Roads and transportation items in Town of Fuquay-Varina, between 12 Oct 2025 and 12 Oct 2026
47 items. Each one links to the meeting it was on. This is the bottom of every drill-down on this site: whatever a chart says, the items behind it are here to be counted.
Search and filter
What these items are about
The subjects carried by every item this filter selects, not just the ones shown below. Each one narrows the list further.
Show these numbers as a table
| Subject | Items |
|---|---|
| Roads and transportation | 47 |
| Parks and recreation | 10 |
| Public facilities | 10 |
| Budget and appropriations | 8 |
| Fees and utility rates | 8 |
| Subdivision and site plans | 6 |
| Contracts and procurement | 5 |
| Bonds and debt | 3 |
| Comprehensive plan | 3 |
| Police and public safety | 3 |
| Housing and affordability | 2 |
| Tax rate and revaluation | 2 |
-
Closes 17 finished general capital projects and five utility projects. About $3.48 million left in the general projects goes to the Sunset Lake Road, Purfoy Road and Main Street intersection, Hilltop Needmore Town Park and Piney Woods Town Park. About $2 million left in utility projects is also reallocated.
-
A payment in lieu of roadway improvements for the Guthrie's development.
-
An ordinance lowering the speed limit on Bridge Street between Northwest Judd Parkway and NC 42.
-
A master encroachment agreement with Google Fiber for work in town rights of way.
-
VIII Upcoming EventsStaff list five upcoming events: a ribbon cutting on the Alston Ridge Greenway Trail, FM2FV concerts on September 17 and September 24, and the two-day Celebrate FV festival October 1 and 3.
-
Budget amendment BA-27-05 carries $1,397,647 of FY2026 encumbrances into FY2027 so the town can settle existing purchase orders. The split is $1,131,517 from Powell Bill fund balance for an unfinished street resurfacing project, $204,568 from general fund balance, and $61,562 from utility fund balance.Approved 5-0 on consent
-
8.D Road Closure Request - First Friday Event, September 4, 2026 - Fuquay-Varina Downtown AssociationConsent agenda Roads and transportation
-
Announces upcoming events including the Alston Ridge Greenway Trail ribbon cutting (September 3), a series of FM2FV outdoor concerts, a Food Truck Rodeo (September 13), and Celebrate FV events (October 1 and 3).
-
Consent agenda Roads and transportation
-
11.A Manager's ReportThe planning department recorded 694 residential lots created in the 2026 financial year. Public works filed the Powell Bill certification after adding 5.64 miles of street, bringing the town to 188.4 miles. The state budget now law imposes a moratorium on interbasin transfers from the Cape Fear but exempts certificat…Staff or committee report Budget and appropriationsHousing and affordabilityRoads and transportationWater and sewer
- 816 N Main St · 1.1 acres · Rajkaran Investments LLC
-
A no parking, stopping or standing ordinance covering the North Lakes subdivision, written street by street. The board first adopted eleven streets, leaving out Price Lake Way, then reconsidered and added Fuquay-Varina Parkway between Nantahala Lake Way and Old Honeycutt Road, on the argument that leaving it open woul…
-
Budget amendment for the FY26 street resurfacing project.
-
Resolution authorizing condemnation of property needed for the Sunset Lake Road widening project.Consent agenda Roads and transportation
-
Request to exempt the Everlasting Life Church development on Dwight Rowland Road from roadway improvement requirements.
- 6835 Dwight Rowland Rd · 3.0 acres · Everlasting Life Christian Church
-
Nineteen residents spoke: fourteen against proposed improvements to Hilltop Needmore Town Park, two on housing affordability, and three on high school parking in the North Lakes subdivision. Every board member responded from the dais.
-
A hearing on the second amendment to the town's 2040 transportation plan.
-
Accepts a roadway fee in place of improvements for the Duke Energy substation expansion project.
-
Accepts a roadway fee in place of improvements for the Randall Farms subdivision.
-
Selects three firms for a two-year on-call construction engineering and inspection services agreement.
-
Staff present a proposed increase to parking violation fees under the town's parking regulations.
-
First reading of an amendment to the 2040 Comprehensive Transportation Plan; no vote yet.
-
Public hearing and recommendation on Land Development Ordinance Amendment #31, ahead of Board of Commissioners action.
-
Public hearing and recommendation on an amendment to the 2040 Comprehensive Transportation Plan.
-
Staff reviewed four FY25 capital projects under construction or design: the Action Park parking lot, a shelter replacement at Library Park, HNTP trail improvements, and the Alston Ridge Greenway.
-
VIII FY26 ProjectsStaff previewed five FY26 capital projects: a South Park Community Center design and renovation, a Willow Spring Park master plan, Banks Road baseball field lighting, Action Park field lighting, and a South Lakes Greenway trail bridge replacement.
-
Budget amendment funding downtown generational-plan projects and a downtown rail study.
-
Awards a $433,900 contract for downtown pedestrian-crossing improvements, funded partly by two budget/project accounts.
-
11.A Manager's ReportTown manager's report to the board.
-
Status update on FY25 projects: Action Park parking lot design/construction, Library Park design, HNTP trail improvements, and the Alston Ridge Greenway.
-
Status update on FY26 projects: South Park Community Center design/renovation, Willow Spring Park master plan, Banks Road baseball field lighting, Action Park field lighting, and a South Lakes Greenway trail bridge replacement.Staff or committee report Budget and appropriationsParks and recreationPublic facilitiesRoads and transportation
-
Consent item accepting a roadway fee-in-lieu payment for the Arbor Preserve subdivision.
-
Consent item accepting a roadway fee-in-lieu payment for the Southland Preserve subdivision.
-
Approves a special-event permit, amplified sound permit, and road/parking-lot closures for a March 7 downtown event.
-
Status update on FY25 projects: Action Park parking lot design/construction, Library Park design, HNTP trail improvements, and the Alston Ridge Greenway.
-
VIII FY26 Projects UpdateStatus update on FY26 projects: South Park Community Center design/renovation, Willow Spring Park master plan/design, Banks Road baseball field lights, Action Park field light replacement, South Lakes Greenway trail bridge replacement, and South Park #3 dugouts.
-
Staff reviewed $44 million in completed and $57 million in funded/upcoming transportation projects, plus four cost-ranked unfunded options, and the tax and bond implications of adding new ones.Board chose to complete the existing $57 million portfolio before pursuing new bond-funded projects; removed the Holland Road/Purfoy Road intersection project in favor of Sunset Lake Phase II overrun…
-
Staff revisited the four highest cost-ranked transportation projects and a downtown streetscape project on S. Fuquay Avenue.Board agreed to advance the W. Academy Street/Railroad project pending a finance impact assessment, and to complete the existing $57 million portfolio before considering new large transportation spen…
-
VIII FY25 ProjectsStatus update on FY25 parks projects: Action Park parking lot, Library Park design, HNTP trail improvements, and Alston Ridge Greenway.
-
Status update on FY26 parks projects including the South Park Community Center design/renovation, Terrible Creek Greenway, Willow Spring Park master plan, Banks Road baseball field lighting, Action Park field lighting replacement, South Lakes Greenway trail bridge replacement, and South Park dugouts.
-
The board considered a town code amendment designating the intersection of Raleigh Street and South Fuquay Avenue as a four-way stop.
-
Consent approval of a project ordinance amendment recognizing transportation bond proceeds for street capital projects.
-
The board awards a contract for the FY26 street resurfacing project.
-
A public hearing on a zoning map amendment for 7601 Purfoy Road, requested by Penny Allen of New Horizon Academy through agent CASCO. REZ-2025-13.
- 7601 Purfoy Rd · 1.9 acres · Purfoy Development LLC
- 7601 Purfoy Rd · 1.9 acres · Purfoy Development LLC
-
Accepts $305,731.43 from the Harvest District subdivision in place of building roadway and greenway improvements.Approved $305,731.43, unanimously
-
Accepts $552,476.07 from the NC 42 Highway project in place of building roadway improvements.Approved $552,476.07, unanimously
-
VIII FY26 ProjectsAn update on the FY26 park project list. Not taken up.
Download these items as CSV Where else this comes up
Follow this
These links carry the filters above. Put one in a feed reader or a calendar and it keeps answering the same question as new meetings are collected — no account, and nothing about you is stored.