Council considers a contract, on the consent agenda, to conduct a study of town utility rates.
-
Speaker : Jamie Revels, Utilities Executive Summary : Cary provided oversize reimbursement in accordance with Standard Procedure 144 to Panther Creek, LLC, which, as part of the Channing Park development, provided Cary with 12-inch and 20-inch reclaimed water mains. Oversize reimbursements allow Cary to compensate dev…
-
Speaker : Jamie Revels, Utilities Executive Summary: The Western Wake Regional Water Reclamation Facility (WWRWRF) is a jointly owned facility serving Cary, Apex, Morrisville, and Wake County’s portion of Research Triangle Park. The WWRWRF was constructed as a regional partnership among Cary, Apex, and Morrisville, wi…
-
Speaker : Jamie Revels, Utilities Executive Summary: Cary maintains a network of flow monitors and rain gauges throughout its wastewater collection system, providing valuable data to track system performance, plan capital improvements, and evaluate available capacity for development. The existing agreement with Vision…
-
Speaker: Jamie Revels, Utilities Executive Summary: Cary’s utility system includes one drinking water treatment facility and three water reclamation facilities, which treat wastewater. The treatment processes at these facilities generate residuals that require management and disposal. Residuals and biosolids are solid…
-
Speaker: Jamie Revels, Utilities Executive Summary: The Cary/Apex Water Treatment Facility (CAWTF) uses sodium hydroxide, also known as caustic soda, to adjust pH as part of the drinking water process. Sodium hydroxide is delivered in bulk tanker trucks at a 50% concentration, with approximately 900 dry tons required…
-
Speaker : Jamie Revels, Utilities Executive Summary: Cary’s automated meter infrastructure (AMI) system, known as Aquastar, uses a combination of advanced water meters and a radio network to remotely collect water meter readings, improving the efficiency and accuracy of the meter-reading process. Cary’s AMI system has…
-
Contract extending water and sewer service to Altera Meadowlands, a new large multifamily development, including town acceptance of about 57 feet of 12-inch water main, 106 feet of 8-inch water main, 721 feet of 8-inch sewer main, and 7 manholes, at a requested capacity of 35,700 gallons per day.
-
Update on utility billing and customer service.
-
Authorizes the town manager to sign a water and sewer extension contract for the Orange County Crisis Diversion Facility, a new 16-room mental health facility on Waterstone Drive, adding about 711 feet of 8-inch water main and 567 feet of 8-inch sewer main to the town's system at a requested capacity of 2,400 gallons…
-
Contract with McGill Environmental Systems for $569,660 to transport and dispose of about 7,000 wet tons per year of Triangle Wastewater Treatment Plant residuals.Contract or award Water and sewer
-
Emergency and scheduled repair contracts for the water collection and distribution system, awarded to Carolina Civilworks ($500,000) and Axis Utility ($145,000).Contract or award Water and sewer
-
Emergency and scheduled repair contracts for the Triangle Wastewater Treatment Plant, awarded to Carolina Civilworks, Neikens Electrical Contracting, and Axis Utility.Contract or award Water and sewer
-
Approves Project Ordinance Amendment POA-27-02 for $6,843,000 and awards a $13,843,000 construction contract to Landmark Structures I, LP for a 1-million-gallon elevated water tank on town-owned land off Wilbon Road. Passed 5-0.Passed 5-0
-
Speaker : Corrie Bondar, Utilities Executive Summary: The Swift Creek Pump Station consists of two pump stations located at a single facility. The original pumping system, commissioned over 35 years ago, operates on 575-volt power. The newer system, added in 2006 to increase station capacity, operates on standard 480-…
-
Presentation Water and sewer
-
Presentation Water and sewer
-
Board considers escalating to Stage II water conservation measures.Discussion item Water and sewer
-
Board considers escalating to Stage II water conservation measures.Discussion item Water and sewer
-
Consent agenda Water and sewer
-
Board considers awarding a construction contract for dam improvements at the Wake Forest Reservoir, following a competitive bid process.
-
Consent agenda Water and sewer
-
Consent agenda Water and sewer
-
Speaker: Jamie Revels, Utilities Executive Summary: The Upper Brier Creek Sewer Rehabilitation Project will rehabilitate 3,475 feet of 36-inch sewer pipe and 14 manholes that are nearing the end of their service lives. The work will take place at the Interstate 40 and Airport Boulevard interchange and within the Aeria…
-
Consent agenda Water and sewer
-
Thu, May 21 Durham County · Board of County Commissioners on 2026-05-21 1:00 PM - Budget Work Session - Day Two26-0275 Sewer Utility (Fee Increase)County engineering staff presented a proposed fee increase for the sewer utility as part of the FY2027 budget discussion.
-
Staff reviewed the 2025 Water Quality Report and updated the council on evolving PFAS drinking water regulations, the Sanford Water Filtration Facility project, and current drought conditions. No council action was required.
-
Increases an engineering services contract for the Triangle Wastewater Treatment Plant expansion study from $547,900 to $935,946, funded from the Sewer Enterprise Fund.
-
Adopts the state-required Local Water Supply Plan for the Rougemont water system, already approved by NC DEQ.Resolution Water and sewer
-
Resolution Water and sewer
-
Staff walked the council through the General Fund, Affordable Housing Fund, debt service, Stormwater Utility Fund, Water and Sewer Fund, and Electric Fund portions of the recommended FY2026-27 budget, including proposed utility rates.
-
An emergency repair authorization for a sewer lift pump serving the Garner Police Department and Fire Administration buildings.
-
The board increases funding for the contractor that repairs the county's sewer collection system to prevent overflows.
-
Proclamation or recognition Water and sewer
-
The county grants Duke Energy an easement to run power to a new county sewer lift station.
-
The board increases funding for engineering study work on expanding the Triangle wastewater treatment plant.
-
The board adopts the state-required water supply plan for the county's Rougemont water system.
-
The city appropriates fund balance to cover an operating shortfall in its water and sewer funds.
-
The city extends engineering services for a raw-water pump station project, bringing the contract to nearly $8.9 million.
-
The city hires an engineering firm for sewer-line assessments near the Duke Golf Course and Lick Basin.
-
The city hires an engineering firm to design upgrades to a pump station serving the southeast pressure zone.
-
The council appoints Judith Miller to a vacant seat on the OWASA board.approved · The Council approved the appointment of Judith Miller to the OWASA Board of Directors effective April 30, 2026.
-
The council authorizes the mayor to send a letter supporting a proposed OWASA policy on reimbursing developers who extend water and sewer lines.adopted · Pass · A motion was made by Council Member McMahon, seconded by Council Member Nollert, to adopt R-3 authorizing the Mayor to transmit comments on a proposed OWASA reimbursement policy. The…Discussion item Water and sewer
-
Staff update the council on development-density expectations and sewer-extension options for the town's southern extraterritorial jurisdiction.received and filed · This matter was received and filed.
-
Ratifies an emergency electrical services agreement at the Apex Water Reclamation Facility.
-
Observance week proclamation, May 3-9, 2026.Proclamation or recognition Water and sewer
-
New capital project ordinance funding dam repairs at the West Fork Eno Reservoir.Ordinance Water and sewer
-
Amendment to the town's contract for wastewater treatment chemical supply.
-
Resolution Water and sewer
-
Fills vacant seats on the Orange Water and Sewer Authority (OWASA) board of directors based on the council interview committee's recommendation.appointed · Pass · The Council re-appointed Susana Dancey and appointed Judith Miller to the Orange Water and Sewer Authority Board of Directors.
-
Multi-year contract to collect wastewater flow data for the town's utility modeling and master planning work, through June 2027.Consent agenda Water and sewer
-
Budget ordinance amendment for the water treatment plant's conversion to sodium hypochlorite disinfection.
-
Budget ordinance amendment for a sewer outfall upgrade project.
-
Budget ordinance amendment for a sewer pump station upgrade project.
-
Written staff reports in the packet, including a Utilities Department status update noting that during a public plant tour, citizens asked staff about PFAS, data centers, and fluoride in the water supply.
-
An update on planning for the town's Southern Extraterritorial Jurisdiction (ETJ), including a sewer-extension report and a request from OWASA, asking council to weigh in on how much residential density the town wants to see there.deferred · This matter was deferred.
-
Council receives a performance audit of the Water Management department's contract management, approved by the Audit Services Oversight Committee in February 2026.Staff or committee report Water and sewer
-
Authorizes sale of up to $218 million in utility system revenue refunding bonds and related legal documents.
-
A batch of ordinances closing out completed capital projects and reallocating unused funds across general, water/wastewater, stormwater, environmental services, housing, and transit CIP funds, totaling well over $150 million in project value.
-
Approves a sole-source bulk purchase of water meters and transmitters from Ferguson Enterprises for about $934,000, for system standardization.
-
Public hearing on rezoning land from Residential Suburban-20 (Eno Watershed Overlay) to a planned residential/office development with a utility extension agreement.
-
Resolution Water and sewer
-
approved · Pass · A motion was made by Chair Karen Howard, seconded by Vice Chair Katie Kenlan, that the ordinance rezoning the property from Residential 1 to Conditional District Light Industrial fo…
-
approved · Pass · A motion was made by Commissioner Amanda Robertson, seconded by Vice Chair Katie Kenlan, that the Goldston Library Renovation Amended Project Ordinance, Courtroom 2A CRAVE A/V Syste…
-
Speaker : Jamie Revels, Utilities Executive Summary: Construction bids received for the Optimist Farm Road Water Main Extension and Holly Springs Interconnection Project exceeded the project’s approved budget. Staff recommend that Council reject all bids received on June 10, 2025, which will allow staff to review the…
-
Speaker : Jamie Revels, Utilities Executive Summary: Cary’s water main replacement program is a key component of maintaining safe and reliable water service. This year’s water main replacement project will invest approximately $4 million into water main maintenance and improvements that will benefit Cary. This year’s…
-
referred · This Agenda Item was referred to the Planning Board.
-