered extending town water service to a proposed 49-home subdivision on N.C. 86 North. Staff said extending water would conflict with the plan to reduce the urban services boundary; the developer said its own well could serve the homes but a town connection could create a beneficial loop in the water sy…The board voted 5-0 not to extend water service, keeping the urban services boundary reduction plan intact.
-
Freese and Nichols recommended replacing the 1936, 200,000-gallon Hasell Street tank with a 500,000-gallon spheroid tank for an estimated $4.25 million. It also recommended replacing 1.5 miles of 12-inch asbestos cement main on U.S. 70A with 16-inch ductile iron along the south side, estimated at $5.16 million. State…Presentation Water and sewer
-
Hazen and Sawyer presented a state-funded master plan that projects 15 years of growth and maps upgrades through 2040. A dashboard of project sheets and cost estimates is meant to feed the 2027 budget.
-
Orange County's planning director briefed the board on interlocal planning agreements, wastewater capacity constraints, and the county's comprehensive plan update, now projected for winter 2026-27 adoption.
-
5.C Ordinance Amending Chapter 14 Article 3 – Modify Town and Customer Sewer Lateral ResponsibilitiesThe town would take ownership of existing sewer laterals between the main and the right-of-way or easement where no cleanout marks the boundary, and repair them when they fail. Staff estimate three to six such failures a year at $2,000 to $15,000 each.Approved 5-0 on consentOrdinance Water and sewer
-
A replacement water and sewer extension contract with 640 Meadowlands Drive, LLC for the Tryon III flex space project at U.S. 70A and Meadowlands Drive. The 2023 contract expires in November, and Habitat for Humanity's Auman Village project will now build the lines Tryon III connects to.Approved 5-0 on consent
-
Staff's presentation for the county commissioners on Orange County's 2050 land use plan. It says some county recommendations rely on utility capacity the town is unwilling or unable to supply, and that density just outside town would worsen traffic and Falls Lake nutrient limits.Board members supported staff's approach
-
Budget changes since adoption, mostly drawing on fund balance. The largest is $698,000 in water and sewer fund Tropical Storm Chantal expenses; another puts $150,000 toward generators at the police headquarters and annex.Approved 4-0 on consent
-
TMTLA Associates wants to annex 14.13 acres on Oakdale Drive, zoned R-20, for a 16-lot subdivision. The developer would extend a sewer outfall and has offered money toward upgrading the Rhonda Road pump station.Applicant allowed to proceed with a formal annexation application, 4-0
- Pin 9863-68-0014 · Geiger Edward T Et Al
- Pin 9863-67-2966 · Geiger Edward T
-
Removes leftover references to meter size from the system development fee code, which now charges by bedrooms or wastewater flow, and deletes an unused appendix.Approved 5-0 on consent
-
7.A Rezoning and development agreement requests from WP East Acquisitions LLC for 1001 Corporate DriveWP East Acquisitions LLC asks to rezone 11.1 acres owned by Duke University Health System from office institutional to multifamily for up to 333 apartments. The development agreement sets 10% of units as affordable for 30 years and includes more than $1.8 million toward sewer improvements.Rezoning approved 5-0; development agreement approved 5-0 with affordability extended to 99 yearsPublic hearing Housing and affordabilityLand conversion and large developmentRezoningWater and sewer
- Pin 9874-61-2327 · Duke University Health System INC
-
The town would take ownership of more water and sewer lines in Collins Ridge Phase 1A, including about 13,100 feet of water main, 7,557 feet of sewer and 68 manholes. Staff value the sewer assets at $2,225,628 and the water assets at $1,477,394.Approved 4-0 on consentOther Water and sewer
-
The first step toward closing an unpaved stretch of South Hasell Street right-of-way that neighbors use as a shared driveway. The town would keep a sewer easement.Adopted 4-0, with a public hearing set for Sept. 22
-
Staff report what has changed since the storm and what 120 community survey responses said about preparedness, communication and boil water notices.